Locomotives of the North Staffordshire Railway

Last updated

The North Staffordshire Railway built or had constructed for it, approximately 350 locomotives. Until the company established Stoke railway works at Stoke-upon-Trent in 1864, a variety of engineering firms supplied locomotives. The company became more self-reliant as time went on, and by the beginning of the 20th century virtually all new engines were produced at Stoke works.

Contents

The North Staffordshire Railway became part of the London, Midland and Scottish Railway (LMS) in 1923 and its locomotives were taken into LMS stock. With the engine standardisation policy of the LMS, under the chairmanship of Sir Josiah Stamp, the relatively small number of NSR locomotives made them obvious candidates for early withdrawal and scrapping. Withdrawals started in 1927, and by April 1939 all locomotives in the capital stock had been withdrawn. [1]

Standard gauge locomotives

NSR original number
[2] [3]
1870 number
[2] [3]
Wheel arrangement
[2] [3]
Class
[2] [3]
Builder
[2] [3]
Builder no
[2] [3]
Built
[2] [3]
LMS number 1923
[2] [3]
LMS number 1928
[2] [3]
LMS power class 1923
[2] [3]
LMS power class 1928
[2] [3]
Withdrawn
[2] [3]
Notes
[3]
11 2-2-2 Sharp Brothers and Company 484February 1848April 1891Named Dragon. Rebuilt as a 2-2-2ST 1866.
226 2-2-2 Sharp Brothers and Company 486March 18481882Rebuilt as a 2-4-0 c.1867.
2327 2-2-2 Sharp Brothers and Company 549October 18481883Rebuilt as a 2-4-0 c.1867.
2481 2-2-2 Sharp Brothers and Company 550October 18481882Rebuilt as a 2-4-0 c.1867.
272 2-2-2 Sharp Brothers and Company 551October 1848December 1890Rebuilt as a 2-2-2ST 1866.
2929 2-2-2 Sharp Brothers and Company 554November 18481883Rebuilt as a 2-4-0 c.1867.
5 2-4-0 B. Hick and Son 18481868
630 2-4-0 B. Hick and Son 18481881
74 2-4-0 B. Hick and Son 18481881Rebuilt as 2-2-2WT 1851.
85 2-4-0 B. Hick and Son 18481881Rebuilt as 2-2-2WT 1851.
338 2-4-0 Jones and Potts 18481874
439 2-4-0 Jones and Potts 18481874
931 2-4-0 Robert Stephenson and Company 67118481879
1032 2-4-0 Robert Stephenson and Company 67218481884
1141 2-4-0 Robert Stephenson and Company 67318481874
1246 2-4-0 Jones and Potts 18481884
13 2-4-0 Robert Stephenson and Company 67418481868
1444 2-4-0 Jones and Potts 18481883
1933 2-4-0 Robert Stephenson and Company 67518481883
2042 2-4-0 Robert Stephenson and Company 67618481874
2234 2-4-0 Jones and Potts 18481884
2545 2-4-0 Jones and Potts 18481884
2835 2-4-0 Robert Stephenson and Company 67718481881
306 2-4-0 Kitson, Thompson and Hewitson 17618481878Rebuilt as 2-4-0T c.1865.
317 2-4-0 Kitson, Thompson and Hewitson 17718481874Rebuilt as 2-4-0T c.1865.
328 2-4-0 Kitson, Thompson and Hewitson 17818481878Rebuilt as 2-4-0T c.1865.
3840 2-4-0 Jones and Potts 18481881
3943 2-4-0 Jones and Potts 18481883
4036 2-4-0 Jones and Potts 18481883
4237 2-4-0 Jones and Potts 18481883
459 2-4-0 Kitson, Thompson and Hewitson 17918491874Rebuilt as 2-4-0T c.1865.
4610 2-4-0 Kitson, Thompson and Hewitson 18018491874Rebuilt as 2-4-0T c.1865.
4711 2-4-0 Kitson, Thompson and Hewitson 18118491874Rebuilt as 2-4-0T c.1865.
1564 0-6-0 Vulcan Foundry 27918481873
1665 0-6-0 Vulcan Foundry 28018481873
1766 0-6-0 Vulcan Foundry 28118481877
1867 0-6-0 Vulcan Foundry 28218481875
2168 0-6-0 Vulcan Foundry 28318481875
2669 0-6-0 Vulcan Foundry 28418481873
3770 0-6-0 Vulcan Foundry 28518481873
4171 0-6-0 Vulcan Foundry 28618491874
4372 0-6-0 Vulcan Foundry 28718491876
4473 0-6-0 Vulcan Foundry 2881850June 1888
3376 0-6-0 Robert Stephenson and Company 4061844December 1902Acquired second hand from Grissell & Peto, contractors, 1848.
3458 0-6-0 Robert Stephenson and Company 42218441881Acquired second hand from Grissell & Peto, contractors, 1848. Rebuilt as 0-6-0ST and renumbered 42 in June 1866.
3577 0-6-0 Robert Stephenson and Company 4231844December 1902Acquired second hand from Grissell & Peto, contractors, 1848.
3659 0-6-0 Robert Stephenson and Company 42418441880Acquired second hand from Grissell & Peto, contractors, 1848. Rebuilt as 0-6-0ST June 1866.
