Duluth, Missabe and Northern Railway

Last updated
Duluth, Missabe and Northern Railway
Overview
Locale Minnesota, United States
Dates of operation1891 (1891)1937 (1937)
Successor Duluth, Missabe and Iron Range Railway
Technical
Track gauge 4 ft 8+12 in (1,435 mm) [1]

The Duluth, Missabe and Northern Railway (DM&N) was a railroad company in the U.S. state of Minnesota. It was one of the earliest iron ore hauling railroads of the area, said to have built the largest iron ore docks in the world, and later was one of the constituent railroads in the merger that formed the Duluth, Missabe and Iron Range Railway.

Contents

History

Iron ore had been a particularly plentiful commodity to ship from the Iron Range region, with the seven railroads serving Duluth in the 1891 hauling more than 7 billion pounds of freight. [2]

The Duluth, Missabe and Northern Railway was chartered on February 11, 1891, [3] then incorporated in May 1891 [4] by the Merritt brothers of Duluth. The company's first president was K. D. Chase of Faribault. [5] Its line was opened in 1892 with the first load of iron delivered via trackage rights on the Duluth and Winnipeg Railroad (D&W) and its ore dock in Superior, Wisconsin. [6] In 1893, due in part to the D&W's shortage of freight cars, the DM&N extended its line into Duluth, [7] and built what were then the largest iron ore docks in the world. [8] Also in 1893, the DM&N built a branch from Wolf Junction (near Virginia, Minnesota) to carry heavy mining equipment. [9] The city of Duluth proposed a celebration on Labor Day in 1893 for the completion of the line into Duluth, but the DM&N declined to participate saying that its line was not yet complete. [10] [11]

The company, along with other Merritt iron ore interests in the region, was acquired by John D. Rockefeller during the panic of 1893 as part of a deal that was valued near $30,000,000. [8] The sale was contested in an injunction filed by William L. Brown of Chicago, but the injunction was denied in February 1893. [12] [13] Shortly after, in June 1893, a massive fire blazed through several towns and industries along the DM&N line including Virginia City and Mountain Iron as well as the Minnewas, Messaba Mountain, Lone Jack and Ohio mines. [14] Several fines were soon filed against the railroad amid allegations of improperly favoring certain creditors, [15] [16] [17] [18] but the railroad continued to expand, with the last rail on the Hibbing line laid on October 24, 1893. [19] Although overall ownership had passed to the Rockefeller interests, the Merritts still retained control, as Leonidas Merritt was named president of the Lake Superior Consolidated Iron Mines company, which was then the parent company of the DM&N. [20] Rockefeller had required that the DM&N not work on Sundays, but with the assignment of F.T. Gates as president of DM&N in late October 1894, the railroad resumed working on Sundays. [21]

Plans were made in 1894 to extend the DM&N from Mountain Iron to the new town of Rainy Lake City. [22] Later, wildfires again threatened the railroad and the communities it served when parts of Virginia City and Mountain Iron were burned on June 5, 1894, and fire also destroyed the roundhouse at Hibbing. [23] By June 30, 1894, the DM&N had added 40.93 miles (65.87 km) of track in the previous 12-month period, making up 84% of all new track laid in the state during that time. [24] Later that Fall, reports circulated about possible construction to extend the lines of the DM&N, D&IR and others over Winter, but they were discredited by the press, [25] despite actions by the DM&N to develop a line to Superior, Wisconsin, [26] and a branch to Eveleth completed in December. [27]

Rockefeller sought to use the DM&N to compete with the lines of James J. Hill and William Cornelius Van Horne by extending the railroad westward and hauling more grain and lumber. His plan included construction of 400 miles (640 km) of new line across northern Minnesota to the Red River; there it would connect to a new railroad to be named Winnipeg and Southern Railway to build into Saskatchewan. [28] At the next annual meeting of the DM&N and associated mining companies, held on February 7, 1895, the railroad's contract with Rockefeller to ship 1,000,000 tons of ore was officially cancelled, leaving Rockefeller solely as a shareholder. [29] Following a judgment against Rockefeller in their favor alleging fraud in securing control of the DM&N, the Merritts set up new competition to the DM&N with the incorporation of the Duluth and Northwestern Railroad (D&NW) on September 11, 1895. [30] [31] Rockefeller continued with his plan, hoping to start construction in Spring 1896, [32] while the Merritts also planned to begin construction on the D&NW, following a line surveyed between the DM&N and D&IR at the same time. [33] Other DM&N management changes included the departure of general manager Donald M. Philbin in January 1896; [34] Philbin then took the general superintendent position at the Duluth & Winnipeg Railroad in April. [35] It was believed based on Philbin's move that the D&W may soon fall under the control of Canadian Pacific Railway. [36]

