Dubai Maritime City

Last updated
Official Logo Dmc logo black-1.png
Official Logo

Dubai Maritime City (DMC) is a multipurpose maritime zone. It is a member of the DP World group of companies. [1] Maritime city was expected to be fully operational by 2012, and by January 2021 had completed 80% of the first phase's infrastructure works. [2] In February 2022 it was announced that DP World would launch a major project to develop DMC's infrastructure at a cost of Dh140 million. [1] The industrial part of Dubai Maritime City is fully operational, with a large number of business partners operating from DMC. [3] The industrial precinct is active and consists of marine services primarily dealing with ship lifts, ship repair plots, warehouses, workshops, as well as supporting retail and showrooms. [4]

Contents

Introduction

Dubai Maritime City on 8 May 2008 Dubai Maritime City on 8 May 2008 Pict 3.jpg
Dubai Maritime City on 8 May 2008

The 2.27 million square metre Dubai Maritime City is divided into the Maritime Centre, the Industrial Precinct, The Academic Quarter, the Marina District, the Harbour Residence, and the Harbour Offices. The Maritime Centre District is the centrepiece of Dubai Maritime City. Created as an urban corporate park, the District comprises eight waterfront and three interior parcels organized around a central boulevard.

The Maritime Centre comprises a cluster of five high-rise towers called the Creek Towers and Plaza, Landmark Tower located at the head of the man-made peninsula, and seven plots reserved for potential developers planning to construct their own towers. The centre will also feature a 5-star business hotel and premium service apartments.

Zones

Industrial Precinct

This sector is a hub for ship repair facilities, yacht charter, yacht repair and manufacturing, as well as workshop units. The precinct will be overseen by the management of Jadaf Dubai. A 1,270-meter stretch of wet berthing has been made available in this precinct, alongside 42 dry berths of various sizes. The large number of berthing spaces available here alleviates a space crunch for boats in Dubai. The area contains 19 ship repair plots and two ship lifts capable of lifting 3,000 and 6,000 tons each. [5] More than 100 workshops and warehouses complete the industrial precinct.

On October 9, 2012, Grandweld Shipyards celebrated the inauguration of its new facility in a special ceremony held at Grandweld Shipyards’ new location in Dubai Maritime City's industrial precinct. [6] In 2011, Grandweld had invested heavily to expand its manufacturing and production area to double its annual capacity for ship building from its original facilities in Al Jadaf, Dubai. Spread over 55,000sqm, Grandweld's new state of the art facility offers modern shipbuilding infrastructure; featuring 13,500sqm covered and insulated shipbuilding yard with overhead cranes, 28,000 open yard, 4000sqm modern offices, CNC shop and piping shop, and 5000sqm storage area. [6] Completed in 2012, the expansion increased Grandweld's production capacity by 60%, which is mainly dedicated for building and repairing larger vessels. Grandweld's new facility is designed with premium green building technologies and standards, and achieved the LEED GOLD Rating. [6] Grandweld is a leading Business Partner with Dubai Maritime City, with Grandweld the largest and most established shipyard in DMC. Grandweld provides a comprehensive range of ship repair services from its site in DMC, including ship conversion, drydockings, afloat repairs, and a wide range of sophisticated overhauling and repair services. [7] This Dubai Maritime City based company is a builder of vessels including crew boats, OSVs, tugs and high-speed vessels. [8] [9]

Dubai Maritime City Campus

The Dubai Maritime City Campus is located in the middle of Dubai Maritime City. The institutions here offers a syllabus encompassing marine engineering, marine transportation, and naval science, among others. The academy has the capabilities to provide for 1,300 students. The area also contains many other buildings such as a mosque, 500-room business hotel, seafarers club, convention center, and two-story library.

The Maritime Center

The Maritime Center is the core of Dubai Maritime City. It consists of eight waterfront and three interior parcels, which will serve as an international hub for maritime businesses. Also under construction in the area is the 45-story 229 metres (751 ft) tall Landmark Tower, which will function as a 5-star business hotel upon completion. [10] Many other projects were also planned such as the Swiftship Towers, 200 metres (656 ft) IRIS Mist hotel, Kensington Krystal hotel, Senali Aquamarine apartments, the Creek Towers office center, and a currently unnamed six-star hotel. [10]

Harbor Offices

The gateway to Dubai Maritime City contains 19 development plots offered for office tower development. This zone overlooks the harbor and is the nearest precinct to the causeway linking the project to the rest of Dubai.

