Contracts for Difference (UK electricity market support)

Last updated

Contracts for Difference (CfD) are the main market support mechanism for low carbon generation in the UK. The scheme replaced the Renewables Obligation which closed to new generation in March 2017. It is administered by the Low Carbon Contracts Company (LCCC), which is owned by the UK Government.

Contents

The scheme offers a fixed "Strike Price" to generators over a 15-year contract, which provides financial certainty, unlike the wholesale electricity market which can fluctuate significantly. With the contract for difference, if the market price for electricity drops below the Strike Price, LCCC pays the generator the shortfall, however if the market price rises, the generator must pay back the difference. The costs of the scheme are passed onto consumers via their electricity bills. [1]

The contracts are awarded using a reverse auction in annual "Allocation Rounds" (AR) where companies submit sealed bids for a project capacity and cost. Contracts are awarded to the lowest cost projects first, until a predefined budget or capacity cap is reached. The budget is split into different 'Pots' which different technologies can bid into, [2] although these have varied by auction.

Bids cannot be above a maximum "Administrative Strike Price" set before the auction. [3] To make comparison between years easier, all Strike Prices are quoted in 2012 prices, but projects are paid an inflation-adjusted amount linked to the Consumer Price Index (CPI). The projects also set out a delivery year, when the projects is expected to be commissioned, however this may slip for various reasons. [1]

History

In December 2010, the Government introduced plans to reform the electricity market. [4] The Electricity Market Reform (EMR) introduced both a capacity market to incentivise reliable generation and Contracts for Difference to provide revenue certainty to developers investing in low carbon and renewable energy, but at a lower cost that the Renewables Obligation. [5]

Prior to the first Allocation Round, there was a mechanism called Final Investment Decision Enabling for Renewables. [6] This awarded CfDs to five offshore wind projects, two biomass conversion projects, and one dedicated biomass with combined heat and power, with a total capacity of almost 4.5 GW. [6] [7]

Separately, the Government also awarded a CfD to Hinkley Point C nuclear power station, set at £92.50/MWh for a 35 year period. [8] This is 20 years longer than other CfD contracts. See §Cost to consumers of the Hinkley Point C article for further discussion on the costs.

Results of the first two auctions were announced in February 2015 and September 2017. Since AR3 in 2019, subsequent auctions have been on an annual basis, .

Allocation Rounds

AR1

The first Allocation Round auction started in October 2014, with results announced on 19 February 2015. [9] The maximum prices are given in the first table below. A total of 2.1 GW of contracts were awarded, primarily for two offshore wind projects, the 714 MW East Anglia 1 and the 448 MW Neart Na Gaoithe, plus 15 smaller onshore wind projects. [10]

Administrative Strike Prices for AR1 by technology and delivery year (£2012/MWh) [5]
PotTechnology2014/152015/162016/172017/182018/19
Pot 1

(established)

Onshore Wind (>5 MW)9595959090
Solar photovoltaic (>5 MW)120120115110100
Energy from Waste (with CHP)8080808080
Hydro (>5 MW and <50 MW)100100100100100
Landfill gas5555555555
Sewage gas7575757575
Pot 2 (less

established)

Offshore wind1551551560140140
Tidal stream305305305305305
Wave305305305305305
Advanced Conversion Technologies (with or without CHP)155155150140140
Anaerobic digestion (with or without CHP) (>5 MW)150150150140140
Dedicated biomass (with CHP)125125125125125
Geothermal (with or without CHP)145145145140140
Pot 3Biomass conversion105105105105105
Results for AR1 by technology and delivery year [5]
Capacity (MW)Strike Price (£2012/MWh)
PotTechnology2015/162016/172017/182018/192015/162016/172017/182018/19
Pot 1

(established)

Onshore Wind (>5 MW)4577.5626.0579.2379.9982.50
Solar photovoltaic (>5 MW)32.8838.6750.0079.23
Energy from Waste (with CHP)94.7580.00
Pot 2 (less

established)

