Basingstoke and Alton Light Railway

Last updated

Basingstoke and Alton
Light Railway
Basingstoke-and-Alton-Light-Railway-track-section.jpg
Section of vintage track representing the
Basingstoke and Alton Light Railway,
on the Viables Roundabout in Basingstoke.
Overview
StatusClosed
Owner London and South Western Railway
Southern Railway
Locale Basingstoke
Hampshire
Termini
  • Basingstoke
  • Alton
Service
TypeLight rail
Operator(s) London and South Western Railway
Southern Railway
History
Opened1901
ClosedJanuary 1917,
reopened August 1924,
final closure 12 September 1932 (passengers)
1936 (freight)
Technical
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Route map

Contents

BSicon STRc2.svg
BSicon d-CONT3.svg
BSicon STRc2.svg
BSicon BHF3+1.svg
BSicon dSTRc4.svg
Basingstoke
BSicon dSTRc2.svg
BSicon ABZ1+3f.svg
BSicon STRc4.svg
BSicon dCONT1-.svg
BSicon lENDE@G.svg
BSicon STRc4.svg
BSicon exABZg+nl.svg
BSicon exnKBSTeq.svg
BSicon exFACTORY.svg
Thornycroft sidings
BSicon exSKRZ-G2.svg
Viables level crossing
BSicon exHST.svg
BSicon exWindPump.svg
Cliddesden
BSicon exSKRZ-G2.svg
Bushywarren Lane crossing
BSicon exSKRZ-G2.svg
Bagmore Lane crossing
BSicon exHST.svg
Herriard
BSicon exSKRZ-G2.svg
Salter Hatch crossing (Spain Lane)
BSicon exHST.svg
BSicon exWindPump.svg
Bentworth and Lasham
BSicon exSKRZ-G2.svg
level crossing
BSicon expHST.svg
Treloar's Hospital Platform (private)
BSicon exnKBSTaq.svg
BSicon exABZgnr.svg
Treloar's Hospital siding
BSicon exdSTRc2.svg
BSicon exSTR3.svg
BSicon STRc2.svg
BSicon d-CONT3.svg
BSicon exdSTR2+1.svg
BSicon exSTRc34.svg
BSicon STRc2.svg
BSicon HST3+1.svg
BSicon dSTRc4.svg
Alton
BSicon exdSTRc1.svg
BSicon dSTRc2.svg
BSicon ABZ1+3xf.svg
BSicon exSTR1+4.svg
BSicon dSTRc4.svg
BSicon dCONT1-.svg
BSicon xSTR+c4.svg
BSicon exCONTf.svg

The Basingstoke and Alton Light Railway was opened in 1901, by the London and South Western Railway. It was the first English railway authorised under Light Railway legislation. It ran through unpromising, lightly populated terrain, and was probably built only to exclude competitors from building a line in the area. It had steep gradients and a line speed limit of 20 mph, later raised to 25 mph.

It never attracted much business and the hoped-for through traffic never materialised. When the War Office demanded recovered track for laying in France, during the First World War, the LSWR closed the line and lifted the track, in 1917.

After the war, local pressure mounted to reinstate the railway; this was resisted by the Southern Railway, which had taken over from the LSWR. The SR had no wish to spend considerable sums to reopen a railway that had lost money and had no positive prospects. A House of Lords Committee effectively forced the SR to resume operation, which it did in 1924. Losses mounted and business declined further, and the line was closed to passengers in 1932, with limited goods services continuing until 1936.

Before closure a film company staged a train crash with the co-operation of the LSWR, and the event appeared in a feature film.

History

Early proposals

The London and Southampton Railway completed its line in 1839, and reached Gosport the following year. Gosport was its station for Portsmouth, which with Southampton was important because of its maritime connection. The London and Southampton Railway changed its name to the London and South Western Railway (LSWR), and became the dominant railway operator in the area south of Basingstoke.

