North Downs Tunnel

Last updated

North Downs Tunnel
Class373-eurostar-north-downs-tunnel-high-speed-1-telephoto.jpg
North portal, with Class 373 on Eurostar service heading to Paris
Overview
Other name(s)Blue Bell Hill Tunnel
Line High Speed 1
Location Blue Bell Hill, Maidstone, Kent
Coordinates 51°19′44″N0°30′21″E / 51.32890°N 0.50589°E / 51.32890; 0.50589
Operation
Work begun1999
Opened2001
Owner Network Rail
North portal, dust whipped up by a test train before opening in 2003 Ctrl-testing-Clearing the dust from North Downs tunnel.jpg
North portal, dust whipped up by a test train before opening in 2003
South portal, leading under the North Downs at Blue Bell Hill Blubellhill.jpg
South portal, leading under the North Downs at Blue Bell Hill

The North Downs Tunnel, also known as the Blue Bell Hill Tunnel, is a railway tunnel that carries High Speed 1 through the North Downs, at Blue Bell Hill near Maidstone in Kent, south-east England.

Contents

The tunnel is 3.2 kilometres (2 mi) long, [1] with an internal diameter of 12 metres (40 ft) and a cross-sectional area (CSA) of 150 square metres, and descends to a depth of 100 m (325 ft) below the chalk hills. Thus, at the time of its completion, the North Downs Tunnel was both the largest (in terms of CSA) and deepest twin-track railway tunnels to have ever been constructed in the UK. [2] Trains using High Speed 1 can reach 300 kilometres per hour (186 mph) whilst in the tunnel.

Construction

The North Downs Tunnel was constructed as one element of the first phase of the Channel Tunnel Rail Link (CTRL), which was subsequently rebranded as High Speed 1. [3] Its north-west portal, the nearest to London, is positioned at the head of the Nashenden Valley while the south-facing portal emerges at the base of Bluebell Hill. At the time of its completion, the tunnel was reportedly regarded as being one of the largest railway tunnels to be constructed in Europe as well as the largest and deepest tunnel in the UK, possessing a length of 3.2km and an excavated cross section of up to 174 square m (13m diameter). [3] [2] A key reason for the larger than normal cross section was a result of environmental sensitivity having prevented the construction of any conventional pressure relief shafts for the tunnel, thus necessitating alternative means for handling the pressure waves generated by high speed trains. [4]

Much of the tunnel's planning and construction was performed by Arup Group. [2] The tender was subject to considerable revision, which had been attributed with generating a 15% reduction in costs incurred. [4] Responsibility for the design and project management of the tunnel lay with a multidisciplinary team of engineers that specialising in civil engineering, geotechnical, tunneling, environmental, rail operations, and safety engineers. [2] Particularly attention was paid to the North Downs Tunnel's construction, as it had been recognised from the onset of efforts to construct the CTRL that the tunnel was a potentially major risk area that could disrupt the wider programme. [2] It was considered to be the only major tunnel along the first half of the CTRL. [5]

The geology that the tunnel was bored through is largely dominated by relatively weak chalk beds. [3] Extensive surveys were performed, including a series of boreholes, which helped build a wider understanding of the material in general. [6] Planners decided that, unlike any of the other tunnels that were constructed along the CTRL, the construction of the North Downs Tunnel would use the modern techniques of the New Austrian Tunnelling method (NATM); in accordance with these method, the application of a sprayed concrete lining followed immediately after the mechanical excavation. [3] Throughout the construction process, continuous monitoring was practiced to track both settlement and any ground deformations that occurred. [7]

In June 2000, breakthrough, a key milestone in the tunnel's construction, was achieved; at this point, the work was reportedly two months ahead of schedule. [8] One of the changes made during construction was the application of the secondary tunnel lining, composed of reinforced concrete; after testing revealed the overlying chalk to be stiffer than had been predicted by earlier surveys, it was recognised that less additional strength would be required to meet the required standards, thus the thickness of this secondary lining was reduced. [4]

During December 2001, it was announced that construction of the tunnel had been completed; which was five months ahead of schedule while also being £5 million under budget. [3] [2] This outcome, being better than anticipated, has been attributed to a combination of technical innovation, value engineering and an integrated observational approach that was practiced during the programme. [3] Over 100 workers working in shifts 24 hours a day made this possible, despite the site being perceived as a major risk before the project.