Offshore wind714448119.89114.39
Advanced Conversion Technologies3626119.89114.39

AR2

The second round ran from April to September 2017. [11] As announced in the 2016 budget, no funding was allocated in Pot 1 for the more established technologies of onshore wind, solar PV, hydro, energy from waste with CHP, landfill gas, and sewage gas. Instead, a Pot 2 budget of £290m for less established technologies, of which offshore wind was expected to form the majority. [12] Nearly 3.2 GW of contracts were awarded for three offshore wind farms: Triton Knoll (860 MW), Hornsea Project 2 (1386 MW), and Moray Offshore Windfarm (East) (950 MW). Several smaller projects for advanced conversion technologies and dedicated biomass with CHP were also funded. [13]

Parameters and results for AR2 by technology and delivery year [13] [14]
PotTechnologyASP2012/MWh)Capacity (MW)SP2012/MWh)
2021/222022/232021/222022/232021/222022/23
Pot 2 (less

established)

Offshore wind105100860233674.7557.50
ACT (standard or advanced; with or without CHP)12511556.31874.7540.00
Anaerobic digestion (with or without CHP; >5MW)140135
Dedicated biomass (with CHP)11511585.6474.75
Wave310300
Tidal stream300295

AR3

The auction process for AR3 took place between May and September 2021. Of the £265m annual budget, £200m was for offshore wind, £24m for floating offshore wind, and £10m for onshore wind, with the remaining £31m for other less established technologies including (onshore) remote island wind. [15] AR3 delivered record low prices for offshore wind, with contracts to deliver in 2023/24 came in at £39.650/MWh and those delivering in 2024/25 at £41.611/MWh. [16]

Parameters and results for AR3 by technology and delivery year [17] [18]
PotTechnologyASP2012/MWh)Capacity (MW)SP2012/MWh)
2023/242024/252023/242024/252023/242024/25
Pot 2 (less

established)

Advanced Conversion Technologies11311127.56.139.6541.611
Anaerobic digestion (>5 MW)122121
Dedicated biomass with CHP121121
Geothermal129127
Offshore wind56531212285439.6541.611
Remote island wind (>5 MW)8282225.7249.539.6541.611
Tidal stream225217
Wave281268

AR4

The auction for AR4 took place between December 2021 and July 2022, and re-introduced Pot 1 for established technologies. Of the total £285m budget, a £20m ringfence was set aside for tidal stream projects in Pot 2, [19] and for the first time four contracts totalling just over 40 MW were awarded CfDs, MeyGen, Magallanes Renovables, and two for Orbital Marine Power. [20] The first contract for a floating offshore wind turbine was also awarded, to Hexicon AB for their 32 MW TwinHub project. [21]

Parameters and results for AR4 by technology and delivery year [22]
PotTechnologyASP2012/MWh)Capacity (MW)SP2012/MWh)
All delivery years2023/242024/252025/262026/272023/242024/252025/262026/27
Pot 1

(established)

Solar PV (>5 MW)47251.381958.0345.9945.99
Onshore Wind (>5 MW)53887.9642.47
Energy from waste (with CHP)121
Pot 2 (less

established)

Tidal stream2115.6235.2178.54178.54
Floating offshore wind1223287.30
Remote Island Wind (RIW)62597.646.39
Offshore Wind466994.3437.35

AR5

The auction for AR5 took place between March and September 2023. The available budget was £170 million for Pot 1 (established technologies) and £35 million for Pot 2 (emerging technologies) including a minimum £10m ringfence for tidal stream. [23] Despite warnings from industry before the auction, there were no bids from offshore wind projects as the Administrative Strike Price was seen to be to low to cover the increases in supply chain and cost of capital. [24]

Parameters and results for AR5 by technology and delivery year [25] [26]
PotTechnologyASP2012/MWh)Capacity (MW)SP2012/MWh)
All delivery years2025/262026/272027/28All delivery years
Pot 1

(established)