In 1848 a small chink in that dominance was created when the Great Western Railway, a great rival to the LSWR, opened a line from Reading to Basingstoke. [1]

In 1865 the Mid-Hants Railway opened its line between Alton and Winchester. It had been promoted independently, hoping to form a new through route between London and Southampton. This did not endear it to the LSWR, for whom their main line route to Southampton was a prime part of its business, but the LSWR worked the line, and later absorbed it. It never rose to commercial success. In 1885 another incursion into the LSWR area of influence was made, when the Didcot, Newbury and Southampton Railway opened its north – south line. It was sponsored by the Great Western Railway, but it failed to generate enough investment to pay to reach Southampton, and its Winchester extremity forced it to rely on the LSWR. [1]

Many of the lines on the district seemed to be on a north-east to south-west trajectory, leading from London to points on the Hampshire or Dorset coast. From time to time, lines running directly from north to south were put forward. The topography in that direction was difficult, consisting of high ground between deep broad valleys. At the same time the chalk geology led to poor agricultural land and a low population density. [1]

In 1884 the Great Western Railway and the LSWR had agreed on territorial boundaries: neither would encourage the building of new lines that encroached on the established area of the other. When in the same year a Basingstoke to Alton Railway was proposed independently, it received no support from the LSWR, on which it would be dependent at each end, and the scheme foundered. [2] The London Brighton and South Coast Railway made a similar agreement, and schemes for new railways from Portsmouth northward, pressed for by Portsmouth interests, ran into the same obstacle. [3]

In 1896 a Portsmouth, Basingstoke and Godalming Railway Bill came to Parliament. It failed, but the LSWR board decided that they needed to respond to the pressure for such a line, in case some rival might do so instead. The Basingstoke connection might invite the LBSCR (at Portsmouth) to link up with the GWR (at Basingstoke). On 25 June 1896 the LSWR Board approved two new schemes: a Basingstoke to Alton line, and a line from Alton down the Meon Valley to Fareham. [3]

Reason to build the line

Basingstoke and Alton Light Railway system in 1903 Bas & alt rly.png
Basingstoke and Alton Light Railway system in 1903

The line was designed to run through a thinly populated agricultural area. Although it connected neatly on a map to the (proposed) Meon Valley Railway, it would be a 20 mph light railway, with several 10 mph open level crossings, and it was unlikely to form part of a trunk route. [4] [5] [6]

Dean, etc., wrote that "It has been said that the LSWR planned the Light Railway as a "blocking line", to keep the GWR out of its territory. There is no evidence that this was so." [3]

Kelly, writing in 1900 was quite sure that the line was built as a spoiler against a Great Western Railway connection to Portsmouth:

Some little time ago the Great Western had a project for connecting Paddington and Portsmouth by a railway, running through the same district... Thus the London and South Western have secured for themselves another preserve, and when the Meon Valley Line is finished, there will be a connection between Portsmouth and Salisbury. "There are not enough people along the route to pay for grease for the engines", a man was heard pointedly to observe, but we may see plenty of heavy goods trains run along this light railway, as it is called." [7]

Maggs is quite explicit:

When the GWR proposed a line from Basingstoke to Portsmouth, the House of Lords Committee decided that a light railway, or railways, for Basingstoke-Alton-Fareham would be adequate as Portsmouth was already well-served by main lines. The result was that the LSWR constructed the Basingstoke & Alton Light Railway and the Alton to Fareham line. [8]

Authorisation

Herriard railway station Herriard Railway Station.jpg
Herriard railway station

Coincidentally in 1896 the Light Railways Act was passed. This was designed to stimulate local transport development by enabling the authorisation of railway schemes without the expense of getting a Parliamentary Bill. The LSWR Board saw that their proposed line between Basingstoke and Alton was well suited for construction as a light railway, and on 31 December 1896 an application to the Light Railway Commissioners was lodged. The cost would be £66,714. In an indication of the traffic volumes expected, there was to be a burrowing junction at Basingstoke, so that arriving trains could enter the up (north) side of the LSWR station. At Alton the railway would make a junction with the Mid-Hants Line some distance west of Alton, entering Alton over that line. The junction was later named Butts Junction. [9]

The authorisation process was not swift, and it was on 9 December 1897 that the Light Railway Order was issued. The sum of £51,000 could be raised for the construction. Land for a double track was purchased, but earthworks were made for a single line only. It was the first English railway authorised under the Light Railways Act. [10] [11]

Although the Light Railway Order had been passed, taking into account submissions from public bodies, some local authorities nevertheless made a number of objections at this stage. The objectors were very persistent, and after an appeal hearing on 28 June 1899, the railway company was directed to provide gates at five level crossings, incurring additional staff costs, and to alter the planned location of the Cliddesden station. [12]

Major Pringle of the Board of Trade inspected the line on 7 May 1901, and apart from some minor matters, found it satisfactory for passenger operation.