Although not to the extent that Rockefeller planned, the DM&N did start construction in early 1896 on new branches to the Victoria, Adams and Franklin mines. [37] In 1897, DM&N construction was focused on improvements to the existing line including trestle filling and grade lowering projects, [38] and plans were made to build a new coal dock in Duluth that would receive coal, from Rockefeller's ships, for delivery in the area, [39] as well as a 762-foot (232 m) extension to the existing dock. [40] Rockefeller did not abandon his larger plan, and instead built up a company with $12 million in capital for construction that was projected to begin in 1898. [41] But ore shipments in 1897 were down from previous years due to smaller winter stockpiles. [42] Throughout much of 1898, the DM&N and D&IR were involved in a civil case brought by a few independent mine owners in the region; the mine owners alleged that the railroads were giving unfair advantage in rates to the mines that the railroads' parent companies owned. The suit was dropped on November 26, 1898. [43]

With no progress made on construction westward for a connection to Saskatchewan, the announcement was made on February 7, 1899, that Rockefeller would sell his stake in the railroads and mines of the Mesabi Range to the Carnegie Steel Company. [44] Rockefeller sold the DM&N to U.S. Steel in 1901, who operated it as an independent company. [6] In 1906 the DM&N extended its line to Coleraine, [45] and in 1907 extended further to the Canisteo District to service the Canisteo and Orwell mines. [46] The DM&N carried first shipment of iron from Canisteo in 1909. [47]

DM&N ore docks at an unspecified date between 1900 and 1915 Duluth Ore Docks.jpg
DM&N ore docks at an unspecified date between 1900 and 1915

In order to continue iron ore shipments from Duluth, the DM&N played a big part in developing the St. Louis Bay harbor. The railroad built new ore docks there, including its Dock No. 4 at 2,304 feet (702 m) long with a capacity of 119,274 long tons (121,188 t). [48] The DM&N further dredged the bay to allow larger ore ships to reach its docks from 1905 to 1907. [49]

One 1907 report notes that the DM&N operated 72 locomotives, 5,132 freight cars and 26 passenger cars with a total of 242 miles (389 km) of standard gauge track. [50] Ten years later, a 1917 report notes that most of these statistics had grown, including 117 locomotives, 9,408 freight cars and 22 passenger cars, with 379.14 miles (610.17 km) of track; the DM&N had also leased both the Spirit Lake Transfer Railway and the Interstate Transfer Railway with additional trackage rights agreements with Northern Pacific Railway to reach the Union Depot in Duluth. [3] As of December 31, 1916, the company's total revenue was $14,389,278 with a net surplus of $6,862,169, both increased over the previous two years ($9,909,550 revenue and $4,559,225 surplus in 1915; $4,999,184 revenue and $325,331 surplus in 1914). [3]

On July 1, 1937, the DM&N and the Spirit Lake Transfer Railway were merged to form the Duluth, Missabe and Iron Range Railway. [4] [51]

Related Research Articles

<span class="mw-page-title-main">Mesabi Range</span> Mining district in northeastern Minnesota

The Mesabi Iron Range is a mining district in northeastern Minnesota following an elongate trend containing large deposits of iron ore. It is the largest of four major iron ranges in the region collectively known as the Iron Range of Minnesota. First described in 1866, it is the chief iron ore mining district in the United States. The district is located largely in Itasca and Saint Louis counties. It has been extensively worked since 1892, and has seen a transition from high-grade direct shipping ores through gravity concentrates to the current industry exclusively producing iron ore (taconite) pellets. Production has been dominantly controlled by vertically integrated steelmakers since 1901, and therefore is dictated largely by US ironmaking capacity and demand.

<span class="mw-page-title-main">2-8-8-4</span> Articulated locomotive wheel arrangement

A 2-8-8-4 steam locomotive, under the Whyte notation, has two leading wheels, two sets of eight driving wheels, and a four-wheel trailing truck. The type was generally named the Yellowstone, a name given it by the first owner, the Northern Pacific Railway, whose lines ran near Yellowstone National Park. Seventy-two Yellowstone-type locomotives were built for four U.S. railroads.

<span class="mw-page-title-main">Bessemer and Lake Erie Railroad</span> Railroad in the United States

The Bessemer and Lake Erie Railroad is a class II railroad that operates in northwestern Pennsylvania and northeastern Ohio.

<span class="mw-page-title-main">Duluth, Missabe and Iron Range Railway</span>

The Duluth, Missabe and Iron Range Railway (DM&IR), informally known as the Missabe Road, was a railroad operating in northern Minnesota and Wisconsin that used to haul iron ore and later taconite to the Great Lakes ports of Duluth and Two Harbors, Minnesota. Control of the railway was acquired on May 10, 2004, by the Canadian National Railway (CN) when it purchased the assets of Great Lakes Transportation.

