Clashindarroch Forest is possibly the largest forest in Aberdeenshire, situated to the south-west of the market town of Huntly. Managed by Forest Enterprise. [1] It is the location of a series of Nordic Skiing trails managed by the Nordic Ski Centre. [2] [3]

The forest is home to a small Scottish wildcat population, a species considered to be at the verge of extinction. [4] [5]

In 2006, a proposal was made to construct a 47 turbine windfarm in the forest which was the subject of a public inquiry in May 2006. Construction of the 18 Senvion MM82 turbine 36.9MW Clashindarroch Wind Farm phase 1 project was completed in 2015. [6] In 2020 Vattenfall sought planning permission for a 77MW phase 2 development of 14 turbines. [7]

Related Research Articles

Vattenfall Swedish multinational power company owned by the Government of Sweden

Vattenfall is a Swedish multinational power company owned by the Swedish State. Beyond Sweden, the company generates power in Denmark, Finland, Germany, the Netherlands, and the United Kingdom.

Horns Rev

Horns Rev is a shallow sandy reef of glacial deposits in the eastern North Sea, about 15 km (9.3 mi) off the westernmost point of Denmark, Blåvands Huk. The reef contains the Horns Rev Offshore Wind Farm.

Balmedie Human settlement in Scotland

Balmedie is a large village in Aberdeenshire in Scotland. It lies north of the city of Aberdeen, in the civil parish of Belhelvie. The long and wide beach is bordered by an extensive dune system that stretches 14 miles (23 km) from Aberdeen to just north of the Ythan Estuary at Newburgh. The dynamic dunes has marram grass as the principal vegetation. They support a large array of wildlife. Two watercourses make their way to the sea within the area creating ribbons of wetland vegetation along their course. The village is near the Sands of Forvie Site of Special Scientific Interest, the fifth largest sand dune system in Britain; this is an integral part of the Ythan Estuary, which separates the sands from Balmedie beach.

Wind power in the United Kingdom Wind power in the United Kingdom

The United Kingdom is one of the best locations for wind power in the world and is considered to be the best in Europe. By the beginning of March 2022, the UK had 11,091 wind turbines with a total installed capacity of over 24.6 gigawatts (GW): 14.1 GW of onshore capacity and 10.4 GW of offshore capacity, the sixth largest capacity of any country in 2019. Wind power contributed 24.8% of UK electricity supplied in 2020, having surpassed coal in 2016 and nuclear in 2018. It is the largest source of renewable electricity in the UK. The UK Government has committed to a major expansion of offshore capacity by 2030.

The Thanet Wind Farm is an offshore wind farm 7 miles (11 km) off the coast of Thanet district in Kent, England. On commissioning it was the world's largest offshore wind farm. It has a nameplate capacity of 300 MW and it cost £780–900 million (US$1.2–1.4 billion). Thanet is one of fifteen Round 2 wind projects announced by the Crown Estate in January 2004 but the first to be developed. It was officially opened on 23 September 2010, when it overtook Horns Rev 2 as the biggest offshore wind farm in the world. It has since been overtaken by many others.

Wind power in Denmark Overview of wind power in Denmark

Denmark was a pioneer in developing commercial wind power during the 1970s, and today a substantial share of the wind turbines around the world are produced by Danish manufacturers such as Vestas—the world's largest wind-turbine manufacturer—along with many component suppliers. In Denmark's electricity sector wind power produced the equivalent of 47% of Denmark's total electricity consumption in 2019, an increase from 43.4% in 2017, 39% in 2014, and 33% in 2013. In 2012, the Danish government adopted a plan to increase the share of electricity production from wind to 50% by 2020, and to 84% by 2035. Denmark had the 4th best energy architecture performance in the world in 2017 according to the World Economic Forum, and the second best energy security in the world in 2019 according to the World Energy Council.

Wind power in Scotland Overview of wind power in Scotland

Wind power in Scotland is the fastest-growing renewable energy technology, with 9,347 MW of installed wind power capacity as of June 2020. This included 8,366 MW from onshore wind in Scotland and 981 MW of offshore wind generators.

Whitelee Wind Farm

Whitelee Wind Farm is a windfarm on the Eaglesham moor in Scotland. The main visitor centre is located in East Renfrewshire, but the majority of turbines are located in East Ayrshire and South Lanarkshire. It is the largest on-shore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 megawatts (MW), with the average of 2.5 MW per turbine. Whitelee was developed and is operated by ScottishPower Renewables, which is part of the Spanish company Iberdrola.

