German submarine U-3512

Last updated

History
War ensign of Germany (1938-1945).svg Nazi Germany
NameU-3512
Ordered6 November 1943
Builder F Schichau GmbH, Danzig
Yard number1657
Laid down15 August 1944
Launched11 October 1944
Commissioned27 November 1944
FateSunk on 8 April 1945
General characteristics
Class and type Type XXI submarine
Displacement
  • 1,621 t (1,595 long tons) surfaced
  • 1,819 t (1,790 long tons) submerged
Length
  • 76.70 m (251 ft 8 in) (o/a)
  • 60.50 m (198 ft 6 in) (p/h)
Beam
  • 8 m (26 ft 3 in) (o/a)
  • 5.3 m (17 ft 5 in) (p/h)
Height11.30 m (37 ft 1 in)
Draught6.32 m (20 ft 9 in)
Installed power
  • 4,000 PS (2,900 kW; 3,900 shp) (diesel drive)
  • 5,000 PS (3,700 kW; 4,900 shp) (standard electric drive)
  • 226 PS (166 kW; 223 shp) (silent electric drive)
Propulsion
Speed
  • Surfaced:
  • 15.6 knots (28.9 km/h; 18.0 mph) (diesel)
  • 17.9 knots (33.2 km/h; 20.6 mph) (electric)
  • Submerged:
  • 17.2 knots (31.9 km/h; 19.8 mph) (electric)
  • 6.1 knots (11.3 km/h; 7.0 mph) (silent running motors)
Range
  • 15,500 nmi (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph) surfaced
  • 340 nmi (630 km; 390 mi) at 5 knots (9.3 km/h; 5.8 mph) submerged
Test depth280 m (920 ft)
Complement57–60 crewmen
Sensors and
processing systems
Armament
Service record
Part of:
Commanders:
  • Kptlt. Hans Hornkohl [1]
  • 27 November 1944 – 8 April 1945
Operations: None
Victories: None

German submarine U-3512 was a Type XXI U-boat (one of the " Elektroboote ") of Nazi Germany's Kriegsmarine , built for service in World War II. She was ordered on 6 November 1943, and was laid down on 15 August 1944 at F Schichau GmbH, Danzig, as yard number 1657. She was launched on 11 October 1944, and commissioned under the command of Kapitänleutnant Hans Hornkohl on 27 November 1944. [2]

Contents

Design

Like all Type XXI U-boats, U-3512 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in) (o/a), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [3] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [3]

The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [3] U-3512 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [3]

Fate

U-3512 was sunk by bombs on 8 April 1945, at Kiel. The wreck was later raised and broken up. [2]

Related Research Articles

German submarine <i>U-2502</i> German World War II submarine

German submarine U-2502 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. The submarine was laid down on 25 April 1944 at the Blohm & Voss yard at Hamburg, launched on 15 June 1944, and commissioned on 19 July 1944 under the command of Kapitänleutnant Gert Mannesmann, who commanded her until 8 April 1945.

German submarine U-3509 was a Type XXI U-boat of Nazi Germany's Kriegsmarine during World War II. The Elektroboote submarine was laid down on 29 July 1944 at the Schichau-Werke yard at Danzig, launched on 27 September 1944, and commissioned on 29 January 1945 under the command of Oberleutnant zur See Karl-Heinz Voswinkel.

German submarine U-2509 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 June 1944 at the Blohm & Voss yard at Hamburg, as yard number 2509. She was launched on 27 August 1944, and commissioned under the command of Kapitänleutnant Rudolf Schendel on 21 September 1944.

German submarine U-2515 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 July 1944 at the Blohm & Voss yard at Hamburg, as yard number 2515. She was launched on 22 September 1944, and commissioned under the command of Oberleutnant zur See Gerhard Linder on 19 October 1944.

German submarine U-2541 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 31 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2541. She was launched on 13 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Stellmann on 1 March 1945.

German submarine U-3529 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 2 November 1944 at F Schichau GmbH, Danzig, as yard number 1674. She was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Karl-Heinz Schmidt on 22 March 1945.

German submarine U-2527 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 September 1944 at the Blohm & Voss yard at Hamburg, as yard number 2527. She was launched on 7 November 1944, and commissioned under the command of Oberleutnant zur See Hans Götze on 23 December 1944.

German submarine U-3002 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 May 1944 at AG Weser, Bremen as yard number 1161. She was launched on 9 July 1944, and commissioned under the command of Kapitänleutnant Helmut Manseck on 6 August 1944.

German submarine U-3020 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 1 October 1944 at AG Weser, Bremen as yard number 1179. She was launched on 16 November 1944, and commissioned under the command of Oberleutnant zur See Heinrich Mäuerler on 23 December 1944.

German submarine U-3025 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 October 1944 at AG Weser, Bremen, as yard number 1184. She was launched on 9 December 1944, and commissioned under the command of Oberleutnant zur See Hans Vogel on 20 January 1945.

German submarine U-3507 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 19 July 1944 at F Schichau GmbH, Danzig, as yard number 1652. She was launched on 16 September 1944, and commissioned under the command of Oberleutnant zur See Otto Niethmann on 19 October 1944.

German submarine U-3511 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 August 1944 at F Schichau GmbH, Danzig, as yard number 1656. She was launched on 11 October 1944, and commissioned under the command of Oberleutnant zur See Martin Grasse on 18 November 1944.

German submarine U-3513 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 August 1944 at F Schichau GmbH, Danzig, as yard number 1658. She was launched on 21 October 1944, and commissioned under the command of Oberleutnant zur See Otto-Heinrich Nachtigall on 2 December 1944.

German submarine U-2546 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 22 November 1944 at the Blohm & Voss yard at Hamburg, as yard number 2546. She was launched on 19 February 1945, and commissioned under the command of Oberleutnant zur See Max Dobbert on 21 March 1945.

German submarine U-3518 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 September 1944 at F Schichau GmbH, Danzig, as yard number 1663. She was launched on 11 November 1944, and commissioned under the command of Kapitänleutnant Herbert Brünning on 29 December 1944.

German submarine U-3525 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 October 1944 at F Schichau GmbH, Danzig, as yard number 1670. She was launched on 23 December 1944, and commissioned under the command of Kapitänleutnant Hans-Ludwig Gaude on 31 January 1945.

German submarine U-3528 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 26 October 1944 at F Schichau GmbH, Danzig, as yard number 1673. She was launched on 10 January 1945, and commissioned under the command of Kapitänleutnant Heinz Zwarg on 18 March 1945.

German submarine U-3006 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 June 1944 at AG Weser, Bremen, as yard number 1165. She was launched on 25 August 1944, and commissioned under the command of Kapitänleutnant Klaus Popp on 5 October 1944.

German submarine U-3041 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 7 December 1944 at AG Weser, Bremen as yard number 1200. She was launched on 13 February 1945, and commissioned under the command of Oberleutnant zur See Joachim Vieth on 10 March 1945.

German submarine U-3501 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 March 1944 at F Schichau GmbH, Danzig, as yard number 1646. She was launched on 19 April 1944, and commissioned under the command of Oberleutnant zur See Helmut Münster on 29 July 1944.

References

  1. Helgason, Guðmundur. "Hans Hornkohl". German U-boats of WWII - uboat.net. Retrieved 25 April 2016.
  2. 1 2 Helgason, Guðmundur. "U-3512". German U-boats of WWII - uboat.net. Retrieved 25 April 2016.
  3. 1 2 3 4 Gröner 1991, p. 85.

Bibliography