4816 2-4-0 Kitson, Thompson and Hewitson 22618501884Rebuilt as a 2-2-2 1851.
4917 2-4-0 Kitson, Thompson and Hewitson 22718501882Rebuilt as a 2-2-2 1851.
5018 2-4-0 Kitson, Thompson and Hewitson 22818501882Rebuilt as a 2-2-2 1851.
5119 2-4-0 Kitson, Thompson and Hewitson 22918501871Rebuilt as a 2-2-2 1851.
5220 2-4-0 Kitson, Thompson and Hewitson 23018501883Rebuilt as a 2-2-2 1851.
5321 2-4-0 Kitson, Thompson and Hewitson 23118501882Rebuilt as a 2-2-2 1851.
5422 2-2-2 Kitson, Thompson and Hewitson 23818511886
5523 2-2-2 Kitson, Thompson and Hewitson 23918511886
5624 2-2-2 Kitson, Thompson and Hewitson 24018511886
5725 2-2-2 Kitson, Thompson and Hewitson 24118511882
58 0-6-0 Robert Stephenson and Company 678July 18491851Sold to the Midland Railway.
59 0-6-0 Robert Stephenson and Company 679July 18491851Sold to the Midland Railway.
60 0-6-0 Robert Stephenson and Company 680August 18491851Sold to the Midland Railway.
61 0-6-0 Robert Stephenson and Company 681January 18501851Sold to the Midland Railway.
62 0-6-0 Robert Stephenson and Company 682December 18491851Sold to the Midland Railway.
63 0-6-0 Robert Stephenson and Company 68318511851Sold to the contractors for the Dutch Rhenish Railway Company.
58102 0-6-0 Kitson, Thompson and Hewitson 3161853November 1897
59103 0-6-0 Kitson, Thompson and Hewitson 31718531898
6060 0-6-0 Vulcan Foundry 38318551884Rebuilt as 0-6-0ST 1870.
6161 0-6-0 Vulcan Foundry 38418551887Rebuilt as 0-6-0ST 1870.
6262 0-6-0 Vulcan Foundry 3851855November 1888Rebuilt as 0-6-0ST 1870.
6363 0-6-0 Vulcan Foundry 38618551884Rebuilt as 0-6-0ST 1870.
64100 0-6-0 Robert Stephenson and Company 13301860October 1896
66101 0-6-0 Robert Stephenson and Company 13311860March 1897
653 2-2-2WT ??1883Possibly built by Robert Stephenson and Company in 1850. Alternatively possibly purchased from Peto & Leishman, contractors, in 1849.
6756 0-6-0ST Robert Stephenson and Company 14141862March 1888
6857 0-6-0ST Robert Stephenson and Company 14151862March 1888
6978 0-6-0 Hudswell Clarke 35October 1864July 1899
7079 0-6-0 Hudswell Clarke 36November 1864December 1898
7180 0-6-0 Hudswell Clarke 39January 1865July 1900
7281 0-6-0 Hudswell Clarke 40February 1865October 1899
7382 0-6-0 Hudswell Clarke 43May 1865June 1907
7483 0-6-0 Hudswell Clarke 44June 1865June 1907
7584 0-6-0 Neilson and Company 11451865December 1909
7685 0-6-0 Neilson and Company 11461865December 1909
7786 0-6-0 Neilson and Company 11471865June 1910
7887 0-6-0 Neilson and Company 11481865July 1910
7988 0-6-0 Neilson and Company 11491865December 1909
8089 0-6-0 Neilson and Company 11501865November 1913
9090 0-6-0 F (from 1903) Worcester Engine Company 71866December 1910Allocated to class F after rebuilding.
9191 0-6-0 F (from 1904) Worcester Engine Company 81867February 1911Allocated to class F after rebuilding.
9292 0-6-0 F (from 1901) Worcester Engine Company 91867March 1911Allocated to class F after rebuilding.
9393 0-6-0 Worcester Engine Company 101867June 1909
9494 0-6-0 Worcester Engine Company 111867June 1909
9595 0-6-0 F (from 1898) Worcester Engine Company 121867June 1909Allocated to class F after rebuilding.
9696 0-6-0 Worcester Engine Company 131867May 1913
9797 0-6-0 F (from 1907) Worcester Engine Company 141867May 1913Allocated to class F after rebuilding.
9898 0-6-0 Worcester Engine Company 151867December 1908
9999 0-6-0 Worcester Engine Company 161867December 1908
8251 0-6-0ST Hudswell Clarke 77June 18661880
552 0-6-0ST Stoke works 18681879First locomotive built by the NSR at its own workshops.
1353 0-6-0ST Stoke works 18681880
2454 0-6-0ST Stoke works 18681882
55 0-6-0ST Isaac Dodds and Son 18651882Acquired in 1870.
74 0-6-0 E Stoke works 18712320865011FJune 1934Renumbered 74A in 1919.
75 0-6-0 E Stoke works 187123211February 1926Renumbered 75A in 1919.
104 0-6-0 E Vulcan Foundry 64218722322865111FDecember 1932
105 0-6-0 E Vulcan Foundry 643187223231November 1926
106 0-6-0 E Vulcan Foundry 64418722324865211FNovember 1932
107 0-6-0 E Vulcan Foundry 645187223251June 1927
108 0-6-0 E Vulcan Foundry 64618722326865311FNovember 1930
109 0-6-0 E Vulcan Foundry 64718722327865411FSeptember 1931
