Movimento dos Atingidos por Barragens

Last updated
Movement of People Affected by Dams (Movimento dos Atingidos por Barragens)
Headquarters São PauloBrasil
Website
http://www.mabnacional.org.br/english/english

The Movimento dos Atingidos por Barragens (Movement of People Affected by Dams) (MAB) is a Brazilian political organization (social movement) created in the end of the 1970s with the objective of organize and guide the people affected by the dams to pursuit their rights. [1] [2]

Contents

The Movement of People Affected by Dams has a long history of resistance, struggles and conquests. It emerged in the 1980s, through experiences of local and regional organization, facing threats and aggressions suffered in the implementation of hydroelectric projects. Later, it became a national organization and, today, in addition to fighting for the rights of those affected, it demands a Popular Energy Project to change all the unjust structures of this society from the roots. [1]

As an organization, the movement is the result of a long work of collective construction, fighting against injustices, the destruction of nature for the maintenance and protection of the way of life of the affected local communities (ethnic and social aspects). [1]

The movement is defined as a movement of national character, autonomous, mass, of struggle, with distinctions of different orders throughout its organization (race, gender, sexual orientation, religion, political party and level of education), with participation and collective protagonism at all levels. Its objective is to organize those affected by dams in Brazil, before, during or after the construction of the projects. It is organized to defend the interests of the populations affected by the generation, distribution and sale of electric energy. The movement's action is guided by principles and values that find in the pedagogy of example and in solidarity among peoples the best way to convince. [1]

Origin

The movement was created from the mobilization of farmers against the construction of hydroelectric plants in the region of Alto Uruguai, in the Brazilian states of Rio Grande do Sul and Santa Catarina. In 1979 when the first studies about the hydroelectric potential of the region were published, the catholic institution Comissão Pastoral da Terra (Pastoral committee for the land) organized the first meetings that ended in the creation of the Dam's committee (Comissão das Barragens), later renamed as Comissão Regional de Atingidos por Barragens (Regional committee of the affected by dams). In 1989 they organized their first national meeting in Goiânia. In March, 1991, the first national congress of affected by dams approved the formal foundation of MAB, their actual name. [2]

Political acting and Ideology

Among MAB claims are the creation of a national bill of rights for the affected by the dams. The movement defends the creation of a national fund of aid to minimize the damages caused against the people by the constructions. The organization is opposed to the Belo Monte Dam project and other similar projects in the Amazon basin. On March 15, 2012, members of MAB signed an agreement with the federal government foreseeing the creation of a chronogram for the resettlement of the signed families. Every year, the organization promotes the "international day of fight against the dams", celebrated by the members in March, 14.

Brumadinho disaster, an example of disregard for nature and society, a mineral tailings dam breaks causing the death of 270 people and environmental damage to rivers and local biological life Brumadinho By Diego Baravelli 08.jpg
Brumadinho disaster, an example of disregard for nature and society, a mineral tailings dam breaks causing the death of 270 people and environmental damage to rivers and local biological life

Brazilian social movements in the 20th century developed different training and education experiences for their members, as in the case of the Movement of People Affected by Dams (MAB). The Brazilian Communist Party played an important role in national syndicalism (1930s to 1960s), with the contents of political formation at the time referring to "official" Marxism, of Soviet origin. [3]

With the emergence of the "new Brazilian unionism" [4] and of new social movements from the 1970s onwards, Marxist influences and their variants were renewed, above all, in the sphere of intellectual training of the Brazilian popular classes, especially a new ideological matrix, influenced by the " Pedagogy of Autonomy" by Paulo Freire and by Liberation Theology, embodied by the experiences of "popular education" of the period. From the 1990s onwards, the "Movimento dos Sem Terra" (Landless worker's movement), the main organization of Via Campesina Brasil, began to develop its own agenda for the political formation of its members, distancing itself from its ideological bases based on anarchism and seeking to articulate with intellectuals of Marxist lineage. [3]

