Front Range Passenger Rail

Last updated

Front Range Passenger Rail
Westbound Southwest Chief - Colorado (cropped).jpg
A long-distance Amtrak train in Colorado
Overview
Service type Inter-city rail
StatusProposed
Locale Colorado and Wyoming
Website www.ridethefrontrange.com
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

Front Range Passenger Rail is a proposed inter-city passenger train service along the Front Range and broader I-25 corridors in Colorado and Wyoming. Most proposals envision a route from Pueblo north to Colorado Springs, Denver, Boulder, and Fort Collins. Extensions north to Cheyenne and south to Trinidad, Albuquerque, and even El Paso have been discussed.

Contents

Front Range communities were historically connected by rail transit until the mid-20th century. A series of studies performed since the early 2000s have shown mounting interest in renewed service. Momentum has grown significantly in the 2020s with Colorado creating the Front Range Passenger Rail District and Amtrak including the route in its 15-year expansion vision.

As of 2023, the Colorado Department of Transportation is working on a service development plan for the core route between Pueblo and Fort Collins. The plan will enable the state to solicit funding from voters and from the federal government.

History

Cheyenne Depot, now a railroad museum Cheyenne WY UP depot.JPG
Cheyenne Depot, now a railroad museum
Boulder Depot, now a restaurant Roadhouse Boulder Depot, SW facade.jpg
Boulder Depot, now a restaurant
Denver Union Station, served by Amtrak's California Zephyr and Winter Park Express A458, Union Station, Denver, Colorado, USA, the California Zephyr, 2016.jpg
Denver Union Station, served by Amtrak's California Zephyr and Winter Park Express
D&RGW Depot in Colorado Springs, now a shopping center D&RG RR Depot, Colo. Springs.jpg
D&RGW Depot in Colorado Springs, now a shopping center
Pueblo Union Depot, a proposed southern terminus for Front Range service Union Depot, Pueblo, Colorado LCCN2011631817.tif
Pueblo Union Depot, a proposed southern terminus for Front Range service

In the 19th century, the Atchison, Topeka and Santa Fe Railway and Denver and Rio Grande Western Railroad each built lines along the Front Range (now owned by BNSF and Union Pacific, respectively). Pueblo–Denver passenger service existed until the formation of Amtrak in 1971. [1] The Denver–Cheyenne segment was last served in 1997 by the Pioneer.

In 1989, rail supporters involved in preserving Denver Union Station formed the nonprofit Colorado Rail Passenger Association (ColoRail). The group has regularly advocated for the Front Range route, [2] and in 1997 played a role in starting Amtrak Thruway bus service along the corridor from Denver to Raton. [3]

With the 1998 Transportation Equity Act for the 21st Century, Congress authorized the US Department of Transportation to designate eleven federal high-speed rail corridors for targeted development. Ten were listed by the December 2001 funding deadline, though none in the mountain west. [4] In March 2002, the Colorado Department of Transportation (CDOT) nevertheless applied for designation of the "Rocky Mountain High Speed Rail Corridor" along I-25 and I-70. [5] The corridor has yet to be designated.

Rocky Mountain Rail Authority

In December 2004, Colorado State Representative Bob Briggs of Westminster founded the Front Range Commuter Rail organization. The stated goal of the organization was to start commuter rail along the Front Range by the time the Regional Transportation District's FasTracks mass transit started service in 2014. The proposed line was dubbed the "RangerXpress" [6] and received high-profile support from Colorado Senator Ken Salazar. [7]

In September 2006, the Colorado Transportation Commission approved a $1,246,000 grant for a high-speed rail feasibility study on corridors in Colorado, including the Front Range. [8] Although Front Range Commuter Rail had applied for the grant, CDOT required that the money go to a local government body. To this end, several counties and municipalities in Colorado formed the Rocky Mountain Rail Authority (RMRA) that November. The authority eventually grew to 45 members. [9] [10] By May 2007, the RMRA had raised over $415,000 in matching funds, exceeding the required 20% match on the CDOT grant. RMRA committed the final $325,000 the following month.