Opening of the line

Cliddesden Railway Station Cliddesden Railway Station.jpg
Cliddesden Railway Station

The line opened on 1 June 1901. [13] About 50 tickets were sold on the first day. The planned burrowing junction at Basingstoke was never built. [8]

A local newspaper observed "The man in the street expects to find the village somewhere near the station. But such little details do not trouble the promoters of railways... The three intermediate stations are named Cliddesden, Herriard, and Bentworth & Lasham respectively. But the villages bearing those names are a long way from the stations and not a glimpse of them can be seen from the train." [14]

The train service was three mixed trains each way daily except Sundays, shortly increased to four. [15] The line climbed at 1 in 50 for much of the way from Basingstoke nearly seven miles to Herriard, where there was a passing loop. From there it fell at a similar gradient for nearly a mile and a half, afterwards descending at more moderate gradients. There were numerous sharp curves on the line. The general speed limit was set at 20 mph, reduced to 10 mph on certain curves and approaching several level crossings. [16]

Poor traffic volumes

The income from the line was disappointingly low, and on 1 July 1904 railmotors were introduced on the line, the two examples having been constructed specially. Braking was by hand only and lighting by oil. They were not operationally successful, being incapable of surmounting the steep gradients on the line, and of handling goods wagons in a mixed train formation. They were redeployed elsewhere on 12 August 1904. [17] [8]

On reinstatement of conventional train operation, the train service was increased to five passenger trains and a separate goods train. The change incurred additional operating costs, but saved considerable journey time, as the passenger trains were not required to shunt at goods sidings. In April 1905 permission was given from the Board of Trade to increase the line speed to 25 mph, and the journey time Basingstoke to Alton was reduced from 54 minutes to 44 minutes. [18]

In 1908 a former Boer War army hospital near Alton was reopened as a children's tuberculosis hospital, and a siding connection was installed, for coal and other supplies needed by the building. Wagons were winched over the steeply graded siding. A platform called Alton Park was opened near the hospital; it was available for visitors to the hospital only. [19] [20]

Wartime suspension and re-instatement later

During World War I there was a demand for railway track equipment to lay in occupied France, and requisition allocations were given by the War Office to the railway companies. To fulfil its obligation the LSWR decided to close the Basingstoke and Alton line at short notice and recover the track from there. The line was heavily loss making, and the selection was commercially driven. The line closed on 1 January 1917. [21] [13] [11]

In 1921 pressure began to develop locally for the line to be reopened. A Board Meeting in 1921 considered the financial prospects, and was informed that the line had actually cost £107,842 to build. In 1913 (the last full year before the war) receipts had been £1,232 and operational costs had been £5,400. [22]

The considerable pressure to reopen led to a hearing by a House of Lords Committee lasting three days in May 1923. The Grouping of the railways had just been implemented, following the Railways Act 1921. Many emotional arguments were put by those claiming that the Southern Railway, as successor to the LSWR, had an obligation to expend considerable sums to rebuild a heavily loss-making minor railway. Despite objective evidence, the Lords Committee called upon the Southern Railway to reconsider – effectively an instruction to reopen the line. [23]

The line reopened on 18 August 1924. The crossing loop at Herriard was not reinstated. There were three trains each way daily, except Sundays. [24] [13]

Despite record loadings on the first Basingstoke market day following this event, gross receipts for the first two weeks totalled only £94 against wage costs alone of £102. [8]

Bus competition, and filming

In 1927 a local bus operator started running a route between Alton and Basingstoke. Running through the centre of the villages served, the bus immediately attracted custom and the light carryings on the railway reduced correspondingly. [25]