Defense of Human Rights

The history of the movement arises from the violations of the rights of populations affected by the construction of large dams for the production of electricity, as example, in the case of Itaipu Dam. Such affected populations usually have peasant origins, poor, with little access to the justice system in Brazil. According to the report by the National Human Rights Council, in the construction and operation of dams in Brazil, at least 16 fundamental rights of such populations are systematically violated. [5]

On 11/22/2010, the Council for the Defense of Human Rights, the official body of the Brazilian State in matters of human rights, published - after more than four years of analysis and field visits - a comprehensive report of the Special Commission in charge of investigating complaints about the situation of those "affected by dams in Brazil". Through case studies and analyzing the contextual and socio-environmental elements linked to the theme, the Special Commission (...) found a significant number of human rights violations in the process of construction/implementation of these dams. Finally, the Commission sent a set of recommendations to the Brazilian State in order to repair and/or mitigate the impacts, in addition to pointing out the need to build specific public policies for this population. This document is important not only because it identifies and systematizes complaints of human rights violations - pointing to the existence of a pattern of violations - but above all because it is an official document of the Brazilian State carried out with the effective and decisive participation of the civil society. Furthermore, it is a report published by one of Organs most representative bodies in terms of human rights in Brazil, recognizing this pattern and pointing out necessary compensation measures, which should be binding. [6]

Throughout its trajectory, the movement recognized the need to fight for the realization of the human rights of the affected populations, being one of its fundamental characteristics, the fight for the guarantee of rights. It was only through the struggles waged by those affected that rights such as collective resettlements, cash compensation, receipt of state aid in cash and the pursuit of equal treatment for men and women were made effective. [5]

Energy

Itaipu Dam - the second largest hydroelectric plant in the world, which caused the relocation of countless local communities during its construction Usina Hidroeletrica Itaipu Binacional - Itaipu Dam (17174796329).jpg
Itaipu Dam - the second largest hydroelectric plant in the world, which caused the relocation of countless local communities during its construction

One of the agendas of the movement is Brazil's national energy policy, which, in the understanding of this social movement, transforms energy into a mere commodity to guarantee the profitability of financial capital. They defend the perspective that "water and energy are not commodities" and, in this sense, they seek to build a popular energy project. [5]

The movement demands that the use of Brazil's water and energy resources be carried out with respect for national sovereignty, with the distribution of socially produced wealth and the need for popular control of government acts and energy policy. Until the beginning of the 1990s, the Brazilian national electricity sector was entirely owned by the State under a legal monopoly regime, with only a single state-owned company which carried out the production, transport and distribution of energy. In the 1990s, these public services were privatized and became private property, under the influence of neoliberalization processes that were taking place throughout Latin America. [5]

The Brazilian territory has one of the largest water potentials in the world, thus, the main source of energy in the country comes from hydroelectric plants, with low financial investment costs, compared to other forms of energy production. Even so, Brazil is among the 10 countries that pay the most expensive energy tariffs. In this sense, the movement emphasizes the need to change the technological matrix and to choose renewable energy sources. [5]

Water

The movement seeks recognition that access to clean water and energy are human rights and not just commodities Humanitarian aid OCPA-2005-10-28-090517a.jpg
The movement seeks recognition that access to clean water and energy are human rights and not just commodities

The movement understands that water is a basic human need and a fundamental human right and that it should not be commodified or become a commodity. Brazil has the largest freshwater reserve in the world, and we still have a favorable reality, with more than 90% of households being directly connected to water supply networks, most of them (90%) managed by the state and 10% of the control belongs to the private sector. [5] The movement understands that the guarantee of rights is privileged when public services are directly provided by the state and understands the provision of public services carried out by the private sector as negative. [5]

