Nevada High-Speed Rail Authority

Last updated

The Nevada High-Speed Rail Authority (NHSRA) is a Nevada state agency established pursuant to the Nevada High-Speed Rail Act (S.B. 457) to develop and implement high-speed intercity rail service and to find contractors to build the line. [1] The authority is headed by a chairman, and the position is currently occupied by George Smith. [2] The Nevada High-Speed Rail Authority is headquartered in Las Vegas, Nevada. [3]

Contents

History

The bill was first introduced on April 7, 2015, and was passed into law on May 20, 2015, by a vote of 40–1. [4]

Purpose

The authority is intended to select a franchisee to construct and operate a high-speed rail system in Nevada, which is to be known as the Nevada High-Speed Rail System. [5] In 2015, they selected Brightline West as the company who shall be constructing the high-speed rail system that connect Las Vegas to Southern California. [6] As of 2021, the first track is meant to connect Los Angeles and California, with the first few stations being Victorville, Rancho Cucamonga, and Palmdale, though progress is still ongoing. [7] [8]

See also

Related Research Articles

People mover Fully automated transit systems, generally serving relatively small areas

A people mover or automated people mover (APM) is a type of small scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks.

California High-Speed Rail System under construction and planning in the United States

California High-Speed Rail is a publicly funded high-speed rail system under construction in the U.S. state of California. Its goal is to connect the Anaheim Regional Transportation Intermodal Center in Anaheim and Union Station in Downtown Los Angeles with the Salesforce Transit Center in San Francisco via the Central Valley, providing a one-seat ride between Union Station and San Francisco in 2 hours and 40 minutes, a distance of 380 miles (610 km). Future extensions are planned to connect southward to stations in San Diego County via the Inland Empire, as well as northward to Sacramento. It will be implemented in a number of self-supporting segments, as resources become available.

Las Vegas Monorail

The Las Vegas Monorail is a 3.9-mile (6.3 km) automated monorail mass transit system located adjacent to the Las Vegas Strip, in Clark County, Nevada, United States. It connects several large casinos in the unincorporated communities of Paradise and Winchester, and does not enter the City of Las Vegas. It was privately owned and operated by the Las Vegas Monorail Company until their 2020 bankruptcy when it was sold to the Las Vegas Convention and Visitors Authority, a local government agency. In 2013, total annual ridership was roughly 4.2 million, down from a pre-Great Recession peak of 7.9 million in 2007. The monorail is a registered not-for-profit corporation, allowed under Nevada law since the monorail provides a public service. The State of Nevada assisted in bond financing, but no public money was used in construction.

Ivanpah Valley Airport

Ivanpah Valley Airport is a planned government relief airport for McCarran International Airport in the Las Vegas Valley, to be located in the Ivanpah Valley of the Mojave Desert, within Clark County, Nevada.

<i>Desert Wind</i>

The Desert Wind was an Amtrak long-distance passenger train that ran from 1979 to 1997. It operated from Chicago to Los Angeles as a section of the California Zephyr, serving Los Angeles via Salt Lake City; Ogden, Utah; and Las Vegas.

High-speed rail in the United States Overview of the high-speed rail system in the United States of America

Plans for high-speed rail in the United States date back to the High-Speed Ground Transportation Act of 1965. Various state and federal proposals have followed. Despite being one of the world's first countries to get high-speed trains, it failed to spread. Definitions of what constitutes high-speed rail vary, including a range of speeds over 110 mph (180 km/h) and dedicated rail lines. Inter-city rail with top speeds between 90 and 125 mph is sometimes referred to in the United States as higher-speed rail.

The California–Nevada Interstate Maglev project was a proposed 269 mi (433 km) Maglev train line from Las Vegas, Nevada to Anaheim, California. One segment would run from Las Vegas to Primm, Nevada, with proposed service to the Las Vegas area's forthcoming Ivanpah Valley Airport. The top speed would be 310 mph (500 km/h). Though $45 million was appropriated in 2005 for the planning phase for the first 40 mi (64 km) segment, the money was never spent, and was finally reallocated to a highway project in a Las Vegas Airport in June 2010. The maglev project was not in the 2012 transportation plan under consideration by the Southern California Association of Governments. Removing it from the plan means that the project cannot receive federal funds, even for studies. The Southern California Association of Governments did leave a small portion of the route – from Anaheim to Ontario – in their 2012 transportation plan.

This article lists planned or proposed high-speed rail projects, arranged by country. Although many nations have done preliminary feasibility studies, many lines are eventually shelved or postponed due to high cost, and only a few nations of those proposing are actively building high-speed rail lines. Planned or proposed lines are therefore separated here from lines that are under construction, some nations having both. High-speed rail is public transport by rail at speeds in excess of 200 km/h (125 mph).

