Baie Comeau (2012 ship)

Last updated

MV Baie Comeau departs Two Harbors (14778742998).jpg
Baie Comeau leaving Two Harbors, Minnesota
History
NameBaie Comeau
Operator Canada Steamship Lines
Port of registryFlag of Canada (Pantone).svg  Canada
BuilderChengxi shipyard, Jiangyin
Yard numberCX9304
Laid down27 July 2012
Launched21 August 2012
Completed20 June 2013
Identification
StatusIn active service
General characteristics
Class and type Trillium-class freighter
Tonnage
  • 24,430  GT
  • 34,402  DWT
Length225.5 m (739 ft 10 in)
Beam23.76 m (77 ft 11 in)
Draught9 m (29 ft 6 in)
Installed power1 x IMO Tier III MAN B&W 6S50ME diesel engine, 8,750 kW (11,730 hp)
Propulsion1 shaft

Baie Comeau is the fourth and last self-unloading lake freighter in Canada Steamship Lines (CSL) Trilliumclass. Like her sister ships, Baie St. Paul, Thunder Bay, and Whitefish Bay she was built in China, being launched in 2012 and entered service in 2013.

Contents

Design and description

Baie Comeau is a self-unloading lake freighter in service on the North American Great Lakes and St. Lawrence Seaway. The fourth of the CSL Trilliumclass, [1] [2] the vessel, according to the Miramar Ship Index, has a gross tonnage (GT) of 32,000 tons and a deadweight tonnage (DWT) of 37,690 tons. [3] However, on the CSL website, the ship is stated as having a GT of 24,430 and DWT of 34,490 tons. [4] While Equasis, the ship registry of the French Ministry of Transport states the gross tonnage of the vessel is 24,430 and the deadweight tonnage is 34,402. [5]

Baie Comeau is 225.5 metres (739 ft 10 in) long overall with a beam of 23.76 metres (77 ft 11 in). [3] Baie Comeau has a maximum draught of 9 metres (29 ft 6 in). The ship is powered by one IMO Tier III MAN B&W 6S50ME diesel engine driving one shaft creating 8,750 kilowatts (11,730  hp ). [6] The vessel has a maximum speed of 13 knots (24 km/h; 15 mph). [3] The ship is equipped with five holds and has a net hold capacity of 41,917.96 m3 (1,480,319 cu ft). The vessel has an average unloading rate of 5,450 tonnes (5,360 long tons ; 6,010 short tons ) per hour. [4]

Construction and career

Baie Comeau was constructed at the Chengxi shipyard in Jiangyin, China with the yard number CX9304. The ship was laid down on 27 July 2012 and launched on 21 September later that year. [3] Completed on 20 June 2013, Baie Comeau left China on 30 June, arrived in Montreal, Quebec, on 24 August. [7] The ship is registered in Canada and has the IMO number 9639892. [3]

In an inaugural salute to the completion of its first voyage carrying cargo, Claude Dumais, CSL's vice president of technical operations, presented Christine Brisson, mayor of Baie-Comeau, with an 2.4-metre (7.9 ft) model of the vessel, which will be displayed in the city's municipal offices. [8] In April 2018, a strike by CSL's shipping deck officers led to all of CSL's self-unloading ships being laid up until the strike could be mediated, with Baie Comeau remaining at Thunder Bay, Ontario. [9]

The Quebec & Ontario Transportation Company launched an earlier vessel named Baie Comeau in 1954. [10]

Related Research Articles

Canada Steamship Lines (CSL) is a shipping company with headquarters in Montreal, Quebec, Canada. The business has been operating for well over a century and a half.

Lake freighter Ship type

Lake freighters, or lakers, are bulk carrier vessels that ply the Great Lakes of North America. These vessels are traditionally called boats, although classified as ships.

MV <i>Coastal Renaissance</i> Canadian ferry operated by BC Ferries

MV Coastal Renaissance is the first of three Coastal-class ships delivered to BC Ferries. At the time of their construction, the Coastal-class ferries were the largest double-ended ferries in the world. This ship operates mainly on the Departure Bay – Horseshoe Bay route in the peak season and on the Swartz Bay – Tsawwassen route in the low season, but can replace her sister ships on any of the major cross-Strait routes whenever they go for refits.

MV <i>Algocape</i> Canadian lake freighter

MV Algocape was a Canadian lake freighter operated by Algoma Central Corp. Initially constructed for Canada Steamship Lines as Richelieu, the ship was sold to Algoma Central Corp in 2004 and renamed Algocape. In 2012, the ship was sold again to Dido Steel Corporation and renamed Goc and broken up for scrap.