The movement understands that Brazil would be suffering an "attack" by transnational companies, which would be transforming the rights of the people into merchandise. In addition, in rural parts of Brazil, there is an increase in conflicts over access to water, with peasants who produce more than 70% of the food of the Brazilian population on the one hand, and agribusiness, which exports its production to the abroad and consumes 80% of Brazilian water, which, in the words of the movement, harming natural resources and violating the social rights of the population. One of the movement's mottos is "water is for life and not for death". They seek to question and face processes of privatization of water resources and to renationalize national assets that were privatized. [5]

Damns

The construction of dams in the national territory has repeatedly led to serious violations of human rights, the consequences of which end up accentuating serious social inequalities in Brazil, situations of misery, social disruption (family and individual) of the populations affected by the construction of dams. The negative consequences result from a national policy for the planning, implementation and operation of dams for electricity generation, water supply, accumulation of industrial waste and for multiple uses. The dams cause important social, environmental, economic and cultural impacts in a vast territory and produce hundreds of thousands of affected populations. [5] About the Brazilian electrical system:

Another aspect to be considered is the great pressure that climate change will produce on the most varied ecosystems, in practically all aspects of human life, flora, fauna and changes in hydrological cycles. In this mixed energy model, with private and public participation, the interests of the private sector will always prevail. The State, which should act as a theoretically "neutral" agent in the context of a market economy, ends up becoming more of an economic agent and allied to these groups – State policies become market policies. Thus, investments are public, profits are private and losses are social. The so-called pure private energy model, without state intervention, was not consolidated, with the Brazilian State remaining as a fundamental actor in the electricity sector and allied with economic groups. [7]

A serious example of a break with human rights was the dam failure in Brumadinho on January 25, 2019, which was the biggest work accident in Brazil in terms of loss of human life and the second biggest industrial disaster of the century. It was one of the biggest environmental disasters for mining in the country, after the dam collapsed in Mariana. Controlled by Vale Company, the tailings dam was classified as "low risk" and "high potential for damage" by the company. Accumulating the tailings of an iron mine, it was located in the "Ferro-Carvão" stream in the municipality of Brumadinho, state of Minas Gerais. The industrial disaster claimed the lives of 270 people, including six missing. The tragedy caused Brazil to become the country with the highest number of deaths in this type of accident, in addition to two other disasters with human losses or serious environmental damage: the rupture of the Herculano Mining Dam, in Itabirito (2014, with three deaths) and the rupture of the dam in Mariana (2015, with nineteen deaths). [8] [9] [10] [11]

The intensity, severity and extent of negative impacts caused by hydroelectric plants vary from case to case, according to regional characteristics, size of the plants, age of the dam, type of reservoir (water or industrial waste), ownership, construction and operation of the plant (companies state, mixed and private – national and international). [5]

According to the Dam Safety Report published in 2018 by the National Water Resources Agency, there are 17,604 dams registered in the 32 supervisory bodies of the Brazilian state, at the municipal, state and federal level. To date, around 5,086 dams have been classified by Risk Category and 6,577 dams by Associated Potential Damage, with 909 dams classified simultaneously as high Risk Category and Associated Potential Damage. Brazil has a large number of dams and the negative impacts associated with these projects are relevant, resulting from the lack of safety in dams and the pattern of violation of the rights of those affected. [5]

Amazon Rainforest

With the worsening of the crises (economic and climatic) in recent years, the Amazon has suffered more and more, with severe damage to its biodiversity and the lives of local communities. The context of intensive extraction of natural resources, deforestation, fires, as well as processes of privatization of local water resources. The current global economic model has reinforced the position of the Amazon as a source of cheap mineral and energy resources and the destruction of the forest and its transformation into a new agricultural frontier, for the export of commodities, carried out by transnational companies. [5]

Local populations, however, have had few benefits from globalization, only an increase in their misery and an increase in cases of violence, including neglect on the part of the Brazilian federal government. In this sense, the movement of those affected by dams seeks to build a development model for the Amazon in which the lives of local populations come first, privileging the distribution of wealth and its development without destroying nature and using natural resources. strategic resources for the general improvement of the population's living conditions. [5]