Palmdale Transportation Center

The Palmdale Transportation Center is a multi-modal transportation center featuring a Metrolink rail station, a local bus hub, and commuter bus hub, in the city of Palmdale, California. The center was completely rebuilt in April 2005. It now features a "clock tower plaza" which has an enclosed waiting room with concessions and vending, public telephone, restrooms, a bus pass sales office, and security service. For those who wish to wait closer to the services, the center has four partially enclosed shelters at the bus hub and six partially enclosed shelters for the rail platform. The center also has a large parking lot for those who wish to "Park and Ride" the Metrolink or commuter buses.

Brightline West, formerly known as XpressWest, is a proposed privately run high-speed rail route between Las Vegas Valley and Victor Valley, in the high desert area of Southern California. The project is intended to provide an alternative to air and automobile travel between Southern California and Las Vegas, a popular vacation spot for many living in the region. Construction on the route is expected to begin in spring 2021 and enter service in 2024.

Interstate 15 (I-15) is an Interstate Highway in the U.S. state of Nevada that begins in Primm, continues through Las Vegas and it crosses the border with Arizona in Mesquite. Within the state, the freeway runs entirely in Clark County. The highway was built along the corridor of the older U.S. Route 91 (US 91) and Arrowhead Trail, eventually replacing both of these roads.

Transportation in the Las Vegas Valley including the cities of Las Vegas, North Las Vegas and Henderson is a multi-faceted system. The street system is mostly laid out in a north-south/east-west system of roads. While most residents rely on cars, there is an extensive network of bus routes reaching many areas of the county. The Las Vegas Valley, being the one of the largest tourist destinations in the world, has a mass transportation system which favors the Las Vegas Strip.

Brightline Privately run inter-city rail route between Miami and West Palm Beach, Florida.

Brightline is a privately run inter-city rail route between Miami and West Palm Beach, Florida. Brightline began operating over its current route in January 2018 and the company is currently building an extension to the Orlando International Airport which is expected to enter service in 2022.

History of California High-Speed Rail

The California High-Speed Rail Authority was established in 1996 after decades of advocacy for building a high speed rail system in California. The passage of Proposition 1A in 2008, followed by the awarding of federal stimulus funds in 2010, established the initial funding for the California High-Speed Rail system. Construction contracts began to be awarded in 2013, and the groundbreaking ceremony for initial construction was held on January 6, 2015.

Bakersfield station (California High-Speed Rail)

Bakersfield is a proposed California High-Speed Rail station in Bakersfield, California. The station is part of the Initial Construction Segment.

Faraday Future American car manufacturer

Faraday Future is an American start-up technology company focused on the development of electric vehicles, founded in 2014.

Las Vegas station (Nevada) Former passenger railroad station in Las Vegas, Nevada

Las Vegas station was a passenger railroad station in Las Vegas, Nevada. It is connected to the rear of the Plaza Hotel & Casino and was in service from 1971 until the demise of the Desert Wind in 1997.

The Pacheco Pass Tunnels are a planned set of tunnels to carry California High-Speed Rail across the Diablo Range in the vicinity of Pacheco Pass east of Gilroy, California. The tunnels will constitute the first mountain crossing constructed as part of California High-Speed Rail, connecting the San Francisco Bay Area and Central Valley portions of the system.

Victor Valley is the southern portion of the phase 1 Brightline West rail line running to Las Vegas Boulevard in the Las Vegas Valley and future extensions continuing south to Palmdale, Rancho Cucamonga, and Los Angeles.

References

  1. Young, Allen (May 26, 2015). "Nevada joins the high-speed rail bandwagon with plans for Vegas, SoCal link" . Retrieved May 28, 2015.
  2. "Nevada High Speed Rail Authority" (PDF).
  3. "Meetings & Resources – Nevada High Speed Rail Authority" . Retrieved 2021-08-22.
  4. "Vote on SB457". Nevada Legislature. Nevada Legislative Counsel Bureau. May 20, 2015. Retrieved May 28, 2015.
  5. "NRS: CHAPTER 705 - RAILROADS AND MONORAILS". www.leg.state.nv.us. Retrieved 2021-08-22.
  6. "High-Speed Rail Project Moves Forward in Nevada". GovTech. 2015-11-19. Retrieved 2021-08-22.
  7. "Plans to build high-speed rail between Las Vegas and California delayed again". KTNV. 2021-06-22. Retrieved 2021-08-22.
  8. "Las Vegas-LA high-speed rail plan delayed until 2022". Las Vegas Review-Journal. 2021-06-22. Retrieved 2021-08-22.