<span class="mw-page-title-main">Duluth, Winnipeg and Pacific Railway</span>

The Duluth, Winnipeg and Pacific Railway is a subsidiary railroad of Canadian National Railway (CN) operating in northern Minnesota, United States. A CN system-wide rebranding beginning in 1995 has seen the DWP logo and name largely replaced by its parent company. The DWP line is CN's connection between International Falls and Duluth, Minnesota, where the railroad connects to a short stretch of the former Duluth, Missabe and Iron Range Railway before following the former Wisconsin Central to Chicago, Illinois.

<span class="mw-page-title-main">North Shore Scenic Railroad</span> Heritage Railroad

The North Shore Scenic Railroad is a heritage railroad that operates between Duluth and Two Harbors, Minnesota, United States, along 28 miles (45 km) of the Lakefront Line, once part of the Duluth, Missabe and Iron Range Railroad.

<span class="mw-page-title-main">Duluth, South Shore and Atlantic Railway</span>

The Duluth, South Shore and Atlantic Railway (DSS&A) was an American railroad serving the Upper Peninsula of Michigan and the Lake Superior shoreline of Wisconsin. It provided service from Sault Ste. Marie, Michigan, and St. Ignace, Michigan, westward through Marquette, Michigan, to Superior, Wisconsin, and Duluth, Minnesota. A branchline stretched northward from Nestoria, Michigan, up to the Keweenaw Peninsula and terminating at Houghton, Michigan, with two branches extending further to Calumet, Michigan, and Lake Linden, Michigan.

<span class="mw-page-title-main">Frank Doran (American politician)</span> Former mayor of Saint Paul, Minnesota

Frank Beecher Doran (1839—1914) was a Republican politician and the 24th mayor of Saint Paul, Minnesota, holding office between 1896 and 1898.

<span class="mw-page-title-main">Melvin Baldwin</span> 19th century American politician

Melvin Riley Baldwin was an American railroad engineer and Democratic politician. He served one term in the United States House of Representatives, representing Minnesota in the Fifty-third Congress. Earlier, he served in the Iron Brigade of the Army of the Potomac through most of the American Civil War.

<span class="mw-page-title-main">Endion station</span> Building

Endion station is a former train station in Duluth, Minnesota, United States. It was built in 1899 to serve the Endion neighborhood but was relocated to Canal Park in 1986 to make way for expansion of Interstate 35. Passenger service through the station had ceased in 1961 and freight service in 1978.

The Seven Iron Men, also known as Merritt Brothers, were iron-ore pioneers in the Mesabi Range in northeastern Minnesota and the creation of the city that is now known as Mountain Iron. In the late 1800s, the Merritt family founded the largest iron mine in the world and initiated the consolidation of the American railway system into what would ultimately become the United States Steel Corporation. Their story was told, in part, by the book Seven Iron Men by Paul de Kruif. The book was first published in 1929.

<span class="mw-page-title-main">Mountain Iron Mine</span> United States historic place

Mountain Iron Mine is a former mine in Mountain Iron, Minnesota, United States. Opened in 1892, it was the first mine on the Mesabi Range, which has proved to be the largest iron ore deposit ever discovered in the United States. Mining operations at the site ceased in 1956. The bottom of the open-pit mine has filled with water but its dimensions are readily visible. The city maintains an overlook in Mountain Iron Locomotive Park.

<span class="mw-page-title-main">Ore dock</span> Transportation construction

An ore dock is a large structure used for loading ore onto ships, which then carry the ore to steelworks or to transshipment points. Most known ore docks were constructed near iron mines on the upper Great Lakes and served the lower Great Lakes. Ore docks still in existence are typically about 60 feet (18 m) wide, 80 feet (24 m) high, and vary from 900 feet (270 m) to 2,400 feet (730 m) in length. They are commonly constructed from wood, steel, reinforced concrete, or combinations of these materials.

The Duluth Works was an industrial steel and cement manufacturing complex located in Duluth, Minnesota, United States, in operation 1915 to 1987. The complex was operated by the United States Steel Corporation. Officially, the plant's purpose was to supply the growing Midwest with steel finished products. Unofficially, they were built as part of a "gentleman's agreement" between U.S. Steel and the State of Minnesota to not impose hefty iron ore taxes on U.S. Steel in exchange for a fully integrated steel plant within Minnesota, whose mines furnished 80% of the ore to U.S. Steel. The combined works of the steel and cement plant were the largest employers in Duluth and the fourth largest industrial complex in Minnesota.