International action of the movement

The social movement estimates that more than 800,000 dams have already been built on the planet and that their reservoirs already cover about 1% of the planet's surface. [5]

At the same time, the number of people who have had to leave the place where they live due to the flooding of territories for the production of hydropower in the last 20 years is estimated at more than 40 million people, and most of these people are of indigenous origin. The consequences of the construction of dams appear over time: forest degradation, drastic reduction in fishing, emission of gases that contribute to the greenhouse effect and global warming, risks of earthquakes, climate change and biological death of water courses. [5]

In addition, the construction of dams is based on borrowing by local governments, causing the indebtedness of the economies of poor nations such as Brazil. As a result, MAB sought articulation at the international level with other similar institutions, through international meetings of those affected, and in Latin America, especially through the "Movimiento de Afectados por Represas (MAR), in Spanish. [5]

Related Research Articles

<span class="mw-page-title-main">Renewable energy in Brazil</span> Renewable energy in Brazil

As of 2018, renewable energy accounted for 79% of the domestically produced electricity used in Brazil.

<span class="mw-page-title-main">Belo Monte Dam</span> Dam in Pará, Brazil

The Belo Monte Dam is a hydroelectric dam complex on the northern part of the Xingu River in the state of Pará, Brazil. After its completion, with the installation of its 18th turbine, in November 2019, the installed capacity of the dam complex is 11,233 megawatts (MW), which makes it the second largest hydroelectric dam complex in Brazil and the fifth largest in the world by installed capacity, behind the Three Gorges Dam, Baihetan Dam and the Xiluodu Dam in China and the Brazilian-Paraguayan Itaipu Dam. Considering the oscillations of river flow, guaranteed minimum capacity generation from the Belo Monte Dam would measure 4,571 MW, 39% of its maximum capacity.

<span class="mw-page-title-main">Tucuruí Dam</span> Dam in Pará, Brazil

The Tucuruí Dam is a concrete gravity dam on the Tocantins River located on the Tucuruí County in the State of Pará, Brazil. The main purpose of the dam is hydroelectric power production and navigation. It is the first large-scale hydroelectric project in the Brazilian Amazon rainforest. The installed capacity of the 25-unit plant is 8,370 megawatts (11,220,000 hp). Phase I construction began in 1980 and ended in 1984 while Phase II began in 1998 and ended in 2010. The dam was featured in the 1985 film The Emerald Forest.

<span class="mw-page-title-main">Cotingo River</span> River in Brazil

The Cotingo River is a river of Roraima state in northern Brazil, a tributary of the Surumu River. It flows through the Raposa Serra do Sol indigenous territory. For many years there has been discussion over building a major hydroelectric power project on the river.

<span class="mw-page-title-main">Jirau Dam</span> Dam in Rondônia, Brazil

The Jirau Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Madeira River in the state of Rondônia, Brazil. The dam's hydroelectric power stations will have 50 turbines each 75 MW resulting total installed capacity of 3,750 MW. The power plant's first unit was commissioned in September 2013, the 16th in November 2014, 24th in February 2015, the 41st in December 2015, and the last in December 2016. Most of the power is designed to be exported to south-eastern Brazil via the Rio Madeira HVDC system.

<span class="mw-page-title-main">Santo Antônio Dam</span> Dam in Rondônia, Brazil

The Santo Antônio Dam is a hydroelectric dam on the Madeira River 6 km (4 mi) southwest of Porto Velho in the state of Rondônia, Brazil. The dam's run-of-the-river hydroelectric power station have 50 turbines each rated at 71.6 MW resulting in a total installed capacity of 3,580 MW. The first unit began commercial production in March 2012, and as of June 2015 a total of 32 units were operational. Last 6 units went online in December 2016. Most of the power will be exported to south-eastern Brazil via the Rio Madeira HVDC system.