Work on the RMRA study began in June 2008 and it was released in March 2010. [11] It found that the I-25 corridor would meet the Federal Railroad Administration (FRA) criteria for technical and economic feasibility, including positive cost-benefit and farebox recovery ratios. [12]

In July 2011, the Colorado Secretary of State marked Front Range Commuter Rail as a delinquent organization effective June 1, 2010. [13]

Division of Transit and Rail

In May 2009, Colorado Governor Bill Ritter signed a bill creating the Division of Transit and Rail (DTR) within CDOT. [14] The division is responsible for developing rail services and administering state and federal rail funds in Colorado. [15] In March 2012, DTR released its first Colorado Freight and Passenger Rail Plan, which was required by the Passenger Rail Investment and Improvement Act of 2008 in order for Colorado to receive future FRA grants. The plan lists various versions of Front Range service as long-range projects. [16]

In April 2012, CDOT began an Interregional Connectivity Study (ICS) through an FRA grant, building on the 2010 RMRA study. Published in January 2014, the ICS recommended initial high-speed rail service between Fort Collins, Denver International Airport, and Briargate—a neighborhood of northern Colorado Springs—with future expansion to Pueblo. This alignment would bypass Boulder and downtown Denver via a new rail line built along the Colorado 470 beltway. The startup cost of the project was estimated at $9.81 billion with annual ridership of 13.6 million. [17]

In July 2015, CDOT began operating Bustang, an intercity bus service with several routes along the Front Range corridor. [18]

In July 2016, the Regional Transportation District (RTD) opened the initial 6.2-mile (10 km) section of the B Line from Denver to Westminster. An unfunded extension to Boulder and Longmont is planned for the 2040s. [19] This commuter rail line overlaps part of the route that later emerged as the favorite for Front Range Passenger Rail. [20]

Rail Commission

In spring 2017, Colorado enacted legislation creating the Southwest Chief & Front Range Passenger Rail Commission, effective July 1 of that year. The commission subsumed a body focused solely on supporting the long-distance Southwest Chief , taking on the additional task of developing passenger rail on the I-25 corridor. It is composed of representatives from CDOT, RTD, ColoRail, Amtrak, BNSF, Union Pacific, and various Colorado governments. [21] [22] In 2018 the General Assembly allocated $2.5 million toward the commission's duties, including development of a Front Range Passenger Rail service plan. [23]

CDOT updated the Colorado Freight and Passenger Rail Plan in 2018, naming Front Range Passenger Rail a "priority objective" and "Colorado's most immediate opportunity to improve and expand rail mobility." The Division of Transit and Rail committed to advancing the project. [24]

In December 2020, the Rail Commission published an "Alternatives Analysis" that identified three feasible routes for the Pueblo–Fort Collins segment of Front Range service. The alternatives consisted of nine initial stations, 18 to 24 round trips per day, speeds up to 110 miles per hour (180 km/h), and end-to-end travel times of 2.5 to 3 hours. Annual ridership was estimated at 2.2 million and startup costs at $7.8 to $14.5 billion. [25] [26]

In spring 2021, Amtrak included the Front Range route in its 2035 expansion vision. [27] As envisioned, the service would consist of three daily round trips between Pueblo and Fort Collins with one extending to Cheyenne. The end-to-end trip time would be 5 hours 34 minutes and the route would have an annual economic impact of $103 million. [28] This would be a state-supported Amtrak route similar to Illinois Service or NC By Train, meaning Colorado and Wyoming would shoulder much of the operating cost. [29]

Rail District

In June 2021, Colorado Governor Jared Polis signed a bill creating the Front Range Passenger Rail District in a ceremony at Pueblo Union Depot. The district spans nine counties of the I-25 corridor in Colorado. [30] It will be overseen by a board of stakeholders similar to those of the Southwest Chief & Front Range Passenger Rail Commission, which the district officially replaced on July 1, 2022. [31] Notably, the board can ask voters to approve a new sales tax up to 0.8% within the district to pay for the train service, but only after making every effort to secure federal funding. [32]

In October 2021, the Colorado Transportation Commission approved the final $1.6 million of the $3.9 million needed for new Front Range service studies. The FRA had already awarded a $685,000 grant and the rest came from the Rail Commission. The studies will take about two years and result in a workable service plan that the Rail District can use to secure funding. The project would still need separate environmental review. [33]

