Mitsubishi Heavy Industries Crystal Mover C810A

Last updated
Mitsubishi Heavy Industries Crystal Mover C810A
C810A Trainset 47.jpg
A C810A train, January 2020
Interior of C810A.jpg
Interior Design of C810A
In service5 April 2016;7 years ago (2016-04-05) – Present
Manufacturer Mitsubishi Heavy Industries
Built at Mihara, Hiroshima, Japan
Family name Crystal Mover
Constructed2012 – 2016
Entered service5 April 2016;7 years ago (2016-04-05)
Number built16 vehicles
Number in service16 vehicles
FormationSingle vehicles (M) that can be coupled to form 2-car trains
Fleet numbers42 – 57
Capacity14 seated; 91 standing
Operator(s) SBS Transit Ltd (ComfortDelGro Corporation)
Depot(s) Sengkang
Line(s) served  SKLRT   Sengkang LRT line
  PGLRT   Punggol LRT line
Specifications
Car body construction Aluminum-alloy weighed
Car length11.84 m (38 ft 10+18 in)
Width2.69 m (8 ft 9+78 in)
Height3,615 mm (11 ft 10+38 in)
Doors2 × 2 per car
Maximum speed80 km/h (50 mph) (design)
70 km/h (43 mph) (service)
Weight14.9 t (14.7 long tons; 16.4 short tons) per car
Traction system Mitsubishi IGBTVVVF inverter vector control
Traction motors 2 × 80 kW (110 hp) 3-phase AC induction motor
Power output160 kW (210 hp)
Acceleration 1 m/s2 (3.3 ft/s2)
Deceleration 1 m/s2 (3.3 ft/s2) (service)
1.3 m/s2 (4.3 ft/s2) (emergency)
Electric system(s) 750 V DC   third rail
Current collector(s) Collector shoe
AAR wheel arrangement A-A
Braking system(s) Electric command pneumatic brake with regenerative brake with stand-by brake, parking brake (with variable load control and wheel slide prevention control)
Safety system(s)Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [1]
Coupling system BSI
Multiple working
  • Within type
  • With C810
Track gauge 1,850 mm (6 ft 2732 in)
Guideway span: 3.2 m (10 ft 6 in)

The Mitsubishi Heavy Industries Crystal Mover C810A is an automated people mover vehicle which serves the Sengkang LRT line and Punggol LRT line as the second generation train after their previous counterparts Mitsubishi Heavy Industries Crystal Mover C810. Two train sets commenced revenue service on 5 April 2016, with Set 43 and 44 running on the East and West loop of the Sengkang LRT line respectively. Since then, the rest of the fleet progressively entered service.

Contents

Train design

There is little difference between its older counterpart, the C810. However, its headlights are vertical instead of horizontal and luminously white instead of yellow installed on its predecessor. Its train number is underlined. [2]

Its interior design bear little difference compared to its older counterparts, one being that the LCD screen font is smaller and shows green messages (e.g.: Welcome to SBS Transit) instead of yellow-green in its older counterparts.

As the carriages are closed-end, the train must be stationary and the doors must be open for passengers to move between carriages during 2-car operations.

Train formation

The configuration of a C810A in revenue service is just the one car. With both the motors and the third rail current collectors, the train cars can be coupled up to 2 cars during service.

The car numbers of the trains range from 42 to 57. Individual cars are assigned a two-digit serial number by the rail operator SBS Transit. A trainset consists of one motor car, e.g. set 42 is car 42. Both digits identify the car number.

The serial numbers given are underlined, indicating they have the new signalling system.

Related Research Articles

<span class="mw-page-title-main">People mover</span> Fully automated transit systems, generally serving relatively small areas

A people mover or automated people mover (APM) is a type of small scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks.

<span class="mw-page-title-main">SBS Transit</span> Public transport operator in Singapore

SBS Transit Ltd is a multi-modal public transport operator in Singapore operating bus and rail services. With a majority of its shares owned by Singaporean multinational transport conglomerate ComfortDelGro Corporation at 75%, it was formerly known as Singapore Bus Services before rebranding to SBS Transit on 1 November 2001.