Related Research Articles

<span class="mw-page-title-main">Channel Tunnel</span> Undersea rail tunnel linking France and England

The Channel Tunnel, also known as the Chunnel, is a 50.46-kilometre (31.35 mi) underwater railway tunnel that connects Folkestone with Coquelles beneath the English Channel at the Strait of Dover. It is the only fixed link between the island of Great Britain and the European mainland. At its lowest point, it is 75 metres (246 ft) below the sea bed and 115 metres (377 ft) below sea level. At 37.9 kilometres (23.5 mi), it has the longest underwater section of any tunnel in the world and is the third longest railway tunnel in the world. The speed limit for trains through the tunnel is 160 kilometres per hour (99 mph). The tunnel is owned and operated by the company Getlink, formerly "Groupe Eurotunnel".

<span class="mw-page-title-main">High Speed 1</span> High-speed railway linking London with the Channel Tunnel

High Speed 1 (HS1), legally the Channel Tunnel Rail Link (CTRL), is a 109.9-kilometre (68.3-mile) high-speed railway linking London with the Channel Tunnel.

<span class="mw-page-title-main">Tunnel</span> Underground passage made for traffic

A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube construction techniques rather than traditional tunnel boring methods.

Arup is a British multinational professional services firm headquartered in London that provides design, engineering, architecture, planning, and advisory services across every aspect of the built environment. It employs about 17,000 people in over 90 offices across 35 countries, and has participated in projects in over 160 countries.

<span class="mw-page-title-main">Stratford International station</span> Docklands Light Railway and National Rail station

Stratford International is a National Rail station in Stratford and a separate Docklands Light Railway (DLR) station nearby, located in East Village in London. Despite its name, no international services stop at the station; plans for it to be served by Eurostar trains never came to fruition. The National Rail platforms are, however, served by domestic Southeastern trains on the High Speed 1 route originating at St. Pancras, with interchange to Eurostar trains at other stops along the route. On the DLR it is a terminus – one of seven end-of-the-line termini – for local services via Canning Town and London City Airport.

<span class="mw-page-title-main">Thames Water Ring Main</span> London water supply infrastructure

The Thames Water Ring Main is a system of approximately 80 km (50 mi) of concrete tunnels which transfer drinking water from water treatment works in the Thames and River Lea catchments for distribution within central London.

<span class="mw-page-title-main">London and Continental Railways</span> British real estate holding company

London and Continental Railways (LCR) is a property development company owned by the Government of the United Kingdom for developing former railway land. The company was originally established in 1994 as a private consortium to own European Passenger Services and build the Channel Tunnel Rail Link (CTRL) under a contract agreed with the government.

<span class="mw-page-title-main">Regional Eurostar</span> Never-implemented Eurostar services from north of London

Regional Eurostar was a planned Eurostar train service from Paris and Brussels to locations in the United Kingdom to the north and west of London.

<span class="mw-page-title-main">High-speed rail in the United Kingdom</span> Overview of the high-speed rail system in the United Kingdom

High-speed rail in the United Kingdom is provided on five upgraded railway lines running at top speeds of 125 mph (200 km/h) and one purpose-built high-speed line reaching 186 mph (300 km/h).

<span class="mw-page-title-main">Beacon Hill Tunnel (Hong Kong)</span> Hong Kong railway tunnel

Beacon Hill Tunnel is a railway tunnel in Hong Kong on the original Kowloon–Canton Railway, linking Kowloon Tong to its immediate south and Sha Tin to its north. The nearest stations to the south and north of the tunnel are Kowloon Tong and Tai Wai respectively. Today, the tunnel carries the MTR East Rail line metro service and through trains to Mainland China.

<span class="mw-page-title-main">Medway Viaducts</span> Bridge in Cuxton, England

The Medway Viaducts are three bridges or viaducts that cross the River Medway between Cuxton and Borstal in north Kent, England. The two road bridges carry the M2 motorway carriageways. The other viaduct carries the High Speed 1 railway line. All three bridges pass over the Medway Valley Line.

Michael John Glover, OBE, FREng, is a British Engineer and a director of Arup and technical director of 'Rail Link Engineering'.

<span class="mw-page-title-main">Robert Mair, Baron Mair</span>

Robert James Mair, Baron Mair, is a geotechnical engineer and Emeritus Sir Kirby Laing Professor of Civil Engineering and director of research at the University of Cambridge. He is Head of the Cambridge Centre for Smart Infrastructure and Construction (CSIC). He was Master of Jesus College, Cambridge, from 2001 to 2011 and a fellow of St John's College, Cambridge, from 1998 to 2001. In 2014 he was elected a vice president of the Institution of Civil Engineers and on 1 November 2017 became the Institution's president for 2017–18, its 200th anniversary year. He was appointed an independent crossbencher in the House of Lords in 2015 and is currently a member of its Select Committee on Science and Technology.

Heathrow Hub railway station was a proposed interchange that would serve – mainly – a now disbanded potential alignment of High Speed 2 (HS2) services that would adjoin the expanded part of Heathrow Airport, England. It was a cornerstone part of an expansion plan put forward in 2008, by engineering firm Arup, to set up the UK's first high-speed rail network north-west of London.