110 0-6-0 E Vulcan Foundry 64818722328865511FDecember 1929
111 0-6-0 E Vulcan Foundry 64918722329865611FMarch 1930
112 0-6-0 E Vulcan Foundry 65018722330865711FDecember 1928
113 0-6-0 E Vulcan Foundry 65118722331865811FDecember 1928
118 0-6-0 E Beyer, Peacock and Company 1348April 187423341August 1927Renumbered 118A in 1918.
119 0-6-0 E Beyer, Peacock and Company 1349April 187423351December 1926Renumbered 119A in 1918.
120 0-6-0 E Beyer, Peacock and Company 1350April 18742336865911FMarch 1930Renumbered 120A in 1918.
121 0-6-0 E Beyer, Peacock and Company 1351April 187423371July 1927Renumbered 121A in 1918.
122 0-6-0 E Beyer, Peacock and Company 1352April 18742338866011FDecember 1933
123 0-6-0 E Beyer, Peacock and Company 1353May 18742339866111FMay 1928
67 0-6-0 E Stoke works 18752340866211FDecember 1928
68 0-6-0 E Stoke works 18752341866311FMay 1928
72 0-6-0 E Stoke works 18761919
66 0-6-0 E Stoke works 18772342866411FNovember 1930
19 2-4-0 19 Stoke works 18711905
69 0-6-0 69 Sharp, Stewart and Company 234218731922Renumbered 69A in 1913.
70 0-6-0 69 Sharp, Stewart and Company 2343187323321May 1927Renumbered 70A in 1914.
64 0-6-0 69 Sharp, Stewart and Company 237818731918Renumbered 64A in 1913.
65 0-6-0 69 Sharp, Stewart and Company 237918731919Renumbered 65A in 1913.
114 0-6-0 69 Sharp, Stewart and Company 242418741920Renumbered 114A in 1916.
115 0-6-0 69 Sharp, Stewart and Company 242518741920Renumbered 115A in 1917.
116 0-6-0 69 Sharp, Stewart and Company 2426187423331September 1926Renumbered 116A in 1916.
117 0-6-0 69 Sharp, Stewart and Company 242718741916
7 2-4-0 7 Stoke works 18741897Renumbered 7A in 1895.
10 2-4-0 7 Stoke works 1874December 1894
71 2-4-0 7 Stoke works 18741894
9 2-4-0T 9 Stoke works 18741916Renumbered 9A in 1907.
11 2-4-0T 9 Stoke works 18741916Renumbered 11A in 1907.
12 2-4-0T 9 Sharp, Stewart and Company 244518741916Rebuilt as 2-4-2T 1899. Renumbered 12A in 1908.
41 2-4-0T 9 Sharp, Stewart and Company 244618741916Rebuilt as 2-4-2T 1899. Renumbered 41A in 1908.
42 2-4-0T 9 Sharp, Stewart and Company 244718741916Rebuilt as 2-4-2T 1899. Renumbered 42A in 1908.
38 2-4-0 38 (later C) Stoke works 18741912Became Class C after rebuild in 1893.
39 2-4-0 38 (later C) Stoke works 18741912Became Class C after rebuild in 1892.
13 2-4-0 38 (later C) Dübs and Company 85818751912Became Class C after rebuild in 1893. Renumbered 13A in 1912.
14 2-4-0 38 (later C) Dübs and Company 85918751919Became Class C after rebuild in 1888. Renumbered 14A in 1912.
15 2-4-0 38 (later C) Dübs and Company 8601875June 1906Became Class C after rebuild in 1894.
47 0-6-0ST 56 Robert Stephenson and Company 22511875June 1890Sold to Madeley Coal & Iron Company.
48 0-6-0ST 56 Robert Stephenson and Company 22521875June 1887
49 0-6-0ST 56 Robert Stephenson and Company 22531875June 1885
50 0-6-0ST 56 Robert Stephenson and Company 22541875October 1889
6 2-4-0T A Stoke works 18781910Renumbered 6A in 1910.
8 2-4-0T A Stoke works 18781914Renumbered 8A in 1911.
31 2-4-0T A Stoke works 18791921Renumbered 31A in 1914.
52 2-4-0T A Stoke works 18791454145411PAugust 1932Rebuilt as 2-4-2T 1899.
51 2-4-0T A Stoke works 18801914Renumbered 51A in 1913.
53 2-4-0T A Stoke works 18801921Renumbered 53A in 1914.
35 2-4-0T A Stoke works 18811455145511POctober 1932Rebuilt as 2-4-2T 1899.
40 2-4-0T A Stoke works 18811456145611PAugust 1932Rebuilt as 2-4-2T 1899.
4 2-4-0T B Stoke works 18811921Renumbered as 4A in 1915.
5 2-4-0T B Stoke works 18811922Renumbered as 5A in 1915.
30 2-4-0T B Stoke works 18811920Renumbered 30A in 1914.
17 2-4-0T B Stoke works 18821440144011PJune 1928Renumbered 17A in 1920.
18 2-4-0T B Stoke works 18821441144111PJune 1933Renumbered 18A in 1921.
21 2-4-0T B Stoke works 18821457145711PAugust 1932Rebuilt as 2-4-2T 1901.
22 2-4-0T B Stoke works 18821442144211PDecember 1932Renumbered 22A in 1921. Under the LMS was transferred to the North London Railway for a period of time.
25 2-4-0T B Stoke works 18821921Renumbered 25A in 1921.
26 2-4-0T B Stoke works 18821921
28 2-4-0T B Stoke works 18821922
27 2-4-0T B Stoke works 188314431July 1925Renumbered 27A in 1922.
