A flood risk assessment (FRA) is an assessment of the risk of flooding from all flooding mechanisms, the identification of flood mitigation measures and should provide advice on actions to be taken before and during a flood.

Contents

The sources of water which produce floods include:

For each of the sources of water, different hydraulic intensities occur. Floods can occur because of a combination of sources of flooding, such as high groundwater and an inadequate surface water drainage system. The topography, hydrogeology and physical attributes of the existing or proposed development need to be considered. A flood risk assessment should be an evaluation of the flood risk and the consequences and impact and vulnerability.

Non-professional flood risk assessments can be produced by members of the public, Architects, environment assessors, or others who are not specifically professionally qualified in this field. However, it is a complex evaluation and such assessments they can be rejected by Authorities as inadequate, or could be considered as negligent in the event of a flooding event, damage and a claim to insurers being made.

In the UK, the writing ofprofessionalflood risk assessmentsis undertaken by Civil Engineering Consultants. They will have membership of the Institution of Civil Engineers and are bound by their rules of professional conduct. A key requirement is to ensure such professional flood risk assessments are independent to all parties by carrying out their professional duties with complete objectivity and impartiality. Their professional advice should be supported by professional indemnity insurance for such specific professional advice ultimately held with a Lloyd's of London underwriter.

Professional flood risk assessments can cover single buildings, or whole regions. They can part of a due-diligence process for existing householders or businesses, or can be required in England and Wales to provide independent evidence to a planning application on the flood risk.

England and Wales

In England and Wales, the Environment Agency requires a professional Flood Risk Assessment (FRA) to be submitted alongside planning applications in areas that are known to be at risk of flooding (within flood zones 2 or 3) and/ or are greater than 1ha in area, planning permission is not usually granted until the FRA has been accepted by the Environment Agency.

PPS 25 – England only

Flood Risk Assessments are required to be completed according to the National Planning Policy Framework, [1] which replaces Planning Policy Statement PPS 25: Development and Flood Risk. The initial legislation (PPG25) was introduced in 2001 and subsequently revised. [2]

PPS 25 was designed to "strengthen and clarify the key role of the planning system in managing flood risk and contributing to adapting to the impacts of climate change." [3] and sets out policies for local authorities to ensure flood risk is taken into account during the planning process to prevent inappropriate development in high risk areas and to direct development away from areas at highest risk.

In its introduction, PPS25 states "flooding threatens life and causes substantial damage to property [and that] although [it] cannot be wholly prevented, its impacts can be avoided and reduced through good planning and management". [4]

Composition of an FRA

For a flood risk assessment to be written, information is needed concerning the existing and proposed developments, the Environment Agency modeled flood levels and topographic levels on site. At its most simple (and cheapest) level an FRA can provide an indication of whether a development will be allowed to take place at a site.

An initial idea of the risk of fluvial flooding to a local area can be found on the Environment Agency flood map website.

FRAs consist of a detailed analysis of available data to inform the Environment Agency of flood risk at an individual site and also recommend to the developer any mitigation measures. More costly analysis of flood risk can be achieved through detailed flood modelling to challenge the agency's modelled levels and corresponding flood zones.

The FRA takes into account the risk and impact of flooding on the site, and takes into consideration how the development may affect flooding in the local area. It also includes provides recommendations as to how the risk of flooding to the development can be mitigated.

FRAs should also consider flooding from all sources including fluvial, groundwater, surface water runoff and sewer flooding.

For sites located within areas at risk of flooding a sequential test may be required. The aim of the sequential test is to direct development to locations at the lowest risk of flooding [5] . The National Planning Policy Framework (NPPF) was amended in 2020 to require sequential tests for sites that are at risk of any form of flooding.

Northern Ireland

In 2006, the Planning Service, part of The Department of the Environment, published Planning Policy Statement 15 (PPS15): Planning and flood risk. [6] The guidelines are precautionary and advise against development in flood plains and areas subject to historical flooding. In exceptional cases a FRA can be completed to justify development in flood risk areas. Advice on flood risk assessment is provided to the Planning Service by the Rivers Agency, which is the statutory drainage and flood defence authority for Northern Ireland.

Republic of Ireland

In 2009, the Department of the Environment, Heritage and Local Government and Office of Public Works published planning guidelines requiring local authorities to apply a sequential approach to flood risk management. [7] The guidelines require that proposed development in flood risk areas must undergo a justification test, consisting of a flood risk assessment.

See also

Related Research Articles

<span class="mw-page-title-main">Risk management</span> Identification, evaluation and control of risks

Risk management is the identification, evaluation, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability or impact of unfortunate events or to maximize the realization of opportunities.

Risk assessment determines possible mishaps, their likelihood and consequences, and the tolerances for such events. The results of this process may be expressed in a quantitative or qualitative fashion. Risk assessment is an inherent part of a broader risk management strategy to help reduce any potential risk-related consequences.