<span class="mw-page-title-main">Punggol LRT line</span> Light rail line in Singapore

The Punggol LRT is an automated guideway transit line in Singapore. The line, which initially opened on 29 January 2005, connects the residential districts and suburbs of Punggol to Punggol Town Centre, where it connects with the North East MRT line and the Punggol Bus Interchange. It is the third line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains.

<span class="mw-page-title-main">Sengkang LRT line</span> Light rail line in Singapore

The Sengkang LRT is a 10.7-kilometre (6.6 mi) automated guideway transit line in Singapore. The line, which initially opened on 18 January 2003, connects the residential districts and suburbs of Sengkang to Sengkang Town Centre, where it connects with the North East MRT line, Sengkang Bus Interchange, Compass One and Compassvale Bus Interchange. It is the second line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains. It is the first LRT line to be operated by SBS Transit.

<span class="mw-page-title-main">Light Rail Transit (Singapore)</span> Automated guideway transit systems in Singapore

The Light Rail Transit (LRT) is a series of localised automated guideway transit systems acting as feeder services to the heavy rail Mass Rapid Transit, which together forms the core of Singapore's rail transport services. The first LRT line was opened in 1999 and the system has since expanded to three lines, each serving a new town, namely Bukit Panjang LRT line, Sengkang LRT line and Punggol LRT line. Trains on these lines have at least one station interchange link to the MRT.

<span class="mw-page-title-main">Rail transport in Singapore</span> Overview of rail transport in Singapore

Rail transport in Singapore mainly consists of a passenger urban rail transit system spanning the entire city-state: a rapid transit system collectively known as the Mass Rapid Transit (MRT) system operated by the two biggest public transport operators SMRT Trains and SBS Transit, as well as several Light Rail Transit (LRT) rubber-tyred automated guideway transit lines also operated by both companies. In addition, local specialised light rail lines are in operation in places such as the Singapore Changi Airport and Sentosa.

<span class="mw-page-title-main">Innovia APM 100</span> Automated people mover manufactured by Bombardier

The Innovia APM 100 is an automated people mover (APM) rolling stock first developed by Westinghouse, intended mainly for airport connections and light rail in towns. They are operated by Automatic Train Control (ATC), making it fully automatic and driverless.

<span class="mw-page-title-main">Crystal Mover</span> Rubber-tired automated people mover system manufactured by Mitsubishi Heavy Industries

The Crystal Mover is a rubber-tired automated people mover (APM) system for airport and public transport applications manufactured at Mitsubishi Heavy Industries (MHI) Mihara Machinery Works in Mihara, Japan. The Crystal Mover, initially based on the Japanese APM standard, is used in automated guideway transit (AGT) systems in China, Japan, Singapore, South Korea, the United Arab Emirates and the United States.

<span class="mw-page-title-main">Riviera MRT/LRT station</span> Light rail station in Singapore

Riviera LRT station is an elevated Light Rail Transit (LRT) station in Punggol, Singapore. Serving the east loop of the Punggol LRT line (PGLRT), the station is along Punggol East between the junctions of Punggol Central and Punggol Field. Surrounding landmarks include Punggol Joint Temple and Punggol Promenade Riverside Park.

<span class="mw-page-title-main">Macau Light Rapid Transit</span> Mass transit system in Macau

The Macau Light Rapid Transit is a mass transit system in Macau and is also the first railway system in Macau. The first phase of the project started construction in February 2012, and the first section of the Taipa line was opened to the public on 10 December 2019. Currently, the Macau Light Rapid Transit is operated by MTR (Macau), a wholly-owned subsidiary of MTR.