Energy from waste (with CHP)116
Hydro (>5MW and <50MW)89
Landfill gas62
Offshore wind44
Onshore wind (>5 MW)5331.1204.41245.2452.29
Remote island wind (>5 MW))53223.652.29
Sewage gas148
Solar PV (>5 MW)47393.96150.741382.9847.00
Pot 2 (less

established)

Advanced Conversion Technologies182
Anaerobic digestion (>5 MW)136
Dedicated biomass with CHP162
Floating offshore wind116
Geothermal11975119.00
Tidal stream2024.548.54198.00
Wave245

AR6

The budget for AR6 was set at just over £1bn, split into three pots: [27] [28]

The Administrative Strike Prices were significantly increased from AR5.

Parameters for AR6 by technology [28]
PotTechnologyASP2012/MWh)
All delivery years
Pot 1

(established)

Energy from waste (with CHP)181
Hydro (>5MW and <50MW)102
Landfill gas69
Onshore wind (>5 MW)64
Remote island wind (>5 MW))64
Sewage gas162
Solar PV (>5 MW)61
Pot 2 (less

established)

Advanced Conversion Technologies210
Anaerobic digestion (>5 MW)144
Dedicated biomass with CHP179
Floating offshore wind176
Geothermal157
Tidal stream261
Wave257
Pot 3Offshore wind73

Generating capacity awarded

Capacity awarded (MW) by technology and Allocation Round [1] (n/a signifies technology was not eligible to bid into that auction)
RoundNuclearSolar PVOnshore windRemote island windOffshore windFloating offshore windTidal StreamBiomass conversionDedicated biomass with CHPEnergy from waste with CHPAdvanced Conversion TechnologyGeothermalTotal
Pre-AR13277n/a310110522997729
AR1n/a72749n/a1162n/a95622140
AR2n/an/an/an/a3196n/a86643346
AR3n/a2755466n/a345775
AR4n/a220988859869943241n/a3010792
AR5n/a1928148122453n/a123698
Total327742093118109719919329410523851251601233480

See also

Related Research Articles

The Renewables Obligation (RO) is designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. It was introduced in England and Wales and in a different form in Scotland in April 2002 and in Northern Ireland in April 2005, replacing the Non-Fossil Fuel Obligation which operated from 1990.

In finance, a contract for difference (CFD) is a legally binding agreement that creates, defines, and governs mutual rights and obligations between two parties, typically described as "buyer" and "seller", stipulating that the buyer will pay to the seller the difference between the current value of an asset and its value at contract time. If the closing trade price is higher than the opening price, then the seller will pay the buyer the difference, and that will be the buyer's profit. The opposite is also true. That is, if the current asset price is lower at the exit price than the value at the contract's opening, then the seller, rather than the buyer, will benefit from the difference.

<span class="mw-page-title-main">Wind power in the United Kingdom</span>

The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.

<span class="mw-page-title-main">Wind power in Estonia</span> Overview of wind power in Estonia

As of 2020, Estonia has a wind power installed capacity of about 320 MW. All operational wind farms in the country are on land. Offshore wind farms are planned on Lake Peipus and in the Baltic Sea near the island of Hiiumaa.

<span class="mw-page-title-main">Wind power in India</span>

Wind power generation capacity in India has significantly increased in recent years. As of 31 March 2024, the total installed wind power capacity was 45.887 gigawatts (GW). India has the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the southern, western, and northwestern states.

<span class="mw-page-title-main">Solar power in the United Kingdom</span>

Solar power has a small but growing role in electricity production in the United Kingdom.

<span class="mw-page-title-main">Renewable energy in the United Kingdom</span> Overview of renewable energy in the United Kingdom

Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.

<span class="mw-page-title-main">Wind power in France</span>

In 2021 France reached a total of 18,676 megawatts (MW) installed wind power capacity placing France at that time as the world's seventh largest wind power nation by installed capacity, behind the United Kingdom and Brazil and ahead of Canada and Italy. According to the IEA the yearly wind production was 20.2 TWh in 2015, representing almost 23% of the 88.4 TWh from renewable sources in France during that year. Wind provided 4.3% of the country's electricity demand in 2015.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

<span class="mw-page-title-main">EDF Renewables</span>

EDF Renewables is a wholly owned subsidiary of the French utility EDF Group, specializing in renewable energy production. As an integrated operator, the Group develops and finances the construction of renewable energy facilities, and manages operations and maintenance for its own account and for third parties.

