Zeepipe pipeline system | |
---|---|
Location | |
Country | Norway, Belgium |
From | Kollsnes |
Passes through | Sleipner field, Draupner field |
To | Zeebrugge |
General information | |
Type | natural gas |
Owner | Gassled |
Operator | Gassco |
Technical service provider | Statoil |
Contractors | Halliburton |
Commissioned | 1993 |
Technical information | |
Length | 1,416 km (880 mi) |
Maximum discharge | 15 billion m3/y (Zeepipe I) 26.3 billion m3/y (Zeepipe IIA) 25.9 billion m3/y (Zeepipe IIB) |
Diameter | 40 in (1,016 mm) |
The Zeepipe is a natural gas transportation system to transport North Sea natural gas to the receiving terminal at Zeebrugge in Belgium.
The total costs of Zeepipe system is around 24.2 billion NOK. It is owned by Gassled partners and operated by Gassco. The technical service provider is Statoil. The Zeebrugge receiving terminal is owned by Fluxys (51%) and Gassled partners (49%).
The Zeepipe I pipeline was commissioned on 1 October 1993. The 814-kilometre-long (506 mi) pipeline runs from Sleipner field to Zeebrugge. The pipeline has a diameter of 40 inches (1,000 mm) and its capacity is 15 billion cubic meters of natural gas per year. At the time of construction, it was the longest and largest offshore pipeline in the world. [1] It was more than twice as long as the next largest single-section offshore pipeline in the world. [2]
Originally, there was a plan to build an intermediate service platform to the pipeline to tie in future compression facilities and to enable the pipeline to be pigged in two sections. However, due to technological development it is possible to serve the pipeline as one pigging segment and the need for the service platform was eliminated. [1] [2]
The second section of Zeepipe I consists of a 30-inch (760 mm) pipeline from Draupner S to Sleipner. It links Zeepipe with Statpipe. [2]
The contract for pre-commissioning and commissioning of Zeepipe 1 was awarded to Halliburton Oilfield Services Inc. Halliburton awarded engineering and procurement sub-contracts to Brown and Root Engineering Ltd. [2] The pipeline was laid by Semac 1 and Castoro Sei pipe-laying ships. [3]
Zeepipe II A, operational since 1996, is 303 kilometres (188 mi) long 40-inch (1,000 mm) pipeline from Kollsnes gas processing plant in Norway to Sleipner Riser. The capacity of Zeepipe II A is 26.3 billion cubic meters per year.
Zeepipe II B, operational since 1 October 1997, runs from Kollsnes to Draupner E. The length of 40-inch (1,000 mm) Zeepipe II B is 299 kilometres (186 mi) and the capacity is about 25.9 billion cubic meters per year.
Ormen Lange is a natural gas field on the Norwegian continental shelf. It is situated 120 kilometres (75 mi) northwest of Kristiansund, where seabed depths vary between 800 and 1,100 metres. The field is named after the famous longship Ormen Lange of Olaf Tryggvason, a 10th-century Viking king of Norway.
The Langeled pipeline is an underwater gas pipeline transporting Norwegian natural gas to the United Kingdom. Before the completion of the Nord Stream 1 pipeline, it was the longest subsea pipeline in the world.
Gassco is a Norwegian state owned company that operates 7,800 kilometres (4,800 mi) of natural gas pipes transporting annually of 100 billion cubic meter (bcm) of natural gas from the Norwegian continental shelf to Continental Europe and Great Britain.
Medgaz is a submarine natural gas pipeline between Algeria and Spain.
The Arab Gas Pipeline is a natural gas pipeline in the Middle East. It originates near Arish in the Sinai Peninsula and was built to export Egyptian natural gas to Jordan, Syria, and Lebanon, with branch underwater and overland pipelines to and from Israel. It has a total length of 1,200 kilometres (750 mi), constructed at a cost of US$1.2 billion.
The Trans-Mediterranean Pipeline is a natural gas pipeline from Algeria via Tunisia to Sicily and thence to mainland Italy. An extension of the TransMed pipeline delivers Algerian gas to Slovenia.
Vesterled is a natural gas pipeline system, which runs from the Heimdal field in the North Sea to St Fergus Gas Plant near Peterhead in Scotland. The name Vesterled is the term used by the Vikings for their westward voyages, i.e. vesterled = "the way westward".
The Franpipe is a 840 kilometres (520 mi) long natural gas pipeline from the Draupner E riser in the North Sea to the receiving terminal at Port Ouest in Dunkirk, France. The gas transported to France originates mainly from Sleipner East and Troll Vest gas fields. The pipeline was officially inaugurated on 9 October 1998.
Europipe I is a 670-kilometre-long (420 mi) natural gas pipeline from the North Sea to Continental Europe.
Europipe II is a natural gas pipeline from the Kårstø processing plant north of Stavanger to a receiving terminal at Dornum in Germany. It came on stream on 1 October 1999.
Norpipe is a subsea oil and natural gas pipelines system in the North Sea. It supplies oil from the Norwegian Ekofisk and associated fields in the North Sea to the United Kingdom and natural gas to Germany.
The West African Gas Pipeline (WAGP) is a natural gas pipeline to supply gas from Nigeria's Escravos region of the Niger Delta area to Benin, Togo and Ghana. It is the first regional natural gas transmission system in sub-Saharan Africa.
White Stream is a proposed pipeline project to transport natural gas from the Caspian region to Romania and Ukraine with further supplies to Central Europe.
Kollsnes is a natural gas processing plant operated by Equinor on the southern part of the island of Oøy in Øygarden Municipality in Vestland county, Norway. It processes the natural gas from the Troll, Kvitebjørn, and Visund gas fields. Kollsnes has a capacity of 143,000,000 cubic metres (3.8×1010 US gal) of natural gas per day.
The Sleipner gas field is a natural gas field in the block 15/9 of the North Sea, about 250 kilometres (160 mi) west of Stavanger, Norway. Two parts of the field are in production, Sleipner West, and Sleipner East (1981). The field produces natural gas and light oil condensates from sandstone structures about 2,500 metres (8,200 ft) below sea level. It is operated by Equinor. The field is named after the steed Sleipnir in Norse mythology.
Skanled was a planned natural gas offshore pipeline connecting Norway to Sweden and Denmark.
The Statpipe pipeline is a natural gas system, which links northern North Sea gas fields with the Norway's gas export system. It transports gas from Statfjord, Gullfaks, Heimdal, Veslefrikk, Snorre, Brage and Tordis gas fields.
Gassled is a partnership to own the offshore natural gas transportation infrastructure at the Norwegian continental shelf. Its pipelines are operated by Gassco.
The Draupner platform is a gas platform for the extraction of natural gas in the North Sea consisting of the Draupner S and E riser platforms. It is located in the Norwegian North Sea block 16/11 160 km (99 mi) offshore from Norway. The complex consists of seven risers and two riser platforms standing in 70 m (230 ft) water depth and linked by a bridge. Draupner E is the first major oil platform using jacket-type construction supported on a bucket foundation and suction anchors. The complex is owned by Gassled and operated by Gassco. The technical service provider is Equinor.
The Giurgiu–Ruse pipeline will be a natural gas pipeline from Giurgiu in Romania to Ruse in Bulgaria diversifying natural gas suppliers and delivery routes for the two countries and connects the two natural gas national grids. The Giurgiu–Ruse pipeline will be part of the larger New European Transmission System meant to unite Central and South Eastern Europe's natural gas transmission networks.