Vansycle Wind Project

Last updated

The Vansycle I Wind Project (formerly Vansycle Wind Project) is a wind farm in Umatilla County, Oregon. It consists of 38 Vestas 0.66 MW wind turbines at the upper end of Vansycle Canyon with a collective nameplate generating capacity of 25.08 MW. The project was the first commercial wind energy project constructed and operated in Oregon [1] and began operation in December 1998. [2]

The wind turbines were constructed on leased portions of privately owned farms thereby sparing developers from buying property for the turbines and allowing farmers to generate extra income. [3] Like nearby Stateline Wind Project, Vansycle Wind Project is owned and operated by NextEra Energy Resources formerly known as FPL Energy.

The approximate center of the wind farm is located about 17 miles (27 km) west-southwest of Walla Walla, Washington 45°55′23″N118°37′48″W / 45.923°N 118.630°W / 45.923; -118.630 . The project consists of two separate strings of 28 and 10 turbines respectively. The center of the western string of 28 turbines is located at about 45°56′20″N118°39′54″W / 45.939°N 118.665°W / 45.939; -118.665 (Vansycle I Wind Farm western string) . The center of the eastern string of 10 turbines is located at about 45°55′16″N118°36′18″W / 45.921°N 118.605°W / 45.921; -118.605 (Vansycle I Wind Farm eastern string) .

relative location
of edges
location
NW end 45°56′56″N118°40′48″W / 45.949°N 118.680°W / 45.949; -118.680 (Vansycle Wind farm NW end)
SE end 45°55′05″N118°36′00″W / 45.918°N 118.600°W / 45.918; -118.600 (Vansycle Wind farm SE end)

The Vansycle II Wind Project consists of 43 Siemens 2.3 MW wind turbines for a total nameplate generating capacity of 98.9 MW and is erected to the east and south of the earlier Vansycle I Wind Power project. The Vansycle II project went into commercial operation on December 7, 2009.

See also

Related Research Articles

<span class="mw-page-title-main">Stateline Wind Farm</span>

The Stateline Wind Farm is a wind farm located on Vansycle Ridge, which receives 16 to 18 mph average wind speeds from the Columbia Gorge, on the border between Washington and Oregon in the United States. With 454 turbines, it is the largest wind project in the Northwestern United States. Costing $300 million to build, it began operation in 2001.

Gray County Wind Farm near Montezuma, Kansas was the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission back in 2001. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million. The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland.

<span class="mw-page-title-main">Blue Canyon Wind Farm</span> Wind farm in Oklahoma, USA

Blue Canyon Wind Farm is the largest wind farm in Oklahoma, United States. The project, located in the Slick Hills north of Lawton, consists of four phases with a total output of 423.45 MW. As of 2008, Blue Canyon remains Oklahoma's largest wind farm; however, several organizations including Oklahoma Gas & Electric plan to greatly increase Oklahoma's wind power capacity, and future projects may be larger.

The Alto Minho Wind Farm in the Viana do Castelo district, of Portugal, became fully operational in November 2008, when Portugal's Economy Minister Manuel Pinho inaugurated it. At the time of completion, it was Europe's largest on-shore wind farm. The wind farm began generating electricity in 2007, with production increasing as more wind turbines came online, reflecting the modular nature of wind farms. The wind farm consists of 68 Enercon E-82 2MW wind turbines and 52 Enercon E-70 E4 2MW turbines, totaling 136 MW and 104 MW, respectively, for a grand total of 240 MW of nameplate capacity. The wind farm will produce 530 GWh annually, avoiding 370,000 tonnes of carbon dioxide emissions.

Wind power in Ohio has a long history, and as of 2016, Ohio had 545 megawatts (MW) of utility-scale wind power installations installed, responsible for 1.1% of in-state electricity generated. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as total wind power capacity in the state was just 9.7 MW in 2010. By 2019, there were 738 MW of capacity, which generated 1.71% of Ohio's electricity.

<span class="mw-page-title-main">Fowler Ridge Wind Farm</span> Wind farm in Indiana, USA

The Fowler Ridge Wind Farm is a wind farm in Benton County, Indiana, near the city of Fowler, IN about 30 miles (48 km) northwest of Lafayette and 90 miles (140 km) northwest of Indianapolis. Fowler Ridge was originally developed in 2005 and 2006 by Orion Energy, LLC and Vision Energy, LLC and later sold in 2007 to BP and Dominion Resources. The project was constructed beginning in 2008 in two phases and has a nameplate capacity of 600 MW.