Different methods of electricity generation can incur a variety of different costs, which can be divided into three general categories: 1) wholesale costs, or all costs paid by utilities associated with acquiring and distributing electricity to consumers, 2) retail costs paid by consumers, and 3) external costs, or externalities, imposed on society.

<span class="mw-page-title-main">Wind power in Massachusetts</span> Electricity from wind in one U.S. state

The U.S. state of Massachusetts has vast wind energy resources offshore, as well as significant resources onshore. The 2016 update to the states's Clean Energy and Climate Plan had a goal of reducing 1990 baseline greenhouse gas emissions levels by 25% by 2020. Current goals include installing 3,500 megawatts (MW) of offshore wind power in the state by 2035. However, as of Q4 2021 the state had only 120 MW of wind powered electricity generating capacity, responsible for generating 0.9% of in-state electricity production. The state has awarded contracts to two offshore projects, the 800 MW Vineyard Wind project and 804 MW Mayflower Wind project. Construction began on the Vineyard Wind 1 project on November 18, 2021, after a long fight for approval. Commonwealth Wind was selected for development in 2021, but the developer has attempted to cancel the project due to increased costs. There are eight projects planned for off the southern coast of Massachusetts, though some will deliver power to Rhode Island, Connecticut, and New York.

Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2023, a total of 277 turbines are expected to be built and produce a capacity of 3.6 GW, enough to power 6 million homes.

Hornsea Wind Farm is a Round 3 wind farm which began construction in 2018. Sited in the North Sea 120 km (75 mi) off the east coast of England, the eventual wind farm group is planned to have a total capacity of up to 6 gigawatt (GW).

MeyGen is a tidal stream energy plant in the north of Scotland. The project is located in the Pentland Firth, specifically the Inner Sound between the Island of Stroma and the Scottish mainland.

<span class="mw-page-title-main">Orbital O2</span> Orbital O2 floating tidal stream turbine

Orbital Marine Power is a Scottish renewable energy company focused on the development and global deployment of its pioneering floating turbine technology. The O2 is Orbital's first commercial turbine and represents the culmination of more than 15 years of world leading product development in the UK. The 74 m long turbine is expected to operate in the waters off Orkney for the next 15–20 years with the capacity to meet the annual electricity demand of around 2,000 UK homes with clean, predictable power from the fast-flowing waters while offsetting approximately 2,200 tonnes of CO2 production per year. In a further ground-breaking element of the project, the O2 will provide power to the European Marine Energy Centre's onshore electrolyser to generate green hydrogen that will be used to demonstrate decarbonisation of wider energy requirements.

The United Kingdom became the world leader of offshore wind power generation in October 2008 when it overtook Denmark.

Morlais is a grid connected tidal stream energy project located in the Irish Sea just off the west coast of Holy Island, Anglesey, Wales. It is being developed by the social enterprise agency Menter Môn. The site has the potential for up to 240 MW of renewable energy to be harnessed from the tides, using a mixture of seabed mounted and floating tidal energy devices from different companies.