The Environment Agency (EA) is a non-departmental public body, established in 1996 and sponsored by the United Kingdom government's Department for Environment, Food and Rural Affairs, with responsibilities relating to the protection and enhancement of the environment in England.

An environmental impact statement (EIS), under United States environmental law, is a document required by the 1969 National Environmental Policy Act (NEPA) for certain actions "significantly affecting the quality of the human environment". An EIS is a tool for decision making. It describes the positive and negative environmental effects of a proposed action, and it usually also lists one or more alternative actions that may be chosen instead of the action described in the EIS. One of the primary authors of the act is Lynton K. Caldwell.

<span class="mw-page-title-main">Emergency management</span> Dealing with all humanitarian aspects of emergencies

Emergency management or disaster management is a science and a system charged with creating the framework within which communities reduce vulnerability to hazards and cope with disasters. Emergency management, despite its name, does not actually focus on the management of emergencies, which can be understood as minor events with limited impacts and are managed through the day-to-day functions of a community. Instead, emergency management focuses on the management of disasters, which are events that produce more impacts than a community can handle on its own. The management of disasters tends to require some combination of activity from individuals and households, organizations, local, and/or higher levels of government. Although many different terminologies exist globally, the activities of emergency management can be generally categorized into preparedness, response, mitigation, and recovery, although other terms such as disaster risk reduction and prevention are also common. The outcome of emergency management is to prevent disasters and where this is not possible, to reduce their harmful impacts.

<span class="mw-page-title-main">Land development</span> Landscape alteration

Land development is the alteration of landscape in any number of ways such as:

<span class="mw-page-title-main">Concentrated animal feeding operation</span> Type of American intensive animal farming

In animal husbandry, a concentrated animal feeding operation (CAFO), as defined by the United States Department of Agriculture (USDA), is an intensive animal feeding operation (AFO) in which over 1,000 animal units are confined for over 45 days a year. An animal unit is the equivalent of 1,000 pounds of "live" animal weight. A thousand animal units equates to 700 dairy cows, 1,000 meat cows, 2,500 pigs weighing more than 55 pounds (25 kg), 10,000 pigs weighing under 55 pounds, 10,000 sheep, 55,000 turkeys, 125,000 chickens, or 82,000 egg laying hens or pullets.

<span class="mw-page-title-main">Environmental impact assessment</span> Assessment of the environmental consequences of a decision before action

Environmental Impact assessment (EIA) is the assessment of the environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the term "environmental impact assessment" is usually used when applied to actual projects by individuals or companies and the term "strategic environmental assessment" (SEA) applies to policies, plans and programmes most often proposed by organs of state. It is a tool of environmental management forming a part of project approval and decision-making. Environmental assessments may be governed by rules of administrative procedure regarding public participation and documentation of decision making, and may be subject to judicial review.

<span class="mw-page-title-main">Scottish Environment Protection Agency</span> Environmental regulator in Scotland

The Scottish Environment Protection Agency is Scotland's environmental regulator and national flood forecasting, flood warning and strategic flood risk management authority. Its main role is to protect and improve Scotland's environment. SEPA does this by helping business and industry to understand their environmental responsibilities, enabling customers to comply with legislation and good practice and to realise the economic benefits of good environmental practice. One of the ways SEPA does this is through the NetRegs environmental guidance service. It protects communities by regulating activities that can cause harmful pollution and by monitoring the quality of Scotland's air, land and water. The regulations it implements also cover the storage, transport and disposal of radioactive materials.

<span class="mw-page-title-main">Environmental planning</span> Considering environment in developing land

Environmental planning is the process of facilitating decision making to carry out land development with the consideration given to the natural environment, social, political, economic and governance factors and provides a holistic framework to achieve sustainable outcomes. A major goal of environmental planning is to create sustainable communities, which aim to conserve and protect undeveloped land.

<span class="mw-page-title-main">Climate change adaptation</span> Process of adjusting to effects of climate change

Climate change adaptation is the process of adjusting to the effects of climate change. These can be both current or expected impacts. Adaptation aims to moderate or avoid harm for people, and is usually done alongside climate change mitigation. It also aims to exploit opportunities. Humans may also intervene to help adjustment for natural systems. There are many adaptation strategies or options. They can help manage impacts and risks to people and nature. The four types of adaptation actions are infrastructural, institutional, behavioural and nature-based options.

<span class="mw-page-title-main">Disaster risk reduction</span> Preventing new and reducing existing disaster risk factors

Disaster risk reduction (DRR) is an approach for planning and taking steps to make disasters less likely to happen, and less damaging when they do happen. DRR aims to make communities stronger and better prepared to handle disasters. When DRR is successful, it decreases the vulnerability of communities because it mitigates the effects of disasters. This means DRR can reduce the severity and number of risky events. Since climate change can increase climate hazards, DRR and climate change adaptation are often looked at together in development efforts.