<span class="mw-page-title-main">Shiloh wind power plant</span>

The Shiloh wind power plant is a wind farm located in the Montezuma Hills of Solano County, California, USA, close to Bird's Landing and Collinsville, 40 miles (64 km) northeast of San Francisco. It has a nameplate capacity of 505 megawatts (MW) of power and was built in four stages between 2005 and 2012. Several additional projects are also located in the Montezuma.

There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.

The Underwood Wind Farm is a wind farm located in Bruce County, Ontario, near the shores of Lake Huron. It was developed by Enbridge Inc., a Canadian corporation better known for involvement in fossil fuels and their distribution.

New York has 2,192 MW of installed wind power capacity as of 2022. Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of June 2023, wind power in the Netherlands has an installed capacity of 8,794 MW, 27.9% of which is based offshore. In 2019, the wind turbines provided the country with 12% of its electricity demand during the year, a figure that is growing but somewhat below the average of 15% that wind power provides across the whole of the EU's electricity consumption. The Dutch are trying to meet the EU-set target of producing 14% of total energy use from renewable sources by 2020, and 16% by 2023. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

The Leaning Juniper Wind Project is an electricity generating wind farm facility located in Gilliam County, Oregon, United States with a total generating capacity of 301.5 megawatts. It is owned by PacifiCorp and began operations in 2006. Leaning Juniper I became operational in September 2006 with 67 1.5 MW wind turbines with a capacity of 100.5 megawatts. "Leaning Juniper II includes 133 GE 1.5 MW wind turbines with a capacity of 201 MW. This phase came online in 2011." The Jones Canyon Substation was built as part of this project and to support other wind projects in the area.

Wind power in Indiana was limited to a few small water-pumping windmills on farms until 2008 with construction of Indiana's first utility-scale wind power facility, Goodland with a nameplate capacity of 130 MW. As of September 2017, Indiana had a total of 1897 MW of wind power capacity installed, ranking it 12th among U.S. states. Wind power was responsible for 4.8% of in-state electricity production in 2016.

<span class="mw-page-title-main">Meadow Lake Wind Farm</span> Wind farm in Indiana, USA

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

The Dry Lake Wind Power Project in Navajo County is the first and the largest utility-scale wind farm in the U.S. state of Arizona. Starting in 2009, it was constructed in two phases having a total generating capacity of 128.1 megawatts (MW), and is selling the electricity to the Salt River Power District (SRP).

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

The Camp Grove Wind Farm is a 100-turbine wind farm composed of GE 1.5MW 77 meter rotor and with 80 meter hub height wind turbines in Marshall County and Stark County Illinois, north of the city of Peoria. The owner of the project is Camp Grove Wind Farm LLC, which is owned by subsidiaries of Orion Energy Group LLC, Vision Energy, LLC and other investors. The project is managed by Orion Energy Group LLC, and, at 1.5 megawatts per General Electric turbine, has a nameplate capacity of 150 megawatts (mW).

The Rolling Hills Wind Farm may be one of two wind farms, one in Wyoming, the other in Iowa.

The following outline is provided as an overview of and topical guide to wind energy:

<span class="mw-page-title-main">Wind power in Michigan</span> Electricity from wind in one U.S. state

Wind power in Michigan is a developing industry. The industrial base from the automotive industry has led to a number of companies producing wind turbine parts in the state. The development of wind farms in the state, however, has lagged behind. In January 2021, there were a total of 1,481 wind turbines in the state with a nameplate capacity of 2,549 MW. The nameplate total exceeded 2,000 MW when Pine River came online in March 2019. Wind provided 4.2% of the state's electricity in 2016.

References

  1. Arvizu, Dan E. "Advanced Energy Technology and Climate Change Policy Implications" (PDF). Archived from the original (PDF) on 2006-01-18. Retrieved 2006-05-15.
  2. "Wind Energy Information". Oregon Department of Energy. Archived from the original on 2006-06-02. Retrieved 2006-05-15.
  3. "Catching Up To Tomorrow". The Energy Activist. Archived from the original on January 8, 2005. Retrieved 2006-05-15.
Map all coordinates using: OpenStreetMap  
Download coordinates as: KML