In 1928 filming took place at Salter Hatch level crossing. Gainsborough Pictures were making a film about contrived train crashes, planned to harm railway business in support of a road bus operator. The Southern Railway co-operated with the filming, and provided an obsolete steam engine and six coaches, which were destroyed in the crash. A steam lorry loaded with five tons of ballast and a charge of explosive was on the level crossing, causing the collision. [26] The filming took place on 19 August 1928, and the debris was removed and the line was in normal service the following day. The film was called The Wrecker (1928), and some of the footage was used again in Seven Sinners (1936). [27]

Decline and closure

In 1932 the Southern Railway reconsidered the future of the branch service, as it was heavily loss-making. The decision was taken to close it, and the last passenger train operated on 10 September 1932, [11] with one passenger on board. Parts of the line remained in use for goods traffic, from Basingstoke to Bentworth and Lasham, and from Butts Junction to Treloar Hospital. The Lasham service was discontinued after the last train on 31 May 1936, and the Basingstoke stub was reduced to serve the Thornycroft private siding there. [28] [13]

Before all the track on the line had been recovered, Gainsborough Pictures once again negotiated use of the line for filming, this time for Oh, Mr Porter!, with Will Hay. A disguised Cliddesden railway station was used as the film's fictional Irish station of "Bugleskelly" and a simulated tunnel was constructed. Filming took place over several weeks from June 1937. [29]

The remaining line sections were finally closed in 1967, at which time the entire Basingstoke and Alton system was no more. [30] [20]

Topography

Gradients and curvature

The line climbed, mostly at 1 in 50, from Basingstoke to Herriard. From there it fell at 1 in 50 for a mile, and then at more moderate gradients nearly all the way to Butts Junction, approaching Alton. The line had a great extent of curved track; there was a series of sharp curves from Herriard to Butts Junction. [16]

Locations

Related Research Articles

<span class="mw-page-title-main">London and South Western Railway</span> British pre-grouping railway company

The London and South Western Railway was a railway company in England from 1838 to 1922. Originating as the London and Southampton Railway, its network extended to Dorchester and Weymouth, to Salisbury, Exeter and Plymouth, and to Padstow, Ilfracombe and Bude. It developed a network of routes in Hampshire, Surrey and Berkshire, including Portsmouth and Reading.

<span class="mw-page-title-main">Wessex Main Line</span>

The Wessex Main Line is the railway line from Bristol Temple Meads to Southampton Central. Diverging from this route is the Heart of Wessex Line from Westbury to Weymouth. The Wessex Main Line intersects the Reading to Taunton Line at Westbury and the West of England Main Line at Salisbury.

<span class="mw-page-title-main">West of England line</span> British railway line

The West of England line is a British railway line from Basingstoke, Hampshire, to Exeter St Davids in Devon, England. Passenger services run between London Waterloo station and Exeter; the line intersects with the Wessex Main Line at Salisbury. Despite its historic title, it is not today's principal route from London to the West of England: Exeter and everywhere further west are reached more quickly from London Paddington via the Reading–Taunton line.

<span class="mw-page-title-main">South West Main Line</span> British railway route linking London and Weymouth

The South West Main Line (SWML) is a 143-mile major railway line between Waterloo station in central London and Weymouth on the south coast of England. A predominantly passenger line, it serves many commuter areas including south western suburbs of London and the conurbations based on Southampton and Bournemouth. It runs through the counties of Surrey, Hampshire and Dorset. It forms the core of the network built by the London and South Western Railway, today mostly operated by South Western Railway. Network Rail refers to it as the South West Main Line.

<span class="mw-page-title-main">West Coastway line</span> Railway line in England

The West Coastway line is a railway line in England linking the conurbations of Brighton/Hove/Littlehampton and Southampton/Portsmouth, with 1.3 million people between them. It has short southward branches to Littlehampton and Bognor Regis, which offer direct services to and from London.

<span class="mw-page-title-main">Portsmouth Direct line</span> Railway line from London to Portsmouth, England

The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.

<span class="mw-page-title-main">Mid-Hants Railway</span> Mid Hants Railway in Hampshire, England

The Mid-Hants Railway(MHR) originated when local people promoted a railway line between Alton and a junction near Winchester, connected to the larger London and South Western Railway at each end. It was authorised as the Alton, Alresford and Winchester Railway in 1861, and changed its name to the Mid-Hants Railway in 1865. It was opened for traffic in 1865. It was a single track 18 miles long, and had some very steep gradients. It had been unable to raise much share capital and it was heavily indebted from the outset, incurring heavy interest outlays.