Contaminated land contains substances in or under the land that are definitively or potentially hazardous to health or the environment. These areas often have a long history of industrial production and industrial farming. Many sites may be affected by their former uses such as mining, industry, chemical and oil spills and waste disposal. Areas that were previously industrial areas, called brownfield sites, are higher risk areas.

<span class="mw-page-title-main">Flood control</span> Methods used to reduce or prevent the detrimental effects of flood waters

Flood control methods are used to reduce or prevent the detrimental effects of flood waters. Flooding can be caused by a mix of both natural processes, such as extreme weather upstream, and human changes to waterbodies and runoff. Flood control methods can be either of the structural type and of the non-structural type. Structural methods hold back floodwaters physically, while non-structural methods do not. Building hard infrastructure to prevent flooding, such as flood walls, is effective at managing flooding. However, best practice within landscape engineering is more and more to rely on soft infrastructure and natural systems, such as marshes and flood plains, for handling the increase in water.

<span class="mw-page-title-main">Water security</span> A goal of water management to harness water-related opportunities and manage risks

The aim of water security is to make the most of water's benefits for humans and ecosystems. The second aim is to limit the risks of destructive impacts of water to an acceptable level. These risks include for example too much water (flood), too little water or poor quality (polluted) water. People who live with a high level of water security always have access to "an acceptable quantity and quality of water for health, livelihoods and production". For example, access to water, sanitation and hygiene services is one part of water security. Some organizations use the term water security more narrowly for water supply aspects only.

<span class="mw-page-title-main">Urban resilience</span> Ability of a city to function after a crisis

Urban resilience has conventionally been defined as the "measurable ability of any urban system, with its inhabitants, to maintain continuity through all shocks and stresses, while positively adapting and transforming towards sustainability".

<span class="mw-page-title-main">Fracking in the United Kingdom</span>

Fracking in the United Kingdom started in the late 1970s with fracturing of the conventional oil and gas fields near the North Sea. It was used in about 200 British onshore oil and gas wells from the early 1980s. The technique attracted attention after licences use were awarded for onshore shale gas exploration in 2008. The topic received considerable public debate on environmental grounds, with a 2019 high court ruling ultimately banning the process. The two remaining high-volume fracturing wells were supposed to be plugged and decommissioned in 2022.

<span class="mw-page-title-main">National Planning Policy Framework</span> Land-use planning policy in the U.K.

The National Planning Policy Framework (NPPF) is a land-use planning policy in England. It was originally published by the UK's Department of Communities and Local Government in March 2012, consolidating over two dozen previously issued documents called Planning Policy Statements (PPS) and Planning Policy Guidance Notes (PPG) for use in England. It has since been revised in 2018, 2019, 2021 and twice in 2023. The live version is from December 2023.

Climate resilience is a concept to describe how well people or ecosystems are prepared to bounce back from certain climate hazard events. The formal definition of the term is the "capacity of social, economic and ecosystems to cope with a hazardous event or trend or disturbance". For example, climate resilience can be the ability to recover from climate-related shocks such as floods and droughts. Methods of coping include suitable responses to maintain relevant functions of societies and ecosystems. To increase climate resilience means one has to reduce the climate vulnerability of people and countries. Efforts to increase climate resilience include a range of social, economic, technological, and political strategies. They have to be implemented at all scales of society, from local community action all the way to global treaties.

<span class="mw-page-title-main">Nature-based solutions</span> Sustainable management and use of nature for tackling socio-environmental challenges

Nature-based solutions is the sustainable management and use of natural features and processes to tackle socio-environmental issues. These issues include for example climate change, water security, food security, preservation of biodiversity, and disaster risk reduction. Through the use of NBS healthy, resilient, and diverse ecosystems can provide solutions for the benefit of both societies and overall biodiversity. The 2019 UN Climate Action Summit highlighted nature-based solutions as an effective method to combat climate change. For example, NBS in the context of climate action can include natural flood management, restoring natural coastal defences, providing local cooling, restoring natural fire regimes.

References

  1. National Planning Policy Framework (https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/6077/2116950.pdf) "National Planning Policy Framework"
  2. HMSO (2006, Revised 2010) Planning Policy Statement 25: Development and Flood Risk Archived 2010-02-15 at the Wayback Machine , TSO, London. ISBN   978-0-11-754099-6
  3. Angela Smith MP (7 December 2006) Planning Policy Statement (PPS) 25: Flooding, Written Parliamentary Statement
  4. Communities and Local Government (2006) Planning Policy Statement 25: Development and Flood Risk: Full Regulatory Impact Assessment
  5. "The sequential approach to the location of development". UK Government. Retrieved 2024-04-19.
  6. Department of the Environment (2006) Planning Policy Statement 15 (PPS 15): Planning and Flood Risk Archived 2011-07-19 at the Wayback Machine , The Planning Service, Belfast
  7. Government of Ireland (2009) The Planning System and Flood Risk Management Archived 2010-11-28 at the Wayback Machine , The Stationery Office, Dublin ISBN   978-1-4064-2467-6