In November 2021, Congress passed President Biden's Infrastructure Investment and Jobs Act (IIJA), which allocates $215 million to public transportation in Colorado, $66 billion to Amtrak, and tens of billions to competitive transportation grant programs. [34] Advocates considered Front Range Passenger Rail well-positioned to benefit from these funds. [35] In May 2022, the FRA launched the Corridor Identification and Development Program as the mechanism for new passenger rail projects to receive funds from the IIJA. [36] Colorado's four Democratic House members sent a letter to USDOT and the FRA requesting that Front Range service be funded by the program. [37] [38] [39] In December 2023, the Fort Collins–Pueblo route was accepted into the Corridor ID program and was granted $500,000 toward development. [40] [41]

In June 2022, Colorado allocated nearly $9 million in "early stage Front Range Passenger Rail funding." [42] $2.4 million went to the rail district, providing matching dollars for federal contributions. $6.5 million went toward the Burnham rail yard redevelopment project in Denver. The move was geared toward making Colorado competitive for federal IIJA funding. [43]

In September 2023, Governor Polis was pushing to put a funding measure for Front Range service on the ballot as soon as November 2024. Planner are working on a service development plan which will finalize the proposed route, station stops, and frequency, while estimating timeline and cost. [44]

In March 2024, Colorado lawmakers proposed an increase to rental car fees in the state, which would provide matching dollars for federal rail funding without increasing taxes. [45]

New Mexico and Texas

In 2003, New Mexico Governor Bill Richardson announced plans for the Rail Runner Express, a commuter train between Belen, Albuquerque, and Santa Fe. To ensure passenger trains would have priority over freight, the state signed a $76 million agreement with BNSF in December 2005 to buy the line between Belen and Lamy. As part of the deal, BNSF insisted that the state also buy the line from Lamy to Trinidad, Colorado, that hosts the Southwest Chief and has been included in some plans for Front Range Passenger Rail expansion. [46] Governor Susana Martinez cancelled the purchase of this part of the line in March 2016. [47]

The American Recovery and Reinvestment Act of 2009 appropriated new funding for high-speed rail projects, renewing interest a possible "Rocky Mountain High Speed Rail Corridor". Colorado, New Mexico, and Texas sought designation for the Denver–Albuquerque–El Paso section of the I-25 corridor. In July 2009, in hopes of conducting a feasibility study, the states applied for $5 million in funds made available by the Passenger Rail Investment and Improvement Act of 2008. [48] [49] No study materialized.

In February 2024, a long-distance route between El Paso and Billings via Denver was proposed by the Federal Railroad Administration as part of the Long-Distance Service Study. [50]

See also

Related Research Articles

<i>Southwest Chief</i> Amtrak service between Chicago and Los Angeles

The Southwest Chief is a long-distance passenger train operated by Amtrak on a 2,265-mile (3,645 km) route between Chicago and Los Angeles through the Midwest and Southwest via Kansas City, Albuquerque, and Flagstaff. Amtrak bills the route as one of its most scenic, with views of the Painted Desert and the Red Cliffs of Sedona, as well as the plains of Illinois, Missouri, Kansas, and Colorado.

<span class="mw-page-title-main">Northstar Line</span> Commuter rail route in Minnesota, United States

The Northstar Line is a commuter rail route in the US state of Minnesota. Northstar runs 40 miles (64 km) from Big Lake to downtown Minneapolis at Target Field using existing track and right-of-way owned by the BNSF Railway. Passenger service began on November 16, 2009. The rail line serves part of the Northstar Corridor between Minneapolis and St. Cloud. Planning for the line began in 1997 when the Northstar Corridor Development Authority (NCDA) was formed. The corridor is also served by Interstate 94 and U.S. Highway 10. In 2023, the system had a ridership of 142,200, or about 500 per weekday as of the fourth quarter of 2023.