MV <i>Algoma Mariner</i>

Algoma Mariner is a Canadian lake freighter delivered to Algoma Central on 31 May 2011. The bulk carrier was the first new Canadian-flagged vessel on the Great Lakes in 25 years. Algoma Mariner is a Seawaymax vessel, designed to carry dry bulk through the Saint Lawrence Seaway and Great Lakes. The vessel was constructed at the Chengxi Shipyard in China and is currently in service.

<i>Baie St. Paul</i> (2012 ship)

Baie St. Paul is a Trillium-class lake freighter operated on the Great Lakes by the Canada Steamship Lines (CSL). The ship entered service in 2012.

<i>Atlantic Superior</i>

Atlantic Superior was a self-unloading bulk carrier owned and operated by Canada Steamship Lines (CSL). The ship was constructed in 1981, launching in 1982 and was the first self-unloading vessel designed, for ocean service, built for CSL. In 1997 the vessel was operated on behalf of National Gypsum Company as M.H. Baker III. In 2003, the ship returned to her former name Atlantic Superior. She was sold for scrap and broken up at Xinhui by Jiangmen Zhong Xin Shipbreaking in 2015.

<i>English River</i> (ship) Canadian lake freighter and bulk carrier, launched in 1961

English River was a lake freighter and bulk carrier, launched in 1961 by Collingwood Shipyards of Collingwood, Ontario. In her initial years she carried bulk cargoes and deck cargoes to smaller ports on the Great Lakes and Saint Lawrence River watershed and estuary. In 1973, the vessel was converted into a cement carrier and carried mainly raw cement for the construction industry. The ship continued to operate until English River was removed from service and sold for scrap.

<i>Stephen B. Roman</i> (ship)

Stephen B. Roman was a Canadian bulk carrier operating on the Great Lakes owned by Lake Ontario Cement Company. The vessel was initially launched as Fort William in 1965 and owned and operated by Canada Steamship Lines. She carries dry cement to Great Lakes ports, and is named after prominent Canadian mining engineer Stephen Boleslav Roman. The ship was taken out of service in November 2018.

MV <i>Saginaw</i>

The lake freighter MV Saginaw was launched as John J. Boland in 1953, the third vessel to bear that name. John J. Boland was owned and operated by the American Steamship Company and constructed by Manitowoc Shipbuilding Company at Manitowoc, Wisconsin. In 1999, the ship was sold to Lower Lakes Towing and renamed Saginaw. The ship is currently in service.

<i>CSL Tecumseh</i>

CSL Tecumseh is a self-unloading Panamax bulk carrier that entered service with Canada Steamship Lines (CSL) in 2013. The ship is currently registered in Nassau, Bahamas.

<i>Thunder Bay</i> (ship)

Thunder Bay is a Trillium-class lake freighter cargo vessel, built and launched in China in 2013. The ship is owned, and operated on the Great Lakes, by the Canada Steamship Lines (CSL). Like her three sister ships in CSL's Trillium class, Baie St. Paul, Baie Comeau, and Whitefish Bay, the vessel is a self-unloading bulk carrier, with a conveyor belt on a long boom that can be deployed over port or starboard sides.

<i>Whitefish Bay</i> (2012 ship)

Whitefish Bay is a self-unloading lake freighter that entered service with Canada Steamship Lines (CSL) in 2013. Built in China, the vessel is the third of CSL's Trillium-class ships. Her sister ships are Baie Comeau, Baie St. Paul and Thunder Bay. Whitefish Bay is used primarily to transport goods on the North American Great Lakes and the St. Lawrence Seaway.

<i>Pineglen</i>

Pineglen was a bulk carrier owned and operated by Canada Steamship Lines. She was built at the Collingwood Shipyards, in Collingwood, Ontario in 1985, to a single superstructure lake freighter design. Initially named Paterson, the vessel was sold to Canada Steamship Lines in 2002 and renamed. Unlike more modern lake freighters she was built to a "straight-deck" design – i.e. she was not equipped with a self-unloading boom. The vessel was sold for scrap in 2017.

<i>Algoma Compass</i>

Algoma Compass, formerly Roger M. Kyes and Adam E. Cornelius, is a self-unloading bulk carrier built in Toledo, Ohio in 1973 for the American Steamship Company. The bulk carrier carried bulk cargoes throughout the Great Lakes and St. Lawrence Seaway. The vessel has earned a reputation as a "hard luck" ship, experiencing mechanical failures and groundings. In 2018, the ship was acquired by Algoma Central and put in service as Algoma Compass.