Marina District and Harbor Residences

The district includes a group of mixed-use activity areas which cater to yacht owners and also houses restaurants, retail outlets and entertainment facilities. There are 14 plots available for construction of high-rise residential towers. [11]

Location

Dubai Maritime City lies in a northerly direction near the creek area business district, between Port Rashid and Dubai Dry Docks. Dubai Maritime city is located at a strategic position located just 1 km from jumeirah beach road, 1.5 km from Bur Dubai, 2.5 km from Shindaga tunnel in Deira, 10 km from Dubai International Airport and 3 km from Sheikh Zayed Road. The site is connected by a causeway to the wider road network, providing access to all of Dubai's principle expressways including Sheikh Zayed Road.

Purpose

When completed, Dubai Maritime City will be a mixed use development for the maritime industry, comprising industrial, commercial, residential and leisure facilities housed on a man-made peninsula by reclamation of land between Port Rashid and Dubai Dry Docks. As a peninsula development. Upon completion, it will feature the country's first National Maritime Museum and ship repair and maintenance facilities. The Dubai Maritime City Campus incorporates education, training, and research in a maritime complex accommodating over 1300 students in-training to support maritime businesses and services.

Recent developments

As of March 2009, the first phase of Dubai Maritime city of constructing 1000 berth marina has been completed, however construction has been halted in 2010 due to financial crises in Dubai. The entirety of the first phase of construction consisting of 96 low and high rise towers was completed in March 2012. [12] Phase 2 and 3 focus on finalizing the area and adding additional commercial towers and infrastructure. The entire project was expected to be completed by 2014. [12]

As of 1 March 2020, the Phase 1 of infrastructure developing, with cost of $38 million, is 25% complete, and it is expected to be completed by the early 2021. [13] [14]

See also

Related Research Articles

<span class="mw-page-title-main">Philadelphia Naval Shipyard</span> Naval shipyard of the United States

The Philadelphia Naval Shipyard was the first United States Navy shipyard and was historically important for nearly two centuries.

<span class="mw-page-title-main">Shipyard</span> Place where ships are built and repaired

A shipyard, also called a dockyard or boatyard, is a place where ships are built and repaired. These can be yachts, military vessels, cruise liners or other cargo or passenger ships. Compared to shipyards, which are sometimes more involved with original construction, dockyards are sometimes more linked with maintenance and basing activities. The terms are routinely used interchangeably, in part because the evolution of dockyards and shipyards has often caused them to change or merge roles.

<span class="mw-page-title-main">King Street Wharf</span> Wharf in Sydney, Australia

King Street Wharf is a mixed-use tourism, commercial, residential, retail and maritime development on the eastern shore of Darling Harbour, an inlet of Sydney Harbour, Australia. Located on the western side of the city's central business district, the complex served as a maritime industrial area in the early and mid 20th century. It was redeveloped as part of extensive urban renewal projects around Sydney Harbour in the 1980s and 90s. The complex is host to a cluster of nine wharves, with the first two wharves currently in use by private ferry operator Captain Cook Cruises and a third decommissioned by Sydney Ferries.

<span class="mw-page-title-main">Jebel Ali</span> Community in Dubai

Jebel Ali is a port town 35 kilometers (22 mi) south-west of Dubai. The Jebel Ali Port is located there. Al Maktoum International Airport has been constructed just outside the port area. Jebel Ali is connected to Dubai via the UAE Exchange, Danube and Energy stations on the Dubai Metro. Among the infrastructure projects built to support the port and town is the world's largest desalination plant, the Jebel Ali Desalination Plant, providing an ample supply of freshwater.

<span class="mw-page-title-main">Dubai World Trade Centre</span> Building in Dubai, United Arab Emirates

A global business facilitator since 1979, Dubai World Trade Centre (DWTC) is a prominent purpose-built convention and exhibition centre. DWTC provides a platform for connecting people, products, innovation and ideas from around the world through a dynamic calendar of international trade exhibitions and its own roster of sector leading mega events. As a designated free zone, complemented by award-winning commercial real estate, DWTC plays an integral role in Dubai and the region’s growth story with an estimated total economic output of AED 200 Billion, attracting over 30 million business visitors to Dubai over the past four decades.

<span class="mw-page-title-main">Cotai Strip</span> Informal name of an area of Macau, China

The Cotai Strip is the central area of Cotai, mostly known for its cluster of resort hotels and casinos. The term was first coined by Las Vegas Sands Corporation regarding its building of a strip of hotel-casinos in the Cotai section of Macau.

<span class="mw-page-title-main">Port of Karachi</span> Deep-water seaport in Sindh, Pakistan

The Port of Karachi is one of South Asia's largest and busiest deep-water seaports, handling about 60% of the nation's cargo located in Karachi, Pakistan. It is located on the Karachi Harbour, between Kiamari Azra Langri, Manora, and Kakapir, and close to Karachi's main business district and several industrial areas. The geographic position of the port places it in close proximity to major shipping routes such as the Strait of Hormuz. The administration of the port is carried out by the Karachi Port Trust, which was established in 1857.