<span class="mw-page-title-main">Changi Airport Skytrain</span> Automated people mover system in Singapore Changi Airport

The Changi Airport Skytrain is an automated people mover (APM) that connects Terminals 1, 2 and 3 at Singapore Changi Airport. Opened in 1990, it was the first driverless and automated system of its kind in South East Asia. The Changi Airport Skytrain operates from 05:00 to 02:30 daily. Traveling on the Skytrain is free and an inter-terminal journey takes approximately four minutes.

<span class="mw-page-title-main">Kawasaki Heavy Industries & CSR Qingdao Sifang C151B</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & CSR Qingdao Sifang C151B is the fifth generation electric multiple unit rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Kawasaki Heavy Industries (KHI) & CRRC Qingdao Sifang under Contract 151B. 45 trains were purchased and all of them have been delivered to Singapore as of 12 April 2017. SMRT took delivery of the first 2 train cars on 21 May 2015. These trains increased frequency for the two MRT lines, North–South and East–West lines. Majority of these trains operate on the North–South Line, with a few operating on the East–West Line.

<span class="mw-page-title-main">Bombardier Innovia APM 100 C801A</span> Class of electric multiple units in Singapore

The Bombardier Innovia APM 100 C801A is the second generation of an automated people mover (APM) train built by Bombardier Transportation for the Bukit Panjang LRT line. These trains are mainly for airport connections and light rail in towns and it is operated by Automatic Train Control (ATC), making it fully automatic and driverless. The use of rubber tyres and ceramic tracks are extremely quiet compared to conventional rail.

<span class="mw-page-title-main">Bombardier Innovia APM 100 C801</span> Class of electric multiple units in Singapore

The Bombardier Innovia APM 100 C801 is the first generation of an automated people mover (APM) train built by Adtranz for use on the Bukit Panjang LRT (BPLRT).

<span class="mw-page-title-main">Kawasaki Heavy Industries & CRRC Qingdao Sifang T251</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & CRRC Qingdao Sifang T251 is the first generation electric multiple unit rolling stock in operation on the Thomson–East Coast line of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract T251.

<span class="mw-page-title-main">Mitsubishi Heavy Industries Crystal Mover C810</span> Class of electric multiple units in Singapore

The Mitsubishi Heavy Industries Crystal Mover C810 is an automated people mover train that serves the Sengkang LRT line and Punggol LRT line in Singapore. The trains have been operating since 18 January 2003, with its first service on the Sengkang East Loop.

<span class="mw-page-title-main">Taipei Metro C381</span>

The Taipei Metro C381 is the fifth and the latest generation of heavy-capacity electric multiple units on the Taipei Metro in Taipei, Taiwan. They are designed to increase the capacity of the expanded network with the opening of the Xinyi and Songshan lines.

<span class="mw-page-title-main">Alstom Metropolis C851E</span> Class of electric multiple units in Singapore

The Alstom Metropolis C851E is the third generation electric multiple unit rolling stock introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East line trains and 23 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL. The contract, valued at S$249,854,305.00, was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot. Alstom is the sole bidder for this contract. An additional 12 3-car trains will be purchased for use on the Circle line, from 2024 onwards.

The Bombardier Innovia APM 300R C801B is the third generation of automated people mover (APM) trains built by CRRC Puzhen Alstom Transportation Systems for the Bukit Panjang LRT line, to replace the existing C801 trains built in 1999. The C801B trains are also the first of its kind to reuse the retro AC third rail shoes compared to the newer Light Rail lines around the world that utilises the APM 300 system that have been built with DC third rail instead of AC.

The Mitsubishi Heavy Industries Crystal Mover C810D is an automated people mover vehicle which serves the Sengkang LRT line and Punggol LRT line as the third generation train after their previous counterparts Mitsubishi Heavy Industries Crystal Mover C810 and Mitsubishi Heavy Industries Crystal Mover C810A.

References

  1. "Kyosan Corporate Report 2018". p. 19 to 20. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  2. "New LRT trains to undergo tests". The Straits Times. 27 November 2015. Archived from the original on 8 March 2016. Retrieved 8 February 2016.