Lost circulation

Last updated

In oil or gas well drilling, lost circulation [1] [2] [3] occurs when drilling fluid, known commonly as "mud", flows into one or more geological formations instead of returning up the annulus. Lost circulation can be a serious problem during the drilling of an oil well or gas well.

Contents

Consequences

The consequences of lost circulation can be as little as the loss of a few dollars of drilling fluid, or as disastrous as a blowout and loss of life, so close monitoring of tanks, pits, and flow from the well, to quickly assess and control lost circulation, is taught and practiced. If the amount of fluid in the wellbore drops due to lost circulation (or any other reason), hydrostatic pressure is reduced, which can allow a gas or fluid which is under a higher pressure than the reduced hydrostatic pressure to flow into the wellbore.

Another consequence of lost circulation is "dry drilling". Dry drilling occurs when fluid is completely lost from the well bore without drilling coming to a halt. The effects of dry drilling range from as minor as destroying a bit to as serious as major damage to the wellbore requiring a new well to be drilled. Dry drilling can also cause severe damage to the drill string, including snapping the pipe, or damage to the drilling rig itself.

Categories

Lost circulation can be divided into the following categories: [4]

Control

Although preferred, stopping lost circulation completely is not always possible or required. Controlled losses allow drilling to continue while keeping the wellbore full, preventing an influx of gas or fluid into the wellbore, known as a "kick", which can lead to a blowout. [4]

A number of options are available when lost circulation occurs, depending on the severity. [4] Losses may be controlled by increasing the viscosity of the fluid with bentonite and/or polymers, or with the addition of other additives, which typically include organic plant matter. Total losses can be regained through conventional use of increased viscosity and additives, or through use of unconventional methods such as pumping of large organic particles (like kenaf), paper, and large mica flakes with a high viscosity fluid. If total losses occur and circulation cannot be regained, several options are available, depending on the operational requirements and depth being drilled in relation to desired production geological zones. Continuing drilling while pumping drilling fluid is one option, though continued drilling while pumping water is less costly and more often used. Sometimes the cuttings from continued drilling will aid in reducing leaks or stop losses altogether. A third option is to cement the zone where the losses occur, and to drill through the cement and continue drilling the well. This third option is very often the most cost effective if severe losses occur, as lost circulation sometimes cannot be controlled with other methods. [4]

Additives

Additive considerations

Several factors are considered in what additives are used:

Related Research Articles

Guar gum Vegetable gum from the guar bean, Cyamopsis tetragonoloba

Guar gum, also called guaran, is a galactomannan polysaccharide extracted from guar beans that has thickening and stabilizing properties useful in food, feed, and industrial applications. The guar seeds are mechanically dehusked, hydrated, milled and screened according to application. It is typically produced as a free-flowing, off-white powder.

Oil well Well drilled to recover hydrocarbons

An oil well is a boring in the Earth that is designed to bring petroleum oil hydrocarbons to the surface. Usually some natural gas is released as associated petroleum gas along with the oil. A well that is designed to produce only gas may be termed a gas well. Wells are created by drilling down into an oil or gas reserve that is then mounted with an extraction device such as a pumpjack which allows extraction from the reserve. Creating the wells can be an expensive process, costing at least hundreds of thousands of dollars, and costing much more when in hard to reach areas, i.e. when creating offshore oil platforms. The process of modern drilling for wells first started in the 19th century, but was made more efficient with advances to oil drilling rigs during the 20th century.

Mixing (process engineering) Process of mechanically stirring a heterogeneous mixture to homogenize it

In industrial process engineering, mixing is a unit operation that involves manipulation of a heterogeneous physical system with the intent to make it more homogeneous. Familiar examples include pumping of the water in a swimming pool to homogenize the water temperature, and the stirring of pancake batter to eliminate lumps (deagglomeration).

A supercritical fluid (SCF) is any substance at a temperature and pressure above its critical point, where distinct liquid and gas phases do not exist, but below the pressure required to compress it into a solid. It can effuse through porous solids like a gas, overcoming the mass transfer limitations that slow liquid transport through such materials. SCF are much superior to gases in their ability to dissolve materials like liquids or solids. In addition, close to the critical point, small changes in pressure or temperature result in large changes in density, allowing many properties of a supercritical fluid to be "fine-tuned".

A mud engineer works on an oil well or gas well drilling rig, and is responsible for ensuring the properties of the drilling fluid, also known as drilling mud, are within designed specifications.

Well control is the technique used in oil and gas operations such as drilling, well workover and well completion for maintaining the hydrostatic pressure and formation pressure to prevent the influx of formation fluids into the wellbore. This technique involves the estimation of formation fluid pressures, the strength of the subsurface formations and the use of casing and mud density to offset those pressures in a predictable fashion. Understanding pressure and pressure relationships is important in well control.

Drilling fluid Aid for drilling boreholes into the ground

In geotechnical engineering, drilling fluid, also called drilling mud, is used to aid the drilling of boreholes into the earth. Often used while drilling oil and natural gas wells and on exploration drilling rigs, drilling fluids are also used for much simpler boreholes, such as water wells. One of the functions of drilling mud is to carry cuttings out of the hole.

Blowout (well drilling) Uncontrolled release of crude oil and/or natural gas from a well

A blowout is the uncontrolled release of crude oil and/or natural gas from an oil well or gas well after pressure control systems have failed. Modern wells have blowout preventers intended to prevent such an occurrence. An accidental spark during a blowout can lead to a catastrophic oil or gas fire.