<span class="mw-page-title-main">Cochin Shipyard</span> Shipbuilding and maintenance facility in India

Cochin Shipyard Ltd (CSL) is the largest shipbuilding and maintenance facility in India. It is part of a line of maritime-related facilities in the port-city of Kochi, in the state of Kerala, India. Of the services provided by the shipyard are building platform supply vessels and double-hulled oil tankers. It built the first indigenous aircraft carrier for the Indian Navy, the INS Vikrant. The company has Miniratna status.

<span class="mw-page-title-main">Business Bay</span> Community in Dubai, United Arab Emirates

Business Bay is a central business district under construction in Dubai, United Arab Emirates. The project features numerous skyscrapers located in an area where Dubai Creek has been dredged and extended, and located immediately south of Downtown Dubai. Business Bay will have upwards of 240 buildings, comprising commercial and residential developments. The infrastructure of Business Bay has been completed in 2008, and the entire development was expected to be completed between 2012-2015. Business Bay is part of the vision of His Highness Sheikh Mohammed Bin Rashed Al Maktoum, UAE Vice President, Prime Minister, Minister of Defence, and Ruler of Dubai. Business Bay will be a new 'city' within the city of Dubai and is being built as a commercial, residential and business cluster along a new extension of Dubai Creek extending from Ras Al Khor to Sheikh Zayed Road. Covering an area of 64,000,000 square feet (5,900,000 m2), once completed it will be composed of office and residential towers set in landscaped gardens with a network of roads, pathways and canals. It will become the region's business capital as well as a freehold city.

<span class="mw-page-title-main">Economy of Dubai</span> City economy

The economy of Dubai represents a per capita gross domestic product as of 2022 of US$46,665. Thani Bin Ahmed Al Zeyoudi, Minister of State for Foreign Trade, announced that the UAE's non-oil trade over 10 years totalled Dhs16.14 trillion. The UAE GDP jumping from $407 billion in 2021 to $440 billion in 2022 and $467 billion in 2023. Similarly, per capita GDP will also expand from $43,868 in 2021 to $46,665 in 2022 and $48,822 in 2023.

The government of Dubai took a decision to diversify from a trade-based, oil-reliant economy to one that is service and tourism-oriented. This has made real estate and other developments more valuable, thus resulting in a property boom from 2004 to 2006. Construction on a large scale has turned Dubai into one of the fastest-growing cities in the world. There are a number of large-scale projects which are currently under construction or are to be constructed in the future. Due to the heavy construction which is taking place in Dubai, 30,000 construction cranes, which are 25% of cranes worldwide, are operating in Dubai. Due to the burst of construction, Dubai has acquired various building-related records, which include: the world's tallest tower, the world's largest shopping mall, the world's largest fountain and the world's tallest hotel. Also under construction is Dubailand, which will be almost twice the size of the Walt Disney World Resort.

<span class="mw-page-title-main">Al Jaddaf</span> Community in Emirate of Dubai, United Arab Emirates

Al Jaddaf, also spelled Al Jadaf, is a locality in Dubai, United Arab Emirates (UAE). Located in western Dubai in Bur Dubai, Al Jaddaf is bordered to the north and east by the Dubai Creek, to the south by Zabeel, and to the west by Umm Hurair 2.

<span class="mw-page-title-main">Arabtec Holding PJSC</span>

Arabtec Holding PJSC, was Dubai's most heavily traded and largest construction group in GCC, together with its subsidiaries, provided construction services for residential, commercial, oil and gas, infrastructure, power, facilities management, and property development sectors in the United Arab Emirates and internationally. It operated through Construction; Mechanical, Electrical and Plumbing; Oil & Gas, Infrastructure and Power; and other segments. The company was involved in the construction of high-rise towers, buildings, and residential villas, as well as undertook drainage, electrical, mechanical, plumbing, contracting and related, and civil and infrastructure construction works. It also engaged in the real estate investment, development, leasing, and management activities; bought and sold real estate properties; and leased and managed third party properties. In addition, the company manufactured precast panels; and fabricated steel structures and profiles, as well as manufactured and transported ready mixed concrete

<span class="mw-page-title-main">Dubai International City</span> City in Dubai, United Arab Emirates

Dubai International City is a country-themed collection of residences, businesses, and tourist attractions. Spreading over an area of 800 hectares, the arrangement of the city is inspired by the traditional carpets of the Middle East. Once completed, the project will contain studio and one-bedroom apartments, and accommodate over 60,000 residents. Dubai International City is located in the Al Warsan region of Dubai, close to the Dubai Central Fruit and Vegetable Market.