References

  1. 1 2 3 Watson, Nicole; Bolton, Paul (17 October 2023). Contracts for Difference Scheme (Report). House of Commons Library. Retrieved 5 May 2024.
  2. Hinson, Suzanna; Bolton, Paul (8 April 2020). Support for low carbon power (Report). House of Commons Library. Retrieved 5 May 2024.
  3. Contracts for Difference Explainer (PDF) (Report). ITPEnergised. September 2021. Retrieved 5 May 2024.
  4. Barley, Shanta (16 December 2010). "Chris Huhne unveils plans for reform of UK energy market". The Guardian. ISSN   0261-3077 . Retrieved 4 May 2024.
  5. 1 2 3 McNaught, Colin. "MAJOR CHANGES FOR THE RENEWABLE ELECTRICITY MARKET: A FOCUS ON UK CONTRACTS FOR DIFFERENCE (CFD)". The Renewable Energy Institute. Retrieved 6 May 2024.
  6. 1 2 "Final Investment Decision Enabling for Renewables: Updates 1, 2 and 3". GOV.UK. 24 April 2014. Retrieved 5 May 2024.
  7. "FID Enabling for Renewables. Successful Projects offered an investment contract" (PDF). GOV.UK. 23 April 2014. Retrieved 5 May 2024.
  8. "UK nuclear power plant gets go-ahead". BBC News. 20 October 2013. Retrieved 5 May 2024.
  9. "Contracts for Difference (CfD): first allocation round". GOV.UK. 26 February 2015. Retrieved 5 May 2024.
  10. "Contracts for Difference (CFD) Allocation Round One Outcome" (PDF). GOV.UK. 26 February 2015. Retrieved 5 May 2024.
  11. "Contracts for Difference (CFD) Second Allocation Round Results". GOV.UK. 11 September 2017. Retrieved 5 May 2024.
  12. Marsh, Rob; Berry, Mark. "Contract for Difference in Great Britain: The offshore wind round? | United Kingdom | Global law firm | Norton Rose Fulbright". www.nortonrosefulbright.com. Retrieved 5 May 2024.
  13. 1 2 "Contracts for Difference (CFD) Second Allocation Round Results". GOV.UK. Retrieved 5 May 2024.
  14. "Contracts for Difference: An explanation of the methodology used to set administrative CFD strike prices for the next CFD allocation round". GOV.UK. Retrieved 5 May 2024.
  15. "Remote island wind set to benefit from latest support scheme". Shetland News. 13 September 2021. Retrieved 6 May 2024.
  16. KPMG (September 2019). "Blown away. CfD Round 3 delivers record low price for offshore wind" (PDF). Retrieved 5 May 2024.
  17. "Methodology used to set administrative strike prices for CfD Allocation Round 3". GOV.UK. Retrieved 6 May 2024.
  18. "Contracts for Difference (CfD) Allocation Round 3: results - published 20 September 2019, revised 11 October 2019". GOV.UK. Retrieved 7 May 2024.
  19. Dykes, Andrew (24 November 2021). "UK Government announces £20m ring-fenced tidal funding in upcoming CfD". Energy Voice. Retrieved 6 May 2024.
  20. Garanovic, Amir (7 July 2022). "UK's fourth contracts for difference round awards over 40MW of new tidal power capacity". Offshore Energy. Retrieved 7 May 2024.
  21. "Hexicon's TwinHub Wins First First-ever Dedicated CfD for Floating Wind in UK". Offshore Engineer Magazine. 7 July 2022. Retrieved 7 May 2024.
  22. "Contracts for Difference (CfD) Allocation Round 4: results (accessible webpage)". GOV.UK. Retrieved 6 May 2024.
  23. "Contracts for Difference (CfD) Allocation Round 5: statutory notices". GOV.UK. 3 August 2023. Retrieved 7 May 2024.
  24. Millman, Grace (8 September 2023). "AR5: Urgent government response needed to rebuild leadership in UK offshore wind - Regen" . Retrieved 7 May 2024.
  25. "Contracts for Difference (CfD) Allocation Round 5: core parameters". GOV.UK. Retrieved 7 May 2024.
  26. "Contracts for Difference (CfD) Allocation Round 5: results (accessible webpage)". GOV.UK. Retrieved 7 May 2024.
  27. "Energy UK explains: how much renewable energy can we expect from Allocation Round 6?". Energy UK. 6 March 2024. Retrieved 5 May 2024.
  28. 1 2 "Contracts for Difference (CfD): Budget Notice for the sixth Allocation Round, 2024" (PDF). GOV.UK. 6 March 2024. Retrieved 8 May 2024.