FasTracks is a multibillion-dollar public transportation expansion plan under construction in metropolitan Denver, Colorado, United States. Developed by the Regional Transportation District (RTD), the plan consists of new commuter rail, light rail, and express bus services. Six new light rail, electric commuter rail and diesel commuter rail lines with a combined length of 122 miles (196 km) will be constructed under the plan. It expands on previous transportation projects, notably T-REX, and includes 57 new transit stations and stops, 21,000 new parking spaces, 18 miles (29 km) of a bus service between Denver and Boulder and the renovation of Denver Union Station as a multi-modal transportation hub.

<i>Sunset Limited</i> Amtrak service between Los Angeles and New Orleans

The Sunset Limited is a long-distance passenger train operated by Amtrak on a 1,995-mile (3,211 km) route between New Orleans, Louisiana, and Los Angeles, California, with major stops in Houston, San Antonio, El Paso, and Tucson. Introduced in 1894 by the Southern Pacific Railroad, it is the oldest continuously operating named train in the United States.

<span class="mw-page-title-main">Southeast High Speed Rail Corridor</span> Proposed passenger rail project in the United States

The Southeast Corridor (SEC) is a proposed passenger rail transportation project in the Mid-Atlantic and Southeastern United States to extend high-speed passenger rail services from the current southern terminus of the Northeast Corridor in Washington, D.C.. Routes would extend south via Richmond and Petersburg, Virginia, with a spur to Norfolk in Virginia's Hampton Roads region; the mainline would continue south to Raleigh, Durham, Greensboro, and Charlotte, North Carolina. Since the corridor was first established in 1992, the U.S. Department of Transportation (USDOT) has extended it further to Atlanta, Georgia and Macon, Georgia; Greenville, South Carolina; Columbia, South Carolina; Jacksonville, Florida; and Birmingham, Alabama.

<i>Desert Wind</i> Former Amtrak long-distance rail service

The Desert Wind was an Amtrak long-distance passenger train that ran from 1979 to 1997. It operated from Chicago to Los Angeles as a section of the California Zephyr, serving Los Angeles via Salt Lake City; Ogden, Utah; and Las Vegas.

<i>Pioneer</i> (train) Former Amtrak train between Seattle and Chicago

The Pioneer was an Amtrak long-distance passenger train that ran between Seattle and Chicago via Portland, Boise, Salt Lake City, and Denver. Operating from 1977 to 1997, the Pioneer was the last passenger rail route to serve Wyoming, Southern Idaho, or Eastern Oregon.

Schuylkill River Passenger Rail is a proposed passenger train service along the Schuylkill River between Philadelphia and Reading, Pennsylvania, with intermediate stops in Norristown, King of Prussia, Phoenixville, and Pottstown.

<span class="mw-page-title-main">New Mexico Rail Runner Express</span> Commuter rail system in New Mexico, US

The New Mexico Rail Runner Express is a commuter rail system serving the metropolitan areas of Albuquerque and Santa Fe, New Mexico. It is administered by the New Mexico Department of Transportation (NMDOT) and the Rio Metro Regional Transit District, a regional transportation agency, while Herzog Transit Services currently holds the contract for the operation and maintenance of the line & equipment. Phase I of the system, operating on an existing right-of-way from Belen to Bernalillo that NMDOT purchased from BNSF Railway, opened in July 2006. Phase II, the extension of the line to Santa Fe, opened in December 2008. Daily ridership, as of February 2019, was 2,200 trips per day. In 2023, the system had a ridership of 584,400, or about 1,900 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">High-speed rail in the United States</span> Overview of the high-speed rail system in the United States of America

Plans for high-speed rail in the United States date back to the High-Speed Ground Transportation Act of 1965. Various state and federal proposals have followed. Despite being one of the world's first countries to get high-speed trains, it failed to spread. Definitions of what constitutes high-speed rail vary, including a range of speeds over 110 mph (180 km/h) and dedicated rail lines. Inter-city rail with top speeds between 90 and 125 mph is sometimes referred to in the United States as higher-speed rail.

<span class="mw-page-title-main">Hartford Line</span> CTrail commuter rail service in the US

The Hartford Line is a commuter rail service between New Haven, Connecticut, and Springfield, Massachusetts, using the Amtrak-owned New Haven–Springfield Line. The project is a joint venture between the states of Connecticut and Massachusetts, with support from the federal government as well. CT Rail-branded trains provide service along the corridor, and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices. The service launched on June 16, 2018.