29 2-4-0T B Stoke works 18831444144411POctober 1932Renumbered 29A in 1921.
24 2-4-0T B Stoke works 18861458145811PJanuary 1934Rebuilt as 2-4-2T 1901.
23 2-4-0T B Stoke works November 18861445144511PJune 1928Renumbered 23A in 1922.
48 2-4-0T B Stoke works June 18871446144611PJune 1929Renumbered 48A in 1923. Under the LMS was transferred to the North London Railway for a period of time.
61 2-4-0T B Stoke works 18871459145911PAugust 1934Rebuilt as 2-4-2T 1900.
2 2-4-0T B Stoke works December 18901447144711PNovember 1930Renumbered 2A in 1923. Under the LMS was transferred to the North London Railway for a period of time.
1 2-4-0T B Stoke works April 18911448144811PNovember 1930Renumbered 1A in 1923.
10 2-4-0T B Stoke works December 189414491February 1928Renumbered 10A in 1923. Withdrawn before renumbered under 1928 scheme.
71 2-4-0T B Stoke works June 18941450145011POctober 1933Under the LMS was transferred to the North London Railway for a period of time.
7 2-4-0T B Stoke works June 189514511February 1928Under the LMS was transferred to the North London Railway for a period of time. Withdrawn before renumbered under 1928 scheme.
58 0-6-0ST ST Stoke works 188116001June 1927Renumbered 58A in 1899.
59 0-6-0ST ST Stoke works 18801601160111FNovember 1930Renumbered 59A in 1902.
54 2-4-0 C Stoke works 18821906Named John Bramley Moore after NSR deputy chairman at time of construction.
55 2-4-0 C Stoke works 18821911Named Colin Minton Campbell after NSR chairman at time of construction.
45 2-4-0 C Stoke works 18841911
46 2-4-0 C Stoke works 18841911
3 0-6-0T D Stoke works 18831550155022FSeptember 1930
20 0-6-0T D Stoke works 18831551155122FDecember 1931
33 0-6-0T D Stoke works 18831552155222FOctober 1929
36 0-6-0T D Stoke works 18831553155322FSeptember 1935
37 0-6-0T D Stoke works 18831554155422FOctober 1931
43 0-6-0T D Stoke works 18831555155522FOctober 1931
44 0-6-0T D Stoke works 18831556155622FNovember 1931
16 0-6-0T D Stoke works 18841557155722FAugust 1936
32 0-6-0T D Stoke works 18841558155822FJanuary 1929
34 0-6-0T D Stoke works 18841559155922FNovember 1930
60 0-6-0T D Stoke works 18841560156022FApril 1928
63 0-6-0T D Stoke works 18841561156122FSeptember 1929
49 0-6-0T D Stoke works June 18851562156222FFebruary 1931
62 0-6-0T D Stoke works November 18851563156322FSeptember 1929
124 0-6-0T D Stoke works June 18851564156422FJune 1932Renumbered 124A in 1904.
125 0-6-0T D Stoke works December 18851565156522FJanuary 1928Renumbered 125A in 1904.
126 0-6-0T D Stoke works June 18861566156622FDecember 1931
127 0-6-0T D Stoke works November 18861567156722FSeptember 1937
128 0-6-0T D Stoke works June 18871568156822FApril 1928
129 0-6-0T D Stoke works November 18871569156922FDecember 1931
57 0-6-0T D Stoke works October 18881570157022FDecember 1937
73 0-6-0T D Stoke works June 18881571157122FAugust 1929
50 0-6-0T D Stoke works October 18891572157222FDecember 1931
56 0-6-0T D Stoke works May 18891573157322FMay 1929
47 0-6-0T D Stoke works March 18901574157422FJune 1929
130 0-6-0T D Stoke works June 18911575157522FAugust 1929
131 0-6-0T D Stoke works October 18911576157622FDecember 1936
132 0-6-0T D Stoke works December 18911577157722FJune 1929
133 0-6-0T D Stoke works March 18921578157822FJanuary 1930
134 0-6-0T D Stoke works June 18921579157922FMay 1934
135 0-6-0T D Stoke works September 18921580158022FOctober 1931
136 0-6-0T D Stoke works December 18921581158122FSeptember 1928
137 0-6-0T D Stoke works March 18931582158222FJanuary 1929
138 0-6-0T D Stoke works June 18931583158322FAugust 1936
139 0-6-0T D Stoke works September 18931584158422FJune 1934
140 0-6-0T D Stoke works December 18931585158522FNovember 1930
141 0-6-0T D Stoke works March 18941586158622FOctober 1931
142 0-6-0T D Stoke works September 18941587158722FJanuary 1929
143 0-6-0T D Stoke works March 189515882November 1927
144 0-6-0T D Stoke works October 18951589158922FSeptember 1935
145 0-6-0T D Stoke works December 18951590159022FDecember 1930
146 0-6-0T D Stoke works March 18961591159122FApril 1932
147 0-6-0T D Stoke works June 18961592159222FAugust 1931
