Chemistry and Metallurgy Research Replacement Facility

Last updated
Preliminary designs (2006) CMRR preliminary.jpg
Preliminary designs (2006)

The Chemistry and Metallurgy Research Replacement Facility, usually referred to as the CMRR, is a facility under construction at Los Alamos National Laboratory in New Mexico which is part of the United States' nuclear stockpile stewardship program. The facility will replace the aging Chemistry and Metallurgy Research (CMR) facility. It is located in Technical Area 55 (TA-55) and consists of two buildings: the Nuclear Facility (CMRR-NF) and the Radiological Laboratory, Utility, and Office Building (RLUOB). The two buildings will be linked by tunnels and will connect to LANL's existing 30-year-old plutonium facility PF-4. [1] The facility is controversial both because of spiraling costs and because critics argue it will allow for expanded production of plutonium 'pits' and therefore could be used to manufacture new nuclear weapons.

Contents

Background

The CMR c. 1952 LANL CMR.jpg
The CMR c. 1952

Construction of the Chemistry and Metallurgy Research (CMR) building began in 1949 and was completed in 1952. [2] The building contained six wings and in 1959 a seventh laboratory wing was added. In 1960, Los Alamos built Wing 9, a 64,000-square-foot (5,900 m2) addition containing hot cells with remote handling capabilities. In total, the CMR building now contains roughly 550,000 square feet (51,000 m2) of laboratories and related facilities.

According to Los Alamos officials, "many of the CMR facility systems and structural components are aged, outmoded, eroding, and generally deteriorating." In 1999, the NNSA decided to plan for the "end-of-life" of the CMR building around 2010. [2] [3] Thereafter planning began for the CMRR facility which would serve as a replacement. There is evidence the need for an upgrade is real, since in 2010 federal safety auditors reported the building was "seismically fragile and poses a continuing risk to workers and the public." [4]

Ground was broken on the CMRR project on January 12, 2006. [5] Construction of the CMRR is proceeding in three phases. The first phase is the construction of the Radiological Laboratory Utility Office Building, which is expected to be finished around 2011. [5] It has an estimated cost of $164 million and will house "a radiological laboratory, a training center, two simulation labs, and cleared and uncleared office space for some 350 Lab personnel". [6] The second phase is the Special Equipment Facility (SPF) and the third phase is the Nuclear Facility (NF). [7]

The initial cost of the CMRR project was approved at $745–$975 Million. The total projected cost in 2008 was reported at $2 billion. [6] In 2010, the total cost of the project was still not finalized but was estimated between $4 and $5 Billion. [8] [9] There is a $4 billion placeholder in the Obama administration's Fiscal Year 2011 budget for the CMRR. [10] In 2010, a top lab manager suggested that the final price tag probably will not be known until 2014. [10] The expected completion date is also unknown but it has been reported the project may not be completed until 2022. [11]

CMRR-NF

The Nuclear Facility portion was expected to be completed around 2014 but has been delayed. It is a very complex building, featuring NNSA Security Category 1 laboratory space and a total of approximately 306 enclosures, 26 fume hoods and 43 sections of Material Transfer System (MTS). [12] The Nuclear Facility will contain a 6-metric ton vault that will approximately triple LANL's plutonium storage capacity. [1] There have been several difficulties in design including earthquake concerns and fail-safe issues regarding plutonium vault design. [1] In particular, security worries called for the facility to be largely underground, but this led to increased seismic worries, which pushed the excavation requirements from 50 feet (15 m) to 125 feet (38 m) and increased the amount of concrete in the foundation to 225,000 cubic yards. [8]

Controversy

Critics argue that the CMRR project is a violation, or has the potential to be a violation, of the Nuclear Non-Proliferation Treaty between the US, China, Russia, Britain and France. [1] Critics also argue that the new facility is unnecessary for maintaining the nuclear stockpile and may be seen as a threatening development because it allows for the production of new types of nuclear weapons. [9] Critics also cite the spiraling costs (mentioned earlier) as a major problem. Greg Mello, the director of the Los Alamos Study Group (LASG), "The dramatic cost escalation at CMRR-NF together with the problem of bringing other facilities into compliance with seismic safety requirements has unquantified cost implications and unknown feasibility." The original cost of the CMRR-NF was estimated at $400 million in 2003 and has grown to a current estimate of $3.7 - $5.8 billion.