The Ohio Hub was a high-speed railway project proposed in the 2000s decade by the Ohio Department of Transportation aimed at revitalizing passenger rail service in the Ohio region. The plan was awarded funding under the American Recovery and Reinvestment Act of 2009, but Governor John Kasich refused to use the funds for the project and the funds were reclaimed by the federal government. Passage of the 2021 Infrastructure Investment and Jobs Act raised the possibility of new funding for a similar project.

<span class="mw-page-title-main">Positive train control</span> Type of train protection system

Positive train control (PTC) is a family of automatic train protection systems deployed in the United States. Most of the United States' national rail network mileage has a form of PTC. These systems are generally designed to check that trains are moving safely and to stop them when they are not.

In the US state of Colorado, Interstate 25 (I-25) follows the north–south corridor through Colorado Springs and Denver. The highway enters the state from the north near Carr and exits the state near Starkville. The highway also runs through the cities of Fort Collins, Broomfield, Loveland, and Pueblo. The route is concurrent with U.S. Route 87 (US 87), which is unsigned, through the entire length of the state. I-25 replaced US 87 and most of US 85 for through traffic.

<span class="mw-page-title-main">Colorado Department of Transportation</span> State government agency

The Colorado Department of Transportation is the principal department of the Colorado state government that administers state government transportation responsibilities in the state of Colorado. CDOT is responsible for maintaining 9,144 mile highway system, including 3,429 bridges with over 28 billion vehicle miles of travel per year. CDOT's Mission is "To provide the best multi-modal transportation system for Colorado that most effectively moves people, goods, and information." It is governed by the Transportation Commission of Colorado.

The Northern Lights Express (NLX) is a planned higher-speed rail service that would run 155 miles (249 km) between Minneapolis and Duluth primarily in the U.S. state of Minnesota. A portion of the proposed line would run through neighboring Wisconsin to serve Duluth's "Twin Port" of Superior. Plans are to upgrade an existing BNSF Railway freight line to allow trains to travel at up to 90 miles per hour (145 km/h). The train service is said to provide an alternative to traveling Interstate 35 between Duluth and the Twin Cities or to other destinations along the line such as the casino in Hinckley.

<span class="mw-page-title-main">Transportation in Colorado</span> Transportation in the U.S. state of Colorado

Colorado's transportation consists of a network of highway, surface street, rail, and air options. While the public transportation system in Denver is much more complex and developed than other parts of the state, tourism and growth have led to extensive needs statewide.

<span class="mw-page-title-main">Central Corridor (Union Pacific Railroad)</span>

The Central Corridor is a rail line operated by the Union Pacific Railroad from near Winnemucca, Nevada to Denver, Colorado in the western United States. The line was created after the merger with the Southern Pacific Transportation Company by combining portions of lines built by former competitors. No portion of the line was originally built by the Union Pacific; in fact, some portions were built specifically to compete with the Union Pacific's Overland Route. The line is known for significant feats of engineering while crossing the Wasatch Mountains of Utah and the Rocky Mountains of Colorado. The line features numerous tunnels, the longest and highest of these is the Moffat Tunnel.

<span class="mw-page-title-main">Avelia Liberty</span> High-speed train from Alstom for North America

Avelia Liberty is a tilting high-speed passenger train built for the North American market by French manufacturer Alstom and assembled in the United States. Amtrak has ordered 28 train sets for use on its flagship Acela service along the Northeast Corridor between Boston and Washington, D.C., via New York City and Philadelphia.

<span class="mw-page-title-main">Point Defiance Bypass</span> Rail line in Pierce County, Washington, United States

The Point Defiance Bypass is a 14.5-mile-long (23.3 km) rail line between the cities of DuPont and Tacoma in Pierce County, Washington. It was originally built by the Northern Pacific Railway – the Tacoma–Lakewood segment in 1874 as part of the Prairie Line, and the Lakewood–DuPont section in 1891. Passenger service on the lines declined after the 1914 completion of a flatter route along Puget Sound, and ended entirely in 1956.