148 0-6-0T D Stoke works December 18961593159322FDecember 1931
149 0-6-0T D Stoke works May 18971594159422FMarch 1930
150 0-6-0T D Stoke works September 18971595159522FJune 1932
151 0-6-0T D Stoke works March 18981596159622FApril 1932
152 0-6-0T D Stoke works October 18981597159722FAugust 1936
153 0-6-0T D Stoke works April 18991598159822FOctober 1929
100 0-6-0 100 Stoke works October 18962347866922FSeptember 1931
101 0-6-0 100 Stoke works March 18972348867022FDecember 1928
102 0-6-0 100 Stoke works November 18972349867122FApril 1929
103 0-6-0 100 Stoke works June 18982350867222FDecember 1928
79 0-6-0 100 Stoke works December 18982344866622FSeptember 1929
78 0-6-0 100 Stoke works July 18992346866822FSeptember 1931
81 0-6-0 100 Stoke works October 18992343866522FDecember 1928
80 0-6-0 100 Stoke works July 19002345866722FApril 1929
82 0-6-0 New 100 Stoke works June 19072357867922FSeptember 1929
83 0-6-0 New 100 Stoke works June 19072358868022FDecember 1928
58 0-6-2T DX Stoke works December 18992234223422FNovember 1929
154 0-6-2T DX Stoke works March 19002235223522FMarch 1929
155 0-6-2T DX Stoke works December 19002236223622FJuly 1929
156 0-6-2T DX Stoke works May 19022238223822FSeptember 1931
157 0-6-2T DX Stoke works December 190222392November 1927
158 0-6-2T DX Stoke works September 19022237223722FJune 1929
114A 0-6-0 Special DX Crewe works 513October 18611913Purchased April 1900 from LNWR. Previously LNWR 3496.
115A 0-6-0 Special DX Crewe works 1261April 18691915Purchased April 1900 from LNWR. Previously LNWR 3404.
116A 0-6-0 Special DX Crewe works 431March 18601914Purchased May 1900 from LNWR. Previously LNWR 3399.
117A 0-6-0 Special DX Crewe works 569August 18621914Purchased May 1900 from LNWR. Previously LNWR 3402.
159 0-6-0 159 Nasmyth Wilson 588December 19002351867322FOctober 1936
160 0-6-0 159 Nasmyth Wilson 589December 19002352867422FNovember 1933
161 0-6-0 159 Nasmyth Wilson 590December 19002353867522FFebruary 1936
162 0-6-0 159 Nasmyth Wilson 591December 19002354867622FAugust 1929
163 0-6-0 159 Nasmyth Wilson 592December 19002355867722FSeptember 1936
164 0-6-0 159 Nasmyth Wilson 593December 19002356867822FMarch 1934
165 0-6-2T L Vulcan Foundry 1891December 19032242224233FAugust 1935
166 0-6-2T L Vulcan Foundry 1892December 19032243224333FJanuary 1933
167 0-6-2T L Vulcan Foundry 1893December 19032244224433FMay 1935
168 0-6-2T L Vulcan Foundry 1894December 19032245224533FAugust 1934
169 0-6-2T L Vulcan Foundry 1895November 19032241224133FFebruary 1936Renumbered 125 in 1904.
170 0-6-2T L Vulcan Foundry 1896November 19032240224033FSeptember 1935Renumbered 124 in 1904.
R.M.1 0-2-2T Railmotor Beyer, Peacock and Company 4643June 1905June 1927Not allocated LMS number or power classification.
R.M.2 0-2-2T Railmotor Beyer, Peacock and Company 4644June 1905June 1927Not allocated LMS number or power classification.
R.M.3 0-2-2T Railmotor Beyer, Peacock and Company 4793December 1905June 1927Not allocated LMS number or power classification.
19 2-4-0 19 Stoke works July 19051920
15 2-4-0 19 Stoke works June 19061920
54 2-4-0 19 Stoke works 19061920Last 2-4-0 built for a standard gauge railway in England. [4]
9 0-4-4T M Stoke works December 19071431143133PJanuary 1936
11 0-4-4T M Stoke works December 19071432143233POctober 1935
12 0-4-4T M Stoke works January 19081433143333POctober 1935
41 0-4-4T M Stoke works March 19081434143433PMarch 1939
42 0-4-4T M Stoke works March 19081435143533PAugust 1930
98 0-6-2T New L Stoke works December 19082246224633FMay 1936
99 0-6-2T New L Stoke works December 19082247224733FFebruary 1928
156 0-6-2T New L Stoke works November 19082248224833FJune 1937
157 0-6-2T New L Stoke works November 19082249224933FMarch 1936
93 0-6-2T New L Stoke works June 19092250225033FJuly 1934
94 0-6-2T New L Stoke works June 19092251225133FJuly 1936
95 0-6-2T New L Stoke works June 19092252225233FApril 1934
158 0-6-2T New L Stoke works June 19092253225333FMarch 1936Sold to the Longmoor Military Railway.
51 0-6-2T New L Stoke works April 19132254225433FApril 1934
64 0-6-2T New L Stoke works November 19132255225533FMay 1936