<span class="mw-page-title-main">Woking railway station</span> Railway station in Woking, England

Woking railway station is a major stop in Woking, England, on the South West Main Line used by many commuters. It is 24 miles 27 chains (39.2 km) down the line from London Waterloo. The station is managed by South Western Railway, who operate all trains serving it.

<span class="mw-page-title-main">Lasham</span> Human settlement in England

Lasham is a village and civil parish in the East Hampshire district of Hampshire, England. It is 3.4 miles (5.5 km) northwest of Alton and 1.2 miles (1.9 km) north of Bentworth, just off the A339 road. The parish covers an area of 1,797 acres (727 ha) and has an average elevation of 560 feet (170 m) above sea level. The nearest railway station is Alton, 3.5 miles (5.6 km) southeast of the village. Lasham formerly had its own railway station, Bentworth and Lasham, on the Basingstoke and Alton Light Railway until the line's closure in 1936. According to the 2011 census, the village had a population of 176.

<span class="mw-page-title-main">Cliddesden</span> Human settlement in England

Cliddesden is a village and a parish in Hampshire, England located 3 miles south of Basingstoke, close to the M3 motorway. In the 2001 census it had a population of 489, increasing to 497 at the 2011 Census. The land and housing are currently protected as it is within a Conservation Zone and has many areas of beauty and rolling countryside.

<span class="mw-page-title-main">Eastleigh–Fareham line</span>

The Eastleigh–Fareham line is the railway line from Eastleigh to Fareham in England. At Eastleigh, trains join the South West Main Line for onward travel to Basingstoke and London Waterloo. At Fareham trains join the West Coastway Line for onward travel to Portsmouth.

<span class="mw-page-title-main">Fareham railway station</span> Railway station in Hampshire, England

Fareham railway station is on the West Coastway Line situated about 0.62 miles (1 km) from the town of Fareham in Hampshire, England. It is 84 miles 21 chains (135.6 km) down the line from London Waterloo.

Bentworth and Lasham railway station in Hampshire, England was on the Basingstoke and Alton Light Railway between the villages of Bentworth to the south and Lasham to the north.

Butts Junction was a railway junction located in Alton in Hampshire, England. The junction was the location at which the Basingstoke and Alton Light Railway and the Meon Valley Railway diverged from the Mid-Hants Railway which runs from Alton to Winchester. The junction became operational in 1901.

The Meon Valley Railway was a cross-country railway in Hampshire, England, that ran for 22 miles between Alton and Fareham, closely following the course of the River Meon. At its northern (Alton) end, it joined with the Alton Line from London. It was conceived as an additional main line to the area around Gosport, and it was opened in 1903. It never fulfilled its planned potential, and remained a local line through sparsely populated agricultural areas, and it closed to passenger services in 1955; some local goods services continued until total closure in 1968.

The Sprat and Winkle Line was the common name of the Andover to Redbridge railway line which ran between Andover and Redbridge in Hampshire, England. In the Romsey area it joined, and then left, the Salisbury to Southampton line. It was built by the Andover and Redbridge Railway, which was incorporated in 1858. In 1863 the uncompleted railway was taken over by the London and South Western Railway (LSWR), which opened the line in 1865. The line had been conceived as part of a trunk route from Manchester to Southampton, but when the Midland and South Western Junction Railway opened, the anticipated long-distance traffic was disappointing.

This article describes the history and operation of the railway routes west of Salisbury built by the London and South Western Railway (LSWR) and allied companies, which ultimately became part of the Southern Railway in the United Kingdom. Salisbury forms a natural boundary between the Southern Railway core routes in the counties surrounding London, and the long route connecting with the Devon and Cornwall lines.

The Gosport and Cosham lines were a collection of railway lines in southern Hampshire. Most of the lines are now closed but some elements are still in use, forming part of the West Coastway line. The lines originally linked to the main London to Southampton line via the Eastleigh–Fareham line and subsequently with a line from Southampton via Bursledon, both of which are still in use.