<span class="mw-page-title-main">Minneapolis, St. Paul and Sault Ste. Marie Railroad</span> Defunct American Class I railroad

The Minneapolis, St. Paul and Sault Ste. Marie Railroad (MStP&SSM) was a Class I railroad subsidiary of the Canadian Pacific Railway in the Midwestern United States. Commonly known since its opening in 1884 as the Soo Line after the phonetic spelling of Sault, it was merged with several other major CP subsidiaries on January 1, 1961, to form the Soo Line Railroad.

<span class="mw-page-title-main">William J. Olcott</span>

William James Olcott was an American football player and mining and railroad executive in the Mesabi Range. He played college football for the University of Michigan from 1881 to 1883 and was captain of the 1882 and 1883 teams. After receiving his degree, he worked in the iron ore mining industry for more than 40 years. He was president of the Oliver Iron Mining Company from 1909 to 1928 and president of the Duluth, Missabe and Iron Range Railway from 1901 to 1909.

<span class="mw-page-title-main">Elcor, Minnesota</span> Ghost town in Minnesota, United States

Elcor is a ghost town, or more properly, an extinct town, in the U.S. state of Minnesota that was inhabited between 1897 and 1956. It was built on the Mesabi Iron Range near the city of Gilbert in St. Louis County. Elcor was its own unincorporated community before it was abandoned and was never a neighborhood proper of the city of Gilbert. Not rating a figure in the national census, the people of Elcor were only generally considered to be citizens of Gilbert. The area where Elcor was located was annexed by Gilbert when its existing city boundaries were expanded after 1969.

<span class="mw-page-title-main">Paulson Mine</span>

The Paulson Mine is a former iron ore mine located in Cook County, Minnesota, United States, 53 kilometres north-west of Grand Marais, Minnesota near the end of the historic Gunflint Trail. The Port Arthur, Duluth and Western Railway was built to the mine in 1892 to access the ore, but both the mine and railway failed.

<span class="mw-page-title-main">Duluth and Northeastern 28</span> 2-8-0 Consolidation steam locomotive

Duluth and Northeastern 28 is a preserved 2-8-0 "Consolidation" type steam locomotive built in 1906 by the Pittsburgh Works of American Locomotive Company (ALCO) in Pittsburgh, Pennsylvania. It was restored to operating condition by the Lake Superior Railroad Museum from 2011-2017 and now operates in excursion service on the North Shore Scenic Railroad.

The Rice Lake, Dallas and Menomonie Railway (RLD&M) was a railroad company based in Wisconsin. It was known locally as "the Blueberry Line" due to the abundance of blueberry vines along its route.

References

  1. Pocket List 1907, pp. 17, 311.
  2. 'Change 1892.
  3. 1 2 3 Poor's 1917, p. 173.
  4. 1 2 Lewis 1996, p. 107.
  5. Men We Meet 1892.
  6. 1 2 Middleton, Smerk & Diehl 2007, p. 398.
  7. WPA 1941, p. 149.
  8. 1 2 30,000,000 1893.
  9. WPA 1941, p. 155.
  10. Duluth Will Celebrate 1893.
  11. Will Not Celebrate 1893.
  12. Spooner Is Heard 1893.
  13. Injunction Beaten 1893.
  14. The Roasted Range 1893.
  15. State House Pick-Ups 1893.
  16. Lien on Merritt's Road 1893.
  17. Receiver Wanted 1893.
  18. State House Notes 1893.
  19. Last Rail Laid 1893.
  20. The Metal Market 1893.
  21. John Must Have Backslidden 1894.
  22. Minnesota's Golden City 1894.
  23. Forest Fires Numerous 1894.
  24. Minnesota Railroads 1894.
  25. To Be Taken with Salt 1894.
  26. Capitol Echoes 1894.
  27. News in Minnesota 1894.
  28. A Contest for Supremacy 1894.
  29. Missabe Road Meeting 1895.
  30. New Opposition Road 1895.
  31. Duluth and Northwestern 1895.
  32. Rockefeller Line 1895.
  33. Another Mesaba Road 1895.
  34. Missabe's Manager Quits 1896.
  35. General Notes and Comments 1896.
  36. New D&W Superintendent 1896.
  37. Some Improvements 1896.
  38. Virginia Enterprise 1897.
  39. Plan A Big Coal Dock 1897.
  40. Missabe Dock Extension 1897.
  41. Railway Rumors 1897.
  42. Ore Falling Off 1897.
  43. Rate Case Called Off 1898.
  44. Carnegie Buys All 1899.
  45. WPA 1941, p. 97.
  46. WPA 1941, p. 84.
  47. WPA 1941, p. 99.
  48. Army Corps of Engineers 1907, p. 1836.
  49. Army Corps of Engineers 1907, pp. 1836, 1838.
  50. Pocket List 1907, p. 17.
  51. "History of the Missabe". Missabe Railroad Historical Society. Retrieved July 15, 2017.