65 0-6-2T New L Stoke works November 19132256225633FMay 1935
69 0-6-2T New L Stoke works November 19132257225733FMay 1937Sold to Manchester Collieries
89 0-6-2T New L Stoke works November 19132258225833FJune 1934
96 0-6-2T New L Stoke works May 19132259225933FOctober 1936
97 0-6-2T New L Stoke works May 19132260226033FJune 1934
172 0-6-2T New L Stoke works June 19132261226133FFebruary 1937
72 0-6-2T New L Stoke works 19202262226233FJanuary 1937Sold to Manchester Collieries
18 0-6-2T New L Stoke works 19212263226333FOctober 1936
22 0-6-2T New L Stoke works 19212264226433FJune 1936Sold to Manchester Collieries
25 0-6-2T New L Stoke works 19212265226533FJuly 1936
26 0-6-2T New L Stoke works 19212266226633FDecember 1936
29 0-6-2T New L Stoke works 19212267226733FApril 1935
27 0-6-2T New L Stoke works 19222268226833FJanuary 1936
28 0-6-2T New L Stoke works 19222269226933FDecember 1934Came into service after grouping.
1 0-6-2T New L Stoke works 19232270227033FOctober 1937Came into service after grouping. Sold to Manchester Collieries.
2 0-6-2T New L Stoke works 19232271227133FOctober 1937See notes section below [lower-alpha 1]
10 0-6-2T New L Stoke works 19232272227233FJuly 1935Came into service after grouping.
48 0-6-2T New L Stoke works 19232273227333FFebruary 1937Came into service after grouping.
84 0-6-0 H Stoke works December 19092359868133FJanuary 1930
85 0-6-0 H Stoke works December 19092360868233FMay 1929
88 0-6-0 H Stoke works December 19092361868333FMay 1928
169 0-6-0 H Stoke works December 19092362868433FNovember 1928
86 4-4-0 G Stoke works June 1910595541033PApril 1929
170 4-4-0 G Stoke works June 1910597541233PDecember 1928
171 4-4-0 G Stoke works July 1910598541333PMay 1933
87 4-4-0 G Stoke works July 1910596541133PJune 1929
6 0-6-0 H1 Stoke works December 19102363868533FJanuary 1929
90 0-6-0 H1 Stoke works December 19102364868633FDecember 1929
91 0-6-0 H1 Stoke works February 19112365868733FJanuary 1930
92 0-6-0 H1 Stoke works March 19112366868833FOctober 1930
8 4-4-2T K Stoke works November 19112180218033PDecember 1933
45 4-4-2T K Stoke works November 19112181218133PJanuary 1934
46 4-4-2T K Stoke works December 19112182218233PJanuary 1934
55 4-4-2T K Stoke works December 19112183218333PDecember 1933
13 4-4-2T K Stoke works June 19122184218433PMay 1935
14 4-4-2T K Stoke works June 19122185218533PDecember 1933
39 4-4-2T K Stoke works September 19122186218633PDecember 1933
38 4-4-0 KT Stoke works October 1912599541433PAugust 1928
30 0-6-4T New C Stoke works July 19142040204055FApril 1934
31 0-6-4T New C Stoke works July 19142041204155FMarch 1935
53 0-6-4T New C Stoke works August 19142042204255FMay 1935
70 0-6-4T New C Stoke works September 19142043204355FOctober 1935
173 0-6-4T New C Stoke works December 19142044204455FMarch 1936
174 0-6-4T New C Stoke works December 19142045204555FMay 1934
4 0-6-4T New C Stoke works April 19152046204655FNovember 1937
5 0-6-4T New C Stoke works April 19152047204755FMarch 1934
114 0-6-4T New F Stoke works October 19162048204844PJuly 1934
116 0-6-4T New F Stoke works October 19162050205044PFebruary 1935
117 0-6-4T New F Stoke works December 19162051205144PNovember 1935
115 0-6-4T New F Stoke works February 19172049204944PJuly 1934
118 0-6-4T New F Stoke works 19182052205244POctober 1936
119 0-6-4T New F Stoke works 19182053205344PApril 1935
120 0-6-4T New F Stoke works 19192054205444PJanuary 1936
121 0-6-4T New F Stoke works 19192055205544PAugust 1934
1 Bo Battery Electric Stoke works 1917March 1963See notes section below [lower-alpha 2]
74 0-6-0T KS Kerr, Stuart and Company 407919191602160211FOctober 1932
75 0-6-0T KS Kerr, Stuart and Company 408019191603160311FApril 1933
15 0-4-4T New M Stoke works 19201436143633PApril 1939Last NSR engine in capital stock to be withdrawn. [8]
17 0-4-4T New M Stoke works 19201437143733PJuly 1935
19 0-4-4T New M Stoke works 19201438143833PJanuary 1936
54 0-4-4T New M Stoke works 19201439143933P1931
23 0-6-0T 4 Cylinder D Stoke works 19222367868933PDecember 1928Originally allocated LMS number 1599 but rebuilt as 0-6-0 and renumbered 2367