Detractors also argue against the un-justified capabilities to produce new plutonium pits, which constitute the core and active component of nuclear weapons. [13] LANL currently has the capacity to produce 10 to 20 pits a year, but this is expected to come to an end with the shut down of the CMR in 2010. The CMRR will expand this capability, but it is not known by how much. An Institute for Defense Analyses report written before 2008 estimated a “future pit production requirement of 125 per year, with a surge capability of 200." [11] The need for pit production is a complex issue, with the government and the military arguing that refurbishment and replacement capabilities are needed. The aging time of pits before refurbishment is needed is still being studied but some believe it is likely around 100 years or more. [14] The U.S. has about 23,000 pits, of which about 10,000 are in weapons and roughly 15,000 are in storage at the Pantex Plant near Amarillo, Texas. [14]

Several protests were held, including a 10-day summer camp in August 2010 called "Disarmament Summer Encampment" held in Los Alamos and organized by the nuclear abolition group Think Outside the Bomb. [15] A non-violent civil disobedience style protest on August 6, 2010 resulted in eight arrests. [16]

On August 16, 2010, the Los Alamos Study Group filed a lawsuit against the Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) which states that the original environmental impact statement (EIS) completed in 2003, with a record of decision (ROD) in 2004, is not a legitimate EIS for the current design and is a direct violation of the NEPA. The lawsuit states that the current CMRR-NF project needs to be halted until a new EIS is studied, accessing the need for this facility and its purpose and studying thoroughly all alternatives, including other locations, upgrading existing facilities, or canceling the project all together. [4] [17] NNSA decided to complete a new "Supplemental Environmental Impact Statement" on the project, but LASG refused to drop the suit. Judge Judith Herrera dismissed the lawsuit on May 23, 2011, saying the case was “prudentially moot” and “not yet ripe”. [18] NNSA officials—without any public review—revamped the design of the CMRR-NF, using what they describe as a multi-functional “hotel concept” that can be used in the future for a range of unspecified nuclear weapons activities. LANL officials were considering using the 400,000 cubic yards of excavated volcanic ash from construction to cap two old waste disposal sites that contain 14 million cubic feet of nuclear and chemical residues. [4] The lawsuit claimed this was a violation of the National Environmental Policy Act and noted "The decision to leave 14 million cubic feet of nuclear and chemical waste in shallow unlined disposal pits covered by this material would be a major federal action significantly affecting the quality of the human environment, with far-reaching impacts." [17]

Related Research Articles

<span class="mw-page-title-main">Manhattan Project</span> World War II Allied R&D program that produced the first nuclear weapons

The Manhattan Project was a program of research and development undertaken during World War II to produce the first nuclear weapons. It was led by the United States in collaboration with the United Kingdom and Canada. From 1942 to 1946, the project was under the direction of Major General Leslie Groves of the U.S. Army Corps of Engineers. Nuclear physicist J. Robert Oppenheimer was the director of the Los Alamos Laboratory that designed the bombs. The Army program was designated the Manhattan District, as its first headquarters were in Manhattan; the name gradually superseded the official codename, Development of Substitute Materials, for the entire project. The project absorbed its earlier British counterpart, Tube Alloys. The Manhattan Project employed nearly 130,000 people at its peak and cost nearly US$2 billion, over 80 percent of which was for building and operating the plants that produced the fissile material. Research and production took place at more than 30 sites across the US, the UK, and Canada.

<span class="mw-page-title-main">Los Alamos National Laboratory</span> Laboratory near Santa Fe, New Mexico

Los Alamos National Laboratory is one of the sixteen research and development laboratories of the United States Department of Energy (DOE), located a short distance northwest of Santa Fe, New Mexico, in the American southwest. Best known for its central role in helping develop the first atomic bomb, LANL is one of the world's largest and most advanced scientific institutions.

Lawrence Livermore National Laboratory (LLNL) is a federally funded research and development center in Livermore, California, United States. Originally established in 1952, the laboratory now is sponsored by the United States Department of Energy and administered privately by Lawrence Livermore National Security, LLC.

The LANL Research Library is a research library at Los Alamos National Laboratory. It contains a substantial collection of books, journals, databases, patents along with technical reports. Additionally it offers literature searching, training, and outreach services. The library has a research and development (R&D) component, which works in areas such as open archives, recommendation systems, emergency response information systems, and discovery systems. Its stated mission is to deliver effective and responsive knowledge services, thereby connecting people with information, technology, and resources. Its stated purpose (vision) is essential knowledge services for national security sciences.

<span class="mw-page-title-main">Stockpile stewardship</span>

Stockpile stewardship refers to the United States program of reliability testing and maintenance of its nuclear weapons without the use of nuclear testing.