Geoprofessions is a term coined by the Geoprofessional Business Association to connote various technical disciplines that involve engineering, earth and environmental services applied to below-ground ("subsurface"), ground-surface, and ground-surface-connected conditions, structures, or formations. The principal disciplines include, as major categories:

<span class="mw-page-title-main">History of High Speed 2</span>

The history of High Speed 2 is the background to the planned construction of High Speed 2 (HS2), a new high-speed railway in Great Britain that would connect London, Birmingham, Manchester, Leeds and other cities in the UK.

<span class="mw-page-title-main">HS4Air</span> 2018 proposal for a high-speed rail link between HS2, Heathrow, Gatwick and HS1

HS4Air is a proposal for a 140-kilometre (87 mi) high-speed railway line in the United Kingdom, put forward in 2018 by a British engineering consultancy, Expedition Engineering.

The Chiltern Tunnel is a high-speed railway tunnel currently under construction in Buckinghamshire and Hertfordshire, England, and will upon completion carry the High Speed 2 (HS2) railway line under the Chiltern Hills. The twin-bore tunnels, which are 16.04 km long, will be the longest on the HS2 line. Each tunnel will also have additional 220 m (720 ft) entry and 135 m (443 ft) exit perforated concrete portals to reduce sudden changes in air pressure and subsequent noise.

<span class="mw-page-title-main">Geological engineering</span>

Geological engineering is a discipline of engineering concerned with the application of geological science and engineering principles to fields, such as civil engineering, mining, environmental engineering, and forestry, among others. The work of geological engineers often directs or supports the work of other engineering disciplines such as assessing the suitability of locations for civil engineering, environmental engineering, mining operations, and oil and gas projects by conducting geological, geoenvironmental, geophysical, and geotechnical studies. They are involved with impact studies for facilities and operations that affect surface and subsurface environments. The engineering design input and other recommendations made by geological engineers on these projects will often have a large impact on construction and operations. Geological engineers plan, design, and implement geotechnical, geological, geophysical, hydrogeological, and environmental data acquisition. This ranges from manual ground-based methods to deep drilling, to geochemical sampling, to advanced geophysical techniques and satellite surveying. Geological engineers are also concerned with the analysis of past and future ground behaviour, mapping at all scales, and ground characterization programs for specific engineering requirements. These analyses lead geological engineers to make recommendations and prepare reports which could have major effects on the foundations of construction, mining, and civil engineering projects. Some examples of projects include rock excavation, building foundation consolidation, pressure grouting, hydraulic channel erosion control, slope and fill stabilization, landslide risk assessment, groundwater monitoring, and assessment and remediation of contamination. In addition, geological engineers are included on design teams that develop solutions to surface hazards, groundwater remediation, underground and surface excavation projects, and resource management. Like mining engineers, geological engineers also conduct resource exploration campaigns, mine evaluation and feasibility assessments, and contribute to the ongoing efficiency, sustainability, and safety of active mining projects

References

  1. "HS1 Sectional Appendix" (PDF). High Speed 1 . May 2013. p. A19. Retrieved 6 February 2022. NORTH DOWNS TUNNEL (3199m)
  2. 1 2 3 4 5 6 "North Downs Tunnel". Arup. Archived from the original on 21 February 2007. Retrieved 27 July 2020.
  3. 1 2 3 4 5 6 Warren, Colin (March 2003). "North downs tunnel technical overview". pp. 36–39.
  4. 1 2 3 Watson, Paul (November 2003). "Channel Tunnel Rail Link section 1: North Downs tunnel". Proceedings of the Institution of Civil Engineers - Civil Engineering. 156 (6): 40–48. doi:10.1680/cien.2003.156.6.40. ISSN   0965-089X.
  5. "Building Britain's first high speed line". railwaygazette.com. 1 May 1999.
  6. C.D. Warren; R.N. Mortimore (February 2003). "Chalk engineering geology – Channel Tunnel Rail Link and North Downs Tunnel". Quarterly Journal of Engineering Geology and Hydrogeology. 36 (1): 17–34. doi:10.1144/1470-9236/01033. S2CID   128770455.
  7. C.D. Warren; J.A. Lawrence; M. Preene; U.L. Lawrence; R. Buckley (16 August 2018). "Engineering in Chalk: Geology and geotechnics of the HS1 North Downs tunnel". icevirtuallibrary.com. doi:10.1680/eiccf.64072.587.{{cite journal}}: Cite journal requires |journal= (help)
  8. "North Downs Tunnel". New Civil Engineer. 1 July 2000.