Engines renumbered with "A" as a suffix to the number were said to be on the duplicate list. The duplicate list comprised engines coming towards the end of their working lives and allowed the numbers to be freed up for use by new stock and in many cases to allow classes of new engines to be numbered in consecutive series.

Preservation

North Staffordshire steam loco No. 2 North Stafford 0-6-2.jpg
North Staffordshire steam loco No. 2
North Staffordshire battery loco No. 1 Battery Locomotive, North Staffordshire Railway.jpg
North Staffordshire battery loco No. 1

Two NSR locomotives are preserved. NSR No. 2, an 0-6-2T New L class (one of the four constructed in 1923) and the battery electric locomotive. Both formed part of the national collection at the National Railway Museum [9] but in 2016 ownership of the New L class locomotive was transferred to the Foxfield Railway where the locomotive is now on display. [10]

Notes

  1. Came into service after grouping. Sold to Manchester Collieries. Last NSR locomotive of any kind to remain in service, subsequently preserved as part of the National Railway Museum collection. From 2016 in the care of the Foxfield Railway Trust and in storage with a view to restoration at the Foxfield Railway. [5]
  2. Not allocated LMS number or power classification. Considered to be part of the departmental stock by the LMS. [6] Renumbered BEL 2 by British Railways. Last NSR locomotive of any kind to remain in service, now preserved as part of the National Railway Museum collection. [7]

Narrow gauge locomotives

Number
[2] [3]
Name
[2] [3]
Wheel arrangement
[2] [3]
Gauge
[2] [3]
Builder
[2] [3]
Builder no
[2] [3]
Built
[2] [3]
Withdrawn
[2] [3]
Notes [3]
Frog 0-4-0ST 3 ft 6 in (1,067 mm) H. Hughes & Co 1877May 1936Operated the tramway at Caldon Low Quarries, the quarries were owned by the NSR.
Toad 0-4-0ST 3 ft 6 in (1,067 mm) H. Hughes & Co 1877May 1936Operated the tramway at Caldon Low Quarries.
Bobs 0-4-0ST 3 ft 6 in (1,067 mm) W. G. Bagnall August 1901May 1936Operated the tramway at Caldon Low Quarries.
1 E. R. Calthrop 2-6-4T 2 ft 6 in (762 mm) Kitson and Company 4258June 1904December 1936Built for the Leek and Manifold Valley Light Railway operated by the NSR. E. R. Calthrop was the engineer of the line. First locomotives of this wheel arrangement to run in Britain. [11]
2 J. B. Earle 2-6-4T 2 ft 6 in (762 mm) Kitson and Company 4257May 1904February 1935Built for the Leek and Manifold Valley Light Railway. J. B. Earle was the resident engineer of the line.

Related Research Articles

<span class="mw-page-title-main">North Staffordshire Railway</span> Former British railway company

The North Staffordshire Railway (NSR) was a British railway company formed in 1845 to promote a number of lines in the Staffordshire Potteries and surrounding areas in Staffordshire, Cheshire, Derbyshire and Shropshire.

The London, Midland and Scottish Railway had the largest stock of steam locomotives of any of the 'Big Four' Grouping, i.e. pre-Nationalisation railway companies in the UK. Despite early troubles arising from factions within the new company, the LMS went on to build some very successful designs; many lasted until the end of steam traction on British Railways in 1968. For an explanation of numbering and classification, see British Rail locomotive and multiple unit numbering and classification.

David Jenkinson was a railway modeller and historian, who had a particular interest in the London, Midland and Scottish Railway (LMS) and was president of the LMS Society.

Robert John "Bob" Essery was a British railway modeller and historian with a particular interest in the London Midland and Scottish Railway (LMS) and one of its principal constituents, the Midland Railway (MR).

<span class="mw-page-title-main">LMS Stanier Class 2 0-4-4T</span>

The London, Midland and Scottish Railway (LMS) Stanier Class 2 0-4-4T was a class of 10 light passenger locomotives built in 1932. Ostensibly designed under new Chief Mechanical Engineer (CME) William Stanier, they were in fact the last new design of the Midland Railway's school of engineering.

<span class="mw-page-title-main">Foxfield Railway</span> Railway near Stoke-on-Trent, Staffordshire, England

The Foxfield Railway is a preserved standard gauge line located south east of Stoke-on-Trent. The line was built in 1893 to serve the colliery at Dilhorne on the Cheadle Coalfield. It joined the North Staffordshire Railway line near Blythe Bridge. It is open at weekends and operates trains on Sundays, Bank Holidays and some Saturdays from April to October and Santa Special trains in December. It is home to the Knotty Coach Trust, the Foxfield Miniature Railway, a museum, café, bar and a shop.

<span class="mw-page-title-main">LT&SR 79 Class</span>

The London, Tilbury and Southend Railway (LTSR) 79 Class is a class of 4-4-2T suburban tank engines. They were designed by Thomas Whitelegg, as a development of the earlier 37 Class. They could reach a top speed of 65 mph.

<span class="mw-page-title-main">LT&SR 51 Class</span>

The London, Tilbury and Southend Railway 51 class was a class of 4-4-2T steam locomotives. Twelve were built by Sharp, Stewart and Company to the design of Thomas Whitelegg for the London, Tilbury and Southend Railway in 1900, with North British Locomotive Company supplying an additional six in 1903. The LTSR numbered them 51–68, and named them places in London and Essex.

<span class="mw-page-title-main">LT&SR 69 Class</span>

The LT&SR 69 class was a class of 0-6-2T steam locomotives designed for freight work on the London, Tilbury and Southend Railway. Six were initially built in 1903 to the design of Thomas Whitelegg, four more followed in 1908, and a further four in 1912, after the LT&SR's takeover by the Midland Railway (MR) in that year, giving a total of 14. The Midland renumbered them 2180–2193, and all entered LMS stock upon the grouping of 1923. The LMS renumbered them 2220–2233 in 1923, but then took them back to 2180–2193 in 1939. In 1947 they were again renumbered 1980–1993 by the LMS, and in 1948 all were acquired by British Railways. BR added 40000 to their numbers so they became 41980–41993. Withdrawals started in 1958, and by 1959 all but 41981 had gone. The last engine was withdrawn in 1962, and none of the small fleet were preserved.