References

  1. "Santa Fe Joining Amtrack [sic]". Brownsville Herald . April 21, 1971. p. 2. Retrieved August 12, 2014 via Newspapers.com. Open Access logo PLoS transparent.svg
  2. "Colorado needs rail service from Ft. Collins to Pueblo". Colorado Rail Passenger Association. Retrieved November 23, 2021.
  3. Etsy, Jon; Souby, Jim. "A Brief History of ColoRail". Colorado Rail Passenger Association. Retrieved November 23, 2021.
  4. "Chronology of High-Speed Rail Corridors". Federal Railroad Administration, Department of Transportation. July 7, 2007. Archived from the original on November 30, 2009. Retrieved March 16, 2014.
  5. "Rocky Mountain Corridor" (PDF). Rocky Mountain Rail Authority. Archived from the original (PDF) on September 15, 2007.
  6. "Background". RangerXpress.com. Archived from the original on January 31, 2008. Retrieved November 22, 2021.
  7. Salazar, Ken (June 8, 2005). "SEN. SALAZAR ENDORSES FRONT RANGE HIGH SPEED RAIL" (Press release). Archived from the original on June 28, 2006.
  8. Leib, Jeffrey (September 17, 2006). "$22 million will fuel transit". Denver Post.
  9. "About". rockymountainrail.org. Rocky Mountain Rail Authority. Retrieved November 23, 2021.
  10. "Establishing Contract For The Rocky Mountain Rail Authority" (PDF). Rocky Mountain Rail Authority. Retrieved November 23, 2021.
  11. "Rail Feasibility Study". Rocky Mountain Rail Authority. Retrieved November 23, 2021.
  12. "High-Speed Rail Feasibility Study" (PDF). Rocky Mountain Rail Authority. March 2010. Retrieved November 30, 2021.
  13. "Front Range Commuter Rail - History and Documents". Colorado Secretary of State. Retrieved January 27, 2020.
  14. "GOV. RITTER CREATES TRANSIT AND RAIL DIVISION". Cherry Creek News. May 20, 2009. Retrieved December 9, 2021.
  15. "Transit & Rail". Colorado Department of Transportation. Retrieved December 9, 2021.
  16. "Colorado State Freight and Passenger Rail Plan" (PDF). Colorado Department of Transportation. March 2012. Retrieved December 9, 2021.
  17. "Interregional Connectivity Study Executive Summary" (PDF). Colorado Department of Transportation. January 2014. Retrieved November 30, 2021.
  18. "DOT Announces Service Start Date for Bustang™". Colorado Department of Transportation. April 15, 2015. Retrieved January 4, 2022.
  19. "Northwest Rail Line 2015 Fact Sheet" (PDF). Regional Transportation District. June 26, 2015. Retrieved November 23, 2021.
  20. Murray, Jon (April 23, 2021). "Front Range rail: Northwest route through Boulder emerges as favorite for line that could share track with RTD". The Denver Post. Retrieved November 24, 2021.
  21. "SB17-153 Southwest Chief And Front Range Passenger Rail Commission" (PDF). Colorado General Assembly. Retrieved November 23, 2021.
  22. "Southwest Chief & Front Range Passenger Rail Commission". Colorado Department of Transportation. Southwest Chief & Front Range Passenger Rail Commission. Retrieved November 23, 2021.
  23. "A Vision for Front Range Passenger Rail". Colorado Department of Transportation. Southwest Chief & Front Range Passenger Rail Commission. Retrieved November 23, 2021.
  24. "Colorado Freight and Passenger Rail Plan" (PDF). Colorado Department of Transportation. 2018. Retrieved December 12, 2021.
  25. "Alternatives Analysis Briefing" (PDF). Southwest Chief & Front Range Passenger Rail Commission. January 22, 2021. Retrieved January 4, 2022.
  26. "Alternatives Analysis". Front Range Passenger Rail. December 2020. Retrieved January 4, 2022.
  27. Heins, Nicole (April 13, 2021). "Amtrak hopes to reduce I-25 traffic by creating a passenger rail along the Front Range". KKTV 11 News. Retrieved November 24, 2021.