Kentish Flats Offshore Wind Farm

The Kentish Flats Offshore Wind Farm is a wind farm located off the coast of Kent, England on a large, flat and shallow plateau just outside the main Thames shipping lanes. The wind farm is operated by Vattenfall.

As of October 2020, wind power in the Netherlands has an installed capacity of 4,990 MW, 19% of which is based offshore. In 2019, the wind turbines provided the country with 12% of its electricity demand during the year, a figure that is growing but somewhat below the average of 15% that wind power provides across the whole of the EU's electricity consumption. The Dutch are trying to meet the EU-set target of producing 14% of total energy use from renewable sources by 2020, and 16% by 2023. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

Ormonde Wind Farm Wind farm in the Irish Sea

The Ormonde Wind Farm is a wind farm west of Barrow-in-Furness in the Irish Sea. The wind farm covers an area of 8.7 square kilometres (3.4 sq mi). It has a total capacity of 150 MW and is expected to produce around 500 GWh of electricity per year.

Crystal Rig Wind Farm

Crystal Rig Wind Farm is an operational onshore wind farm located on the Lammermuir Hills in the Scottish Borders region of Scotland. When phase 1 was completed in May 2004 it was the largest wind farm in Scotland. As a result of 3 extensions it is currently the 2nd largest wind farm in the UK, in terms of nameplate capacity and one of the top five largest in number of turbines.

The Aegir wave farm was a planned wave farm off the south west of Shetland. The project was developed by Aegir Wave Power, a 2009 formed joint venture of Vattenfall and the wave power technology developer Pelamis Wave Power. The wave farm would have had capacity from 10 MW potentially up to 100 MW. Following the collapse of Pelamis in November 2014, the project was cancelled by Vattenfall in February 2015.

Viking Wind Farm is a wind farm under construction which is being developed by Viking Energy, a partnership between Shetland Islands Council and SSE plc.

The European Offshore Wind Deployment Centre (EOWDC), also known as the Aberdeen Bay Wind Farm is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium. The scheme is relatively small - it consists of 11 wind turbines with an installed capacity of 93.2 megawatts. It is located between Blackdog and Bridge of Don near Aberdeen. First power was generated in July 2018, with full commissioning following in September 2018.

East Anglia Array

The East Anglia Array is a proposed series of offshore wind farms located around 30 miles off the east coast of East Anglia, in the North Sea, England. Starting with East Anglia ONE it is being developed in partnership by ScottishPower Renewables and Vattenfall. Up to six individual projects could be set up in the area with a maximum capacity of up to 7.2 GW. The first project, East Anglia ONE at 714 MW, received planning consent in June 2014 and contracts in April 2016. Offshore construction began in 2018 and the project was commissioned in July 2020. It is expected to cost £2.5 billion.

<i>Trump International Golf Club Scotland Ltd v The Scottish Ministers</i>

Trump International Golf Club Scotland Ltd v Scotland [2015] UKSC 74 is a 2015 judgment of the Supreme Court of the United Kingdom on the authority of the Scottish government to allow windfarm applications, under the Electricity Act 1989. It is relevant for UK enterprise law and the regulation of UK wind power.

Kriegers Flak is a 600 MW offshore wind farm under construction in the Baltic Sea on the Danish part of the reef of the same name. It will form part of a new 400 MW interconnector between Denmark and Germany.

Horns Rev Offshore Wind Farm

Horns Rev is an offshore wind farm in Danish waters in the North Sea.

References

  1. "Clashindarroch Forest". VisitScotland. Retrieved 11 October 2020.
  2. "Clashindarroch". Forestry and Land Scotland. Retrieved 11 October 2020.
  3. "Clashindarroch Forest Trails". Huntly Nordic and Outdoor Centre. Retrieved 12 October 2020.
  4. "Fears over tree felling threat to wildcats in Clashindarroch Forest". BBC News. 14 May 2018. Retrieved 12 October 2020.
  5. Campbell, Roo (18 May 2018). "The work we are doing at Clashindarroch Forest - the facts". Scottish Wildcat Action. Retrieved 12 October 2020.
  6. "Clashindarroch Wind Farm, Aberdeenshire, Scotland". PowerTechnology. 2015. Retrieved 11 October 2020.
  7. "Clashindarroch II Wind Farm Proposal". Vattenfall. January 2020. Retrieved 11 October 2020.

Coordinates: 57°19′25″N2°57′23″W / 57.32361°N 2.95647°W / 57.32361; -2.95647