<span class="mw-page-title-main">Metallurgical Laboratory</span> Former laboratory at the University of Chicago, part of the Manhattan Project

The Metallurgical Laboratory was a scientific laboratory at the University of Chicago that was established in February 1942 to study and use the newly discovered chemical element plutonium. It researched plutonium's chemistry and metallurgy, designed the world's first nuclear reactors to produce it, and developed chemical processes to separate it from other elements. In August 1942 the lab's chemical section was the first to chemically separate a weighable sample of plutonium, and on 2 December 1942, the Met Lab produced the first controlled nuclear chain reaction, in the reactor Chicago Pile-1, which was constructed under the stands of the university's old football stadium, Stagg Field.

<span class="mw-page-title-main">Plutonium-238</span> Isotope of plutonium used in radioisotope thermoelectric generators

Plutonium-238 is a radioactive isotope of plutonium that has a half-life of 87.7 years.

<span class="mw-page-title-main">X-10 Graphite Reactor</span> Decommissioned nuclear reactor in Tennessee

The X-10 Graphite Reactor is a decommissioned nuclear reactor at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Formerly known as the Clinton Pile and X-10 Pile, it was the world's second artificial nuclear reactor, and the first designed and built for continuous operation. It was built during World War II as part of the Manhattan Project.

Los Alamos National Security, LLC was a private limited liability company (LLC) formed by the University of California, Bechtel, BWX Technologies, and URS Energy and Construction. From its creation until November 1, 2018, it operated Los Alamos National Laboratory (LANL) for the Department of Energy and the National Nuclear Security Administration. It took over direct management and operation of the Los Alamos National Laboratory from the University of California on June 1, 2006. It was based in Los Alamos, New Mexico. Operation of Los Alamos National Laboratory are now overseen by Triad National Security.

The Reliable Replacement Warhead (RRW) was a proposed new American nuclear warhead design and bomb family that was intended to be simple, reliable and to provide a long-lasting, low-maintenance future nuclear force for the United States. Initiated by the United States Congress in 2004, it became a centerpiece of the plans of the National Nuclear Security Administration (NNSA) to remake the nuclear weapons complex.

<span class="mw-page-title-main">W89</span>

The W89 was an American thermonuclear warhead design intended for use on the AGM-131 SRAM II air to ground nuclear missile and the UUM-125 Sea Lance anti-submarine missile.

<span class="mw-page-title-main">Siegfried S. Hecker</span> American metallurgist and nuclear scientist

Siegfried S. Hecker is an American metallurgist and nuclear scientist. He served as Director of the Los Alamos National Laboratory from 1986 to 1997 and is now affiliated with Stanford University, where he is research professor emeritus in the Department of Management Science and Engineering in the School of Engineering, and senior fellow emeritus at the Freeman Spogli Institute for International Studies. During this time, he was also elected a member of the National Academy of Engineering (1988) for outstanding research on plutonium and the forming of materials, and for leadership in developing energy and weapons systems.

The Dual-Axis Radiographic Hydrodynamic Test Facility (DARHT) is a facility at Los Alamos National Laboratory which is part of the Department of Energy's stockpile stewardship program. It uses two large X-ray machines to record three-dimensional interior images of materials. In most experiments, materials undergo hydrodynamic shock to simulate the implosion process in nuclear bombs and/or the effects of severe hydrodynamic stress. The tests are described as "full-scale mockups of the events that trigger the nuclear detonation". The powerful pulsed X-ray beams allow for an ultra-fast motion picture to be constructed showing the details of the process being studied in three dimensions. The tests are compared with computer simulations to help improve the accuracy of the computer codes. Such testing falls under the category of sub-critical testing.

<span class="mw-page-title-main">Plutonium</span> Chemical element, symbol Pu and atomic number 94

Plutonium is a chemical element; it has symbol Pu and atomic number 94. It is an actinide metal of silvery-gray appearance that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibits six allotropes and four oxidation states. It reacts with carbon, halogens, nitrogen, silicon, and hydrogen. When exposed to moist air, it forms oxides and hydrides that can expand the sample up to 70% in volume, which in turn flake off as a powder that is pyrophoric. It is radioactive and can accumulate in bones, which makes the handling of plutonium dangerous.

<span class="mw-page-title-main">Linton Brooks</span>

Linton Forrestall Brooks is an American government official who served as the Under Secretary of Energy for Nuclear Security from 2002 to 2007.

Fogbank is a code name given to a secret material used in the W76, W78 and W88 nuclear warheads that are part of the United States nuclear arsenal. The process to create Fogbank was lost by 2000, when it was needed for the refurbishment of old warheads. Fogbank was then reverse engineered by the National Nuclear Security Administration (NNSA) over five years and at the cost of tens of millions of dollars.