The LT&SR 49 class was a class of 0-6-0 steam locomotives. They were the only tender engines used by the London, Tilbury and Southend Railway. They were originally ordered by the Ottoman Railway in Turkey, however that order was cancelled after they had been built and instead they were sold to the LT&SR in 1898. The LT&SR numbered them 49 and 50.

<span class="mw-page-title-main">LNWR Class G2</span>

The London and North Western Railway (LNWR) Class G2 is a class of 0-8-0 steam locomotives. 60 were built at Crewe Works in 1921–1922. Uniquely amongst classes of LNWR 8-coupled tender engines, they were not rebuilt from or into other classes. Somewhat confusingly, the LNWR Class G2a is sometimes considered a subclass, but not in this article. They were classified by the London, Midland and Scottish Railway (LMS) as 5, from 1928 7F.

<span class="mw-page-title-main">Bromshall railway station</span> Disused railway station in England

Bromshall railway station was a short lived railway station in Staffordshire, England.

<span class="mw-page-title-main">Great Haywood railway station</span> Former railway station in Staffordshire, England

Great Haywood railway station is a disused railway station in Staffordshire, England.

<span class="mw-page-title-main">Hixon railway station</span> Former railway station in Staffordshire, England

Hixon railway station is a disused railway station in Staffordshire, England.

<span class="mw-page-title-main">Colwich railway station</span> Former railway station in Staffordshire, England

Colwich railway station is a disused railway station in Colwich, Staffordshire, England. The former station is adjacent to Colwich Junction, where the Trent Valley Line to Stafford and the cut-off line to Stoke-on-Trent diverge.

<span class="mw-page-title-main">NSR New L Class</span>

The North Staffordshire Railway (NSR) New L Class was a class of 0-6-2T steam locomotives designed by John H. Adams, third son of William Adams. They were designed as a development as the previous L Class, adding a boiler common to the M Class and differed from the L Class with, amongst other things higher bunker sides and new cab roofs, and the abandonment of the cast safety valve cover. 28 were built between 1908 and 1923, with the final four constructed under the auspices of the newly formed LMS with the whole class withdrawn by the end of 1937. There is one survivor.

<span class="mw-page-title-main">NSR M Class</span>

The North Staffordshire Railway (NSR) M Class was a class of 0-4-4T steam locomotive designed by John H. Adams, third son of William Adams. It was designed for suburban passenger work on the potteries loop lines. They shared components such as a drumhead smokebox which rested on the saddle and an almost identical boiler with the NSR L class. The boiler of the M class later became a standard boiler for the NSR, it being used on the NSR's New L class and H class. The M class introduced a new form of cab roof which curved around to join the cab sides, as with the Midland Railway at the time, and was soon copied by the SE&CR. Five were built between 1907 and 1908 at the NSR's Stoke Works and withdrawals taking place between 1930 and 1939. None survived into preservation.

The North Staffordshire Railway (NSR) H1 Class was a class of 0-6-0 steam locomotive designed by John H. Adams, third son of William Adams. They were designed as a development as the previous H Class, adding a Belpaire firebox to a new design of boiler, which was similar to that of the NSR G class but with a reduced barrel length. Four were built between December 1910 and March 1911, all at the company's Stoke railway works. The whole class was withdrawn by the end of 1930, having quickly been displaced by the LMS 4F.

The North Staffordshire Railway (NSR) H Class was a class of 0-6-0 steam locomotive designed by John H. Adams, third son of William Adams. They were designed to replace aging 0-6-0 locomotives on NSR long distance goods and coal trains both on and off the NR network thanks to the NSR's extensive running powers. Four were built in December 1909 all at the company's Stoke railway works. The whole class was withdrawn by the beginning of 1930, owing to the small nature of the class. This small class was supplemented by an additional modified four, designated H1 class.

<span class="mw-page-title-main">NSR G class</span> Steam locomotive class

The North Staffordshire Railway (NSR) G Class was a class of 4-4-0 steam locomotives designed by John H. Adams, third son of William Adams. The G Class was the first 4-4-0 class of locomotive designed for the NSR, and they superseded older 2-4-0s on the heaviest passenger traffic expresses on the railway between Crewe and Llandudno non-stop. The NSR introduced bogie stock to this route in 1906, resulting in much heavier trains.

References

Notes

  1. Christiansen & Miller 1971, p. 262.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Hopkins 1986.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Christiansen & Miller 1971.
  4. Hopkins 1986, p. 54.
  5. "NSR New L No 2". 25 April 2016. Retrieved 28 April 2016.
  6. Essery & Jenkinson 1981, p. 3.
  7. "NSR Battery Locomotive". National Railway Museum. Retrieved 19 June 2011.
  8. Essery & Jenkinson 1985, p. 148.
  9. "NRM Collections: Locomotives". York: National Railway Museum. 2009. Retrieved 13 May 2009.
  10. "NSR New L No 2". 25 April 2016. Retrieved 28 April 2016.
  11. Hopkins 1986, p. 83.

Sources