The Kattupalli Shipyard, officially Adani Katupalli Port Private Limited is a large shipyard project at Kattupalli village near Ennore in Chennai, being built by L&T Shipbuilding Ltd. It is being set up jointly by TIDCO and Larsen & Toubro (L&T) in two phases. L&T shipbuilding Kattupalli is a minor port. Adani ports and special economic zone (APSEZ) acquired Kattupalli Port from L&T in June 2018 and renamed it as Adani Katupalli Port Private Limited (AKPPL).

<span class="mw-page-title-main">Seoul Lite</span> Proposed skyscraper in Seoul, South Korea

The Digital Media City Landmark Building or DMC Landmark Building, also known as Seoul Lite or Light Tower, was a 133-floor, 640 m (2,100 ft) supertall skyscraper proposed for construction in Digital Media City, Seoul, South Korea. It was slated to become the third-tallest building in the world when completed, after Burj Khalifa and Pingan International Finance Centre. It would have been the tallest building in Korea. Construction broke ground on 16 October 2009, and was scheduled to be completed and ready for occupancy by April 2015. It was to be built with the country's own capital and technology at an estimated cost of 3.3 trillion won.

<span class="mw-page-title-main">Kochi International Marina</span>

The Maritime Industrial Zoning Overlay District (MIZOD) was created in Baltimore, Maryland in 2004 to preserve deepwater access for port and maritime industrial uses. As waterfront residential and commercial development encroached on maritime industrial uses within the city, waterfront industries were finding it harder to receive loans from banks to upgrade and expand their operations. MIZOD is a zoning district overlaid across existing industrial zones along the water to allow only industries that use or need deep water access. The Overlay district was set to expire in 2014, but was recently extended to expire in 2024.

<span class="mw-page-title-main">Todd Pacific Shipyards, Los Angeles Division</span> American shipyard in San Pedro, Los Angeles, California

Todd Pacific Shipyards, Los Angeles Division was a shipyard in San Pedro, Los Angeles, California. Before applying its last corporate name, the shipyard had been called Los Angeles Shipbuilding & Dry Dock Company and Todd Shipyards, Los Angeles Division. Under those three names, the San Pedro yard built at least 130 ships from 1917 to 1989.

Meraas is a privately held holding company headquartered in Dubai with operations and assets in the United Arab Emirates. As of 2020, Meraas was reportedly due to become a subsidiary of Dubai Holding.

References

  1. 1 2 Reporter, A. Staff. "Dubai Maritime City launches of Dh140 million infrastructure project". Khaleej Times. Retrieved 2022-10-04.
  2. "Dubai Maritime City announces completion of 80 per cent of Phase 1 infrastructure works". Dubai Maritime City. 2021-01-20. Retrieved 2022-10-04.
  3. "Archives: Customers". Dubai Maritime City. Retrieved 2022-10-04.
  4. "Industrial". Dubai Maritime City. Retrieved 2022-10-04.
  5. "Dubai Maritime City". Dubaimaritimecity.com. Retrieved 2015-04-23.
  6. 1 2 3 "Grandweld Opens New Facility at Dubai Maritime City (UAE)". Offshore Energy. World Maritime News. 2012-10-10. Retrieved 2022-10-05.
  7. "Our Services - Grandweld Shipyards". 2021-10-18. Retrieved 2022-10-05.
  8. "Products - Grandweld Shipyards". 2021-09-01. Retrieved 2022-10-05.
  9. Maritime, Baird (2022-03-10). "AWARDS 2021 | Best OSV – Medium Crewboat – Tamimi 6 – Grandweld Shipyards". Baird Maritime. Retrieved 2022-10-05.
  10. 1 2 "Dubai Maritime City will build 229m Landmark Tower - Emirates 24|7". Emirates247.com. 2012-12-18. Retrieved 2015-04-23.
  11. "Dubai Maritime City Authority (DMCA)". Dmca.ae. Retrieved 2015-04-23.
  12. 1 2 "Maritime City launches Dh2.5bn realty project - Emirates 24|7". Emirates247.com. 2011-12-20. Retrieved 2015-04-23.
  13. "Dubai Maritime City Phase 1 reaches 25%, eyes Q1 2021 completion". Construction Week Online Middle East. Retrieved 2020-06-06.
  14. "Dubai Maritime City says construction of $38m commercial precinct 'on track'". ArabianBusiness.com. Retrieved 2020-06-06.

25°16′00″N55°15′57″E / 25.266645°N 55.265908°E / 25.266645; 55.265908