The Eastleigh to Salisbury line is the railway line from Eastleigh through Romsey to Salisbury in Hampshire, England. It was constructed by the London and South Western Railway in 1857 from Bishopstoke; the station changed its name to Eastleigh in 1889. At Salisbury the line ran to Milford station on the south-eastern margin of the city, but in 1859 and extension to the present-day Salisbury station was built, and the lines from Andover through Salisbury to Yeovil were connected.

The Aldershot and Alton lines of the LSWR were railways developed from 1849 onwards in the region in Surrey and Hampshire, England, between the Southampton main line and Guildford. First was a line from Guildford to Farnham, soon extended to Alton in 1852. The Reading, Guildford and Reigate Railway, an affiliate of the South Eastern Railway (SER), used part of that line by running powers. When the Aldershot Garrison and associated camps opened, suddenly Aldershot had a large population, both civilian and military, and the LSWR built a line from Pirbright Junction, on the Southampton main line. As well as serving Aldershot, this line gave a more direct route from London. It opened in 1870.

References

  1. 1 2 3 Dean, Martin; Robertson, Kevin; Simmonds, Roger (2003). The Basingstoke & Alton Light Railway. Southampton: Barton. ISBN   0-9545617-0-8. OCLC   53030800. page 1
  2. Dean etc, page 3
  3. 1 2 3 Dean, etc, pages 6 and 7
  4. Burton, Anthony; Scott-Morgan, John (2015). The light railways of Britain and Ireland. Barnsley. ISBN   978-1-4738-5994-4. OCLC   922640342.{{cite book}}: CS1 maint: location missing publisher (link) page 15
  5. Robertson, Kevin; Oppitz, Leslie (1988). Hampshire railways remembered. Newbury: Countryside. ISBN   1-85306-020-8. OCLC   19064667., page 20
  6. Mitchell, Vic; Smith, Keith (1984). Branch lines to Alton. Midhurst: Middleton Press. ISBN   0-906520-11-8. OCLC   43199331., Historical Background
  7. Arthur Kelly, The Basingstoke and Alton Light Railway, in the Railway Magazine, October 1900, pages 326 to 332
  8. 1 2 3 4 Maggs, Colin Gordon (2010). The branch lines of Hampshire. Stroud: Amberley. ISBN   978-1-84868-343-3. OCLC   499090572., pages 91 and 96
  9. Dean etc, pages 9 and 10
  10. Dean etc, pages 12, 14 and 18
  11. 1 2 3 Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, page 487 and 488
  12. Dean, etc, pages 18 and 19
  13. 1 2 3 4 Grant, Donald J. (2017). Directory of the railway companies of Great Britain. Kibworth Beauchamp, Leicestershire. ISBN   978-1-78589-353-7. OCLC   946006746.{{cite book}}: CS1 maint: location missing publisher (link), pages 33 and 34
  14. Hampshire Herald & Alton Gazette, 8 June 1901, quoted in Maggs, page 91
  15. Dean etc, pages 39 and 43
  16. 1 2 Dean etc, pages 30 and 31
  17. Dean etc, page 45
  18. Dean etc, page 46
  19. Dean, page 49
  20. 1 2 Mitchell and Smith, caption to plate 18
  21. Dean etc, page 52
  22. Dean etc, page 55
  23. Dean etc, pages 56 to 58
  24. Dean, page 63
  25. Dean tec, page 67
  26. Vic Mitchell and Keith Smith, caption to plate 12
  27. Dean, etc, pages 68, 69 and 73
  28. Dean etc, pages 74 to 76
  29. Dean, etc, page 77
  30. Dean etc page 81
  31. Croughton, Godfrey; Kidner, R. W.; Young, Alan; Transport Ticket Society (1982). Private and untimetabled railway stations : halts and stopping places. Trowbridge, Wilts.: Oakwood Press. ISBN   0-85361-281-1. OCLC   10507501.
  32. M E Quick, Railway Passenger Stations in England, Wales and Scotland: A Chronology, version 5.04, September 2022, Railway and Canal Historical Society, electronic download

51°16′8.88″N1°5′16.66″W / 51.2691333°N 1.0879611°W / 51.2691333; -1.0879611