The Teles Pires Dam is a run-of-the-river hydroelectric dam on the Teles Pires River, 330 km (205 mi) upstream of the confluence with the Tapajós river, on the border of the Brazilian states of Mato Grosso and Pará. The 80-metre (260 ft) dam impounds a 150-square-kilometre (58 sq mi) reservoir, 84% in Mato Grosso state and 16% in Para state.

<span class="mw-page-title-main">Mariana dam disaster</span> 2015 environmental disaster near Mariana, Minas Gerais, Brazil

The Mariana dam disaster, also known as the Bento Rodrigues or Samarco dam disaster, occurred on 5 November 2015, when the Fundão tailings dam at the Germano iron ore mine of the Samarco Mariana Mining Complex near Mariana, Minas Gerais, Brazil, suffered a catastrophic failure, resulting in flooding that devastated the downstream villages of Bento Rodrigues and Paracatu de Baixo, killing 19 people. The extent of the damage caused by the tailings dam collapse is the largest ever recorded with pollutants spread along 668 kilometres (415 mi) of watercourses.

<span class="mw-page-title-main">Garabí-Panambi Hydroelectric Complex</span> Garabi-Panambi Hydroelectric Complex

The Garabí-Panambi Hydroelectric Complex is a planned pair of hydroelectric dams and generating stations on the Uruguay River between Argentina and Brazil. There is controversy over the environmental impact on the fast-flowing river. The prime contractors are trying to avoid public image problems and delays such as those with other recent dams.

<span class="mw-page-title-main">Jatobá Hydroelectric Power Plant</span> Dam in Itaituba, Pará

The Jatobá Hydroelectric Power Plant is a planned hydroelectric power plant and dam on the Tapajós river in the state of Pará, Brazil. As of 2017 the project was suspended.

The Chacorão Dam is a proposed dam on the Tapajós river in the state of Pará, Brazil. It would flood a section of rapids in the river, making them navigable by barges carrying soybeans to ports on the Amazon River. The dam would include locks for the barges and a hydroelectric power plant. It is controversial since it would flood a large area of an indigenous territory.

The Cachoeira do Cai Dam is a planned hydroelectric dam on the Jamanxim River in the state of Pará, Brazil, with a capacity of 802 megawatts (1,075,000 hp).

The Cachoeira dos Patos Dam is a proposed hydroelectric dam on the Jamanxim River in the state of Pará, Brazil. Work has been delayed due to concern about environmental impact and lack of consultation with affected indigenous people.

The Jardim do Ouro Dam is a proposed hydroelectric dam on the Jamanxim River in the state of Pará, Brazil. The dam would have a 42,600 hectares reservoir and capacity of 227 megawatts (304,000 hp). It has not been studied on detail due to relatively low return on investment compared to other projects in the region.

The Jamanxim Dam is a proposed hydroelectric dam on the Jamanxim River in the state of Pará, Brazil.

<span class="mw-page-title-main">Tapajós hydroelectric complex</span> Proposed dams in Pará, Brazil

The Tapajós hydroelectric complex is a proposed complex of hydroelectric dams on the Tapajós and Jamanxim rivers in the state of Pará, Brazil. The Tapajós dams would contain locks, thus converting the river into a navigable waterway. A "platform" model is proposed under which all people and material would be moved by river or by helicopter, avoiding the need to build access roads and the consequent inflow of settlers and environmental damage. However, there have been protests against flooding of indigenous territory by the dams, and the largest dam seems unlikely to be approved.

<span class="mw-page-title-main">Brumadinho dam disaster</span> 2019 dam disaster which killed 237 in Brumadinho, Brazil

The Brumadinho dam disaster occurred on 25 January 2019 when a tailings dam at the Córrego do Feijão iron ore mine suffered a catastrophic failure. The dam, located 9 kilometres (5.6 mi) east of Brumadinho in Minas Gerais, Brazil, is owned by the mining company Vale, which was also involved in the Mariana dam disaster of 2015. The collapse of the dam released a mudflow that engulfed the mine's headquarters, including a cafeteria during lunchtime, along with houses, farms, inns, and roads downstream. 270 people died as a result of the collapse, of whom 259 were officially confirmed dead, in January 2019, and 11 others were reported as missing. As of January 2022 there were still 6 missing.