Multiphase flow

In fluid mechanics, multiphase flow is the simultaneous flow of materials with two or more thermodynamic phases. Virtually all processing technologies from cavitating pumps and turbines to paper-making and the construction of plastics involve some form of multiphase flow. It is also prevalent in many natural phenomena.

Underbalanced drilling, or UBD, is a procedure used to drill oil and gas wells where the pressure in the wellbore is kept lower than the static pressure of the formation being drilled. As the well is being drilled, formation fluid flows into the wellbore and up to the surface. This is the opposite of the usual situation, where the wellbore is kept at a pressure above the formation to prevent formation fluid entering the well. In such a conventional "overbalanced" well, the invasion of fluid is considered a kick, and if the well is not shut-in it can lead to a blowout, a dangerous situation. In underbalanced drilling, however, there is a "rotating head" at the surface - essentially a seal that diverts produced fluids to a separator while allowing the drill string to continue rotating.

Differential sticking

Differential sticking is a problem that occurs when drilling a well with a greater well bore pressure than formation pressure, as is usually the case. The drill pipe is pressed against the wellbore wall so that part of its circumference will see only reservoir pressure, while the rest will continue to be pushed by wellbore pressure. As a result, the pipe becomes stuck to the wall, and can require millions of pounds of force to remove, which may prove impossible. In many cases the drilling fluid (mud) weight is reduced, thus relieving the pressure difference and releasing the stuck pipe string. Should this option be unavailable, as in sour gas wells, a specialty fishing company is called to retrieve the stuck pipe or 'fish'. Many options exist once a fishing company is on site: oil or nitrogen may be pumped down the well, or the fish may be 'washed over' using a carbide shoe on a string of washpipe. Jarring is not usually attempted with differential sticking due to the massive amount of pressure that holds the pipe in place.

A well kill is the operation of placing a column of heavy fluid into a well bore in order to prevent the flow of reservoir fluids without the need for pressure control equipment at the surface. It works on the principle that the hydrostatic head of the "kill fluid" or "kill mud" will be enough to suppress the pressure of the formation fluids. Well kills may be planned in the case of advanced interventions such as workovers, or be contingency operations. The situation calling for a well kill will dictate the method taken.

Completion (oil and gas wells) Last operation for oil and gas wells

Well completion is the process of making a well ready for production after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as required. Sometimes, the process of running in and cementing the casing is also included. After a well has been drilled, should the drilling fluids be removed, the well would eventually close in upon itself. Casing ensures that this will not happen while also protecting the wellstream from outside incumbents, like water or sand.

Oil additives are chemical compounds that improve the lubricant performance of base oil. The manufacturer of many different oils can utilize the same base stock for each formulation and can choose different additives for each specific application. Additives comprise up to 5% by weight of some oils.

Annular velocity is the speed of a fluid's movement in a column called an annulus in wells being drilled with circulating drilling fluid. It is commonly measured in feet per minute (ft/min) or meters per minute (m/min). Annular velocity is often abbreviated as AV, though this is not exclusively so, as AV also refers to apparent viscosity which is calculated from rheometer readings from tests that the mud engineer performs.

Oilfield terminology refers to the jargon used by those working in fields within and related to the upstream segment of the petroleum industry. It includes words and phrases describing professions, equipment, and procedures specific to the industry. It may also include slang terms used by oilfield workers to describe the same.

Oil Well Cementing Equipment are essential for the Oil/Gas exploration or production wells and are must used oilfield equipments while drilling a well.

Cameron ram-type blowout preventer

The Cameron ram-type blowout preventer was the first successful blowout preventer (BOP) for oil wells. It was developed by James S. Abercrombie and Harry S. Cameron in 1922. The device was issued U.S. Patent 1,569,247 on January 12, 1926. The blowout preventer was designated as a Mechanical Engineering Landmark in 2003.

Oil well control is the management of the dangerous effects caused by the unexpected release of formation fluid, such as natural gas and/or crude oil, upon surface equipment of oil or gas drilling rigs and escaping into the atmosphere. Technically, oil well control involves preventing the formation gas or fluid (hydrocarbons), usually referred to as kick, from entering into the wellbore during drilling or well interventions.

Hydraulic fracturing Well stimulation technique in which rock is fractured by a hydraulically pressurized liquid

Hydraulic fracturing, also called fracking, fracing, hydrofracking, fraccing, frac'ing, and hydrofracturing, is a well stimulation technique involving the fracturing of bedrock formations by a pressurized liquid. The process involves the high-pressure injection of "fracking fluid" into a wellbore to create cracks in the deep-rock formations through which natural gas, petroleum, and brine will flow more freely. When the hydraulic pressure is removed from the well, small grains of hydraulic fracturing proppants hold the fractures open.

References

  1. Petroleum Engineering Handbook, Volume II: Drilling Engineering. Society of Petroleum Engineers. 2007. pp. 100–101. ISBN   978-1-55563-114-7.
  2. Drilling engineering. Heriot watt university. 2005. pp. 214–215.
  3. Rabia, Hussain (1986). Oilwell Drilling Engineering : Principles and Practice. Springer. pp. 284–287. ISBN   0860106616.
  4. 1 2 3 4 Rabia, Hussain (2002). Well Engineering and Constructions. London: Entrac Consulting Limited. pp. 505–508. ISBN   0954108701.