  28. "Front Range Corridor". Amtrak Connects US. Amtrak. Retrieved November 24, 2021.
  29. Murray, Jon (August 15, 2021). "Colorado's Front Range rail is still just an idea, but a Midwestern train shows what it could be". The Denver Post. Retrieved November 24, 2021.
  30. Luczak, Marybeth (July 1, 2021). "Report: Front Range Passenger Rail Moving Forward". Railway Age. Retrieved November 24, 2021.
  31. Gray, Matt; Esgar, Daneya; Zenzinger, Rachel; Garcia, Leroy. "SB21-238 Create Front Range Passenger Rail District". Colorado General Assembly. Retrieved November 24, 2021.
  32. Paul, Jesse (June 30, 2021). "Colorado takes its biggest step yet toward a Front Range passenger train system". The Colorado Sun. Retrieved November 24, 2021.
  33. Murray, Jon (October 22, 2021). "Front Range passenger rail proposal chugs forward with money to assess viability". The Denver Post. Retrieved November 26, 2021.
  34. Minor, Nathaniel (November 8, 2021). "Colorado is getting around $1 billion from the federal infrastructure bill for transportation projects". Colorado Public Radio. Retrieved November 24, 2021.
  35. Anderson, Mallory (December 4, 2021). "Front Range Passenger Rail closer to reality now that $1.2 trillion infrastructure package passed". KRDO. Retrieved December 5, 2021.
  36. Luczak, Marybeth (May 13, 2022). "FRA Launches Corridor ID Program". Railway Age. Retrieved May 23, 2022.
  37. "Neguse Leads Colorado Delegation Letter To DOT & FRA, Urges Funding For Colorado's Front Range Passenger Rail Project". neguse.house.gov. May 20, 2022. Archived from the original on May 20, 2022. Retrieved May 23, 2022.
  38. "Neguse letter" (PDF). Joe Neguse. May 13, 2022. Archived from the original (PDF) on May 20, 2022. Retrieved May 23, 2022.
  39. Davis, Robert (May 20, 2022). "Colorado Democrats ask for federal funding for Front Range rail". KPVI. Retrieved May 23, 2022.[ permanent dead link ]
  40. Aguilar, John (December 6, 2023). "Front Range Passenger Rail receives starter money from feds — with the promise of much more". The Denver Post. Retrieved December 7, 2023.
  41. "FY22 Corridor Identification and Development Program Selections" (PDF). railroads.dot.gov. Federal Railroad Administration. December 2023. Retrieved December 9, 2023.
  42. Weiser, Scott (June 7, 2022). "Polis signs funding bill for Front Range Passenger Rail project". Denver Gazette. Retrieved June 9, 2022.
  43. McCluskie, Julie; Rankin, Bob; Hansen, Chris. "SB22-176: Early Stage Front Range Passenger Rail Funding". Colorado General Assembly. Retrieved June 9, 2022.
  44. Minor, Nathaniel (September 29, 2023). "Polis wants to land billions for Front Range rail. He's looking to local leaders for help". Colorado Public Radio. Retrieved September 29, 2023.
  45. Kenney, Andrew (March 20, 2024). "How Colorado could use rental cars to fund its big railway expansion". Colorado Public Radio. Retrieved March 22, 2024.
  46. Fonseca, Felicia (December 6, 2005). "New Mexico buys BNSF tracks for commuter rail". Casper Star-Tribune Online. Retrieved November 22, 2021.
  47. "Governor: NM scrapping deal to buy BNSF track". Albuquerque Journal. Associated Press. March 16, 2013. Retrieved November 22, 2021.
  48. Leib, Jeffrey (July 9, 2009). "Colo., Texas, N.M. seek high-speed passenger train". The Denver Post. Retrieved November 30, 2021.
  49. "NM seeks high-speed rail with Colorado, Texas". www.bizjournals.com. July 9, 2009. Retrieved November 30, 2021.
  50. "Federal Railroad Administration (FRA) Amtrak Daily Long-Distance Service Study Northwest Regional Working Group Meeting 3" (PDF). Amtrak Daily Long-Distance Service Study. Retrieved March 11, 2024.

Further reading