<span class="mw-page-title-main">Antônia Melo</span> Brazilian environmental activist

Antônia Melo da Silva is a Brazilian human rights activist and environmentalist. In 2017, she received the Alexander Soros Foundation Award for Environmental and Human Rights Activism for leading campaigns against the construction of the Belo Monte Dam and other environmentally harmful projects in the Amazon rainforest.

<span class="mw-page-title-main">Geraizeiro</span>

Geraizeiro is the traditional inhabitant of the cerrados of northern Minas Gerais state, in the Southeast region of Brazil.

Isabella Gonçalves Miranda, better known as Bella Gonçalves, is a Brazilian political scientist and politician. She served as a city councilor in Belo Horizonte representing the Socialism and Liberty Party (PSOL). Isabella also held the position of president of the city section of PSOL and was an active member of the Brigadas Populares, advocating for the right to the city. Notably, she became the first openly lesbian city councilor in Belo Horizonte. She was elected as a State Representative of Minas Gerais in 2022.

References

  1. 1 2 3 4 "Quem somos". MAB - Movimento dos Atingidos por Barragens (in Brazilian Portuguese). Retrieved 2022-01-30.
  2. 1 2 Movimento dos Atingidos por Barragens: Brasil! águas para vida, não para morte (in Brazilian Portuguese). Gráfica e Editora Battistel. 1995.
  3. 1 2 Perusso, M.A. "Marx and Marxism 2011: theory and practice" (PDF). Fluminense Federal University (RJ). Retrieved 2022-01-29.
  4. Alves, Giovanni (2000). "Do "novo sindicalismo" à "concertação social": ascensão (e crise) do sindicalismo no Brasil (1978-1998)". Revista de Sociologia e Política (in Portuguese) (15): 111–124. doi: 10.1590/S0104-44782000000200008 . hdl: 11449/10829 . ISSN   0104-4478.
  5. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 "Lutas". MAB - Movimento dos Atingidos por Barragens (in Brazilian Portuguese). Retrieved 2022-01-30.
  6. Ribeiro, Ana Maria Motta; Morais, Hugo Belarmino de (2019-06-27). "Classe social, identidade e luta por Direitos Humanos no Movimento de Atingidos por Barragens - Brasil". Revista Direito e Práxis (in Portuguese). 10 (2): 1046–1070. doi: 10.1590/2179-8966/2018/32202 . ISSN   2179-8966. S2CID   198844579.
  7. Ampolini, G. (2021-01-07). "PARTICIPATORY SOCIAL CONTROL IN THE IMPLEMENTATION OF HYDROELECTRIC PROPERTIES IN THE CHAPECÓ, IRANI AND CONTIGUOUS BASIN COMMITTEE (SANTA CATARINA) - Masters dissertation". Research Gate. Retrieved 2022-01-29.
  8. "Polícia Civil identifica mais uma vítima da tragédia da Vale em Brumadinho [29/12/2021]". noticias.uol.com.br (in Brazilian Portuguese). Retrieved 2022-01-30.
  9. "Moradores lutam por nova vida após tragédias em Mariana e Brumadinho". Folha de S.Paulo (in Brazilian Portuguese). 2019-11-03. Retrieved 2022-01-30.
  10. "Tragédia com barragem em Brumadinho pode ser a pior no mundo em 3 décadas". BBC News Brasil (in Brazilian Portuguese). Retrieved 2022-01-30.
  11. "Vice de MG diz que Brumadinho depende 'crucialmente' da Vale e precisará repensar economia". G1 (in Brazilian Portuguese). Retrieved 2022-01-30.