Algoma Navigator was a Canadian bulk carrier operated by Algoma Central. Like other bulk carriers, her potential cargoes included: coal/coke, aggregates, slag, iron ore/oxides, salt, fertilizers, grain products, gypsum, quartzite, or sand. The vessel was constructed by John Readhead & Sons in the United Kingdom in 1967 for the Cambay Steamship Company and launched as Demeterton. The vessel was enlarged in 1967 and sold in 1975 to the Upper Lakes Group which renamed the ship St. Lawrence Navigator. In 1979, the vessel was renamed Canadian Navigator after a rebuild. In 2011, the ship was sold to Algoma and became Algoma Navigator. In 2016, the bulk carrier was renamed Navi before being sold for scrap and broken up in 2016.

<i>CSL Tadoussac</i>

CSL Tadoussac is a lake freighter currently operated by Canada Steamship Lines (CSL) on the Great Lakes. She was launched in 1969. Initially named Tadoussac, following her refit in 2001, she was renamed CSL Tadoussac She was the last freighter built for CSL in the traditional two superstructure design, which puts her bridge up in the ship's bow. The vessel primarily transports iron ore and coal.

Trillium-class freighter

The Trillium class is a series of freighters owned by Canada Steamship Lines (CSL). The class is divided into three subclasses; the self-discharging lake freighters, the lake bulk carriers, and the Panamax self-discharging bulk carriers. Initially a nine-ship building program, six are operated by Canada Steamship Lines for use on the Great Lakes, while three are operated by CSL Americas for international trade. Two more ships were acquired later for use by CSL Americas.

<i>Radcliffe R. Latimer</i>

Radcliffe R. Latimer is a lake freighter launched in 1978. The vessel is owned by Algoma Central but operated under charter to Canada Steamship Lines from 1994 to 1997. As Algobay, the bulk carrier was involved in a collision with another lake freighter in 1980. In 2009 the vessel was rebuilt in China for service in the Caribbean Sea. The vessel is currently in service.

<i>Algoma Provider</i>

Algoma Provider was a Canadian lake freighter, which operated from 1963 to 2013 under the flag of several shipping lines. She was built to seawaymax dimensions at the Collingwood Shipyards in Collingwood, Ontario for Canada Steamship Lines. She was powered by a steam turbine, and was the company's last steam-powered vessel. Initially named Murray Bay, the ship was sold in 1994 to Upper Lakes Shipping, which renamed the vessel Canadian Provider. In 2011, Upper Lakes Shipping sold its entire fleet to Algoma Central, which renamed the lake freighter Algoma Provider. The vessel continued in service until 2013, when she was sold to be broken up for scrap. The ship was renamed Ovi for her journey to the scrapyard in Turkey. During her career, the ship carried bulk cargoes to destinations along the Saint Lawrence Seaway and Great Lakes.

References

  1. "The Baie Comeau, CSL's fourth Trillium-Class laker, arrives from Transoceanic voyage". canadiansailings.ca. 23 September 2013. Retrieved 22 June 2016. Canada Steamship Lines welcomed the final of four Trillium Class self-unloading lakers, the Baie Comeau. The vessel arrived in the port of Montreal on August 24. The Baie Comeau's maiden voyage began on June 30 when it set sail from Chengxi Shipyard in Jiangyin, China.
  2. "Maiden voyage begins for Baie Comeau, the latest Trillium Class self unloader". Boatnerd.com . Archived from the original on 22 July 2013. Retrieved 2 July 2013. The Baie Comeau was preceded by the Whitefish Bay and Thunder Bay, both departing in May on their maiden voyages, and also by the award-winning Trillium Class self-unloader Baie St. Paul in 2012.
  3. 1 2 3 4 5 "Baie Comeau (9639892)" . Miramar Ship Index . Retrieved 22 June 2016.
  4. 1 2 "Baie Comeau". CSL Group. Retrieved 22 June 2016.
  5. "Baie Comeau (9639892)" . Equasis. French Ministry for Transport . Retrieved 15 January 2018.
  6. "CSL'S Trillium Class Laker". CSL Group. Retrieved 22 June 2016.
  7. "The MV Baie Comeau, CSL's Fourth Trillium Class Laker, Arrives from Transoceanic Voyage". CSL Group. 24 August 2013. Retrieved 22 June 2016.
  8. "The MV Baie Comeau Celebrated in Namesake City". Canada Steamship Lines. 7 October 2013. Archived from the original on 25 January 2014. Canada Steamship Lines (CSL) held a celebration today to salute the maiden voyage of the fourth newly built Trillium Class Laker, the MV Baie Comeau, to her namesake city.
  9. "Mediation underway as Canada Steamship Lines deck officer strike continues". CBC News. 25 April 2018. Retrieved 17 May 2021.
  10. Gillham, Skip (7 November 2013). "Unknown end for old Baie Comeau". Port Colborne Leader . Retrieved 22 June 2016. Lloyds Register for Shipping deleted the ship from its listings in 1986 with the notation "continued existence in doubt".