<span class="mw-page-title-main">Pit (nuclear weapon)</span> Core of a nuclear implosion weapon

In nuclear weapon design, the pit is the core of an implosion nuclear weapon, consisting of fissile material and any neutron reflector or tamper bonded to it. Some weapons tested during the 1950s used pits made with uranium-235 alone, or as a composite with plutonium. All-plutonium pits are the smallest in diameter and have been the standard since the early 1960s. The pit is named after the hard core found in stonefruit such as peaches and apricots.

<span class="mw-page-title-main">Charles F. McMillan</span> American physicist

Charles F. McMillan is an American nuclear physicist and served as the 10th director of the Los Alamos National Laboratory. His appointment was effective June 1, 2011. He succeeded Michael R. Anastasio. On September 5, 2017, McMillan announced he would be leaving the director position at the end of the year.

<span class="mw-page-title-main">Project Y</span> Secret laboratory established by the Manhattan Project

The Los Alamos Laboratory, also known as Project Y, was a secret laboratory established by the Manhattan Project and operated by the University of California during World War II. Its mission was to design and build the first atomic bombs. Robert Oppenheimer was its first director, serving from 1943 to December 1945, when he was succeeded by Norris Bradbury. In order to enable scientists to freely discuss their work while preserving security, the laboratory was located on the isolated Pajarito Plateau in Northern New Mexico. The wartime laboratory occupied buildings that had once been part of the Los Alamos Ranch School.

Dana Dattelbaum is an American physicist and scientist at Los Alamos National Laboratory. She leads NNSA’s Dynamic Materials Properties portfolio at LANL, which provides experimental data, platforms and diagnostics for materials behaviors relevant to nuclear weapons performance, ranging from plutonium to high explosives.

References

  1. 1 2 3 4 Mello, Greg (20 March 2008). "The U.S. nuclear weapons complex: Pushing for a new production capability". Bulletin of the Atomic Scientists . Retrieved 25 September 2010.
  2. 1 2 "Historical Overview". LANL. Archived from the original on May 27, 2010. Retrieved 25 September 2010.
  3. "CMRR Project Schedule". LANL. Archived from the original on May 27, 2010. Retrieved 25 September 2010.
  4. 1 2 3 Fleck, John (September 23, 2010). "New Study of LANL Project Proposed". Albuquerque Journal. Retrieved 25 September 2010.
  5. 1 2 "Laboratory breaks ground on new CMRR building". LANL News Bulletin. January 13, 2006. Retrieved 7 July 2010.
  6. 1 2 "Builders Place Final Beam in First Phase of CMRR Project". LANL Press Release. July 22, 2008. Retrieved 25 September 2010.
  7. "04-D-125, Chemistry and Metallurgy Research Building Replacement (CMRR) Project, Los Alamos National Laboratory (LANL), Los Alamos, New Mexico Project Data Sheet (PDS) is for Construction" (PDF). LANL. 27 April 2011. Retrieved 8 May 2024.
  8. 1 2 Snodgrass, Roger (18 August 2010). "Group files suit to halt LANL nuke facility". The New Mexican. Retrieved 25 September 2010.
  9. 1 2 Malten, Willem (April 17, 2010). "Los Alamos Lab's CMRR-NF project would send wrong message to world". The New Mexican. Archived from the original on February 1, 2013. Retrieved 25 September 2010.
  10. 1 2 Fleck, John (June 29, 2010). "Congress Chafes Over Nuke Costs". Albuquerque Journal. Retrieved 25 September 2010.
  11. 1 2 Pein, Corey (August 21, 2010). "It's the Pits: Los Alamos wants to spend billions for new nuke triggers". Santa Fe Reporter. Retrieved 25 September 2010.
  12. "CMRR Project: Nuclear Facility (NF)". LANL. Archived from the original on May 27, 2010. Retrieved 25 September 2010.
  13. "Restarting plutonium pit production: no need, high costs (talking points)". LASG. Retrieved 25 September 2010.
  14. 1 2 "Plutonium Pit Production — LANL's Pivotal New Mission" . Retrieved 25 September 2010.
  15. Parker, Phil (August 2, 2010). "Protest Planned for Los Alamos". Albuquerque Journal. Archived from the original on 2011-07-22. Retrieved 25 September 2010. See also February 28, 2010 CMRR protest pictures here
  16. "LANL 8 Head to Court in Los Alamos, New Mexico Today". Think Outside the Bomb Press Release. August 9, 2010. Retrieved 25 September 2010.
  17. 1 2 Lobsenz, George (August 18, 2010). "Greens Sue To Stop New Plutonium Plant At Los Alamos Lab". Defense Daily. Retrieved 25 September 2010.
  18. July 1, 2011.Study Group Resumes Litigation againstProposed $6 Billion LANL Plutonium Facility