Native name | ОАО «ОГК-6» |
---|---|
Type | Public (OAO) |
Industry | Power generation |
Predecessor | RAO UES |
Founded | 16 March 2005 |
Defunct | 1 November 2011 |
Fate | Merged with OGK-2 |
Successor | OGK-2 |
Headquarters | , |
Key people | Alexey Mityushov (CEO) |
Products | Power and heat |
Revenue | US$1.5 billion (2007) |
Number of employees | 6,100 (2007) |
Parent | Gazprom |
The Sixth Wholesale Power Market Generating Company JSC (OGK-6) was a Russian power generation company formed by merger of six generation companies. In 2006, the following power plants were merged into single company:
The installed capacity of all six thermal power plants was about 9,052 MW which made OGK-6 the fourth largest power company by installed capacity in Russia. The total installed heat of OGK-6 plants amounted to 2,704 Gcal/h. The power output of the OGK-6 power plants in 2007 was around 32.065 TWh.
OGK-6 shares were traded on MICEX and RTS.
In April 2010, it was announced that Gazprom, the major shareholder of OGK-2 and OGK-6, will merger OGK-6 into OGK-2 to create a single company with 10 power stations and a capacity of 17,750 MW. [1] The merger was completed by 1 November 2011. [2]
OGK-3 was a Russian power company. The stock was traded on the MICEX-RTS stock exchange.
Joint Stock Company Inter RAO UES, traded as, is a diversified energy holding company headquartered in Moscow, Russia. Its business includes power and heat generation, electricity supply, international energy trading, engineering, design and development of electric power infrastructure. In addition to its assets in Russia it controls several energy companies outside Russia including thermal and hydro power plants, grid operators and energy traders. It holds a monopoly on the export and import of electricity in Russia.
Kirishi Power Station is a thermal power station (GRES) at the town of Kirishi, Kirishsky District, Leningrad Oblast, Russia. The power plant is located adjacent to a larger Kirishi oil refinery. Installed electrical capacity of the power station reached 2595 MW after completion of modernization program for unit 6 in 2011, which included installation of two gas turbines for this unit to utilize combined cycle with total increase of capacity 500 MW and efficiency 20%. The heating capacity is 1,234 Gcal/h.
North-West Thermal Power Plant is a cogeneration power station (TETs) in Saint-Petersburg, owned by Inter RAO UES. This is a first power station in Russia to use combined cycle.
Energy in Russia describes energy and electricity production, consumption and export from Russia. Energy policy of Russia describes the energy policy in the politics of Russia more in detail. Electricity sector in Russia is the main article of electricity in Russia.
The First Generation Company of the Wholesale Electricity Market (OGK-1) was a large Russian company formed by the merger of six electricity generation companies.
OGK-2 is a Russian power generation company. Majority of the company's stock is owned by Gazprom.
Unipro is a Russian power generation company formed by merger of five generation companies. 83.73% of the company is owned by the German energy company Uniper, the rest of the shares are owned by minority shareholders.
Enel Russia is a Russian power generation company created by the reorganization of RAO UES, a former united power company of Russia. The company is registered in Yekaterinburg and its headquarters are in Moscow. The Italian Enel Group owns a majority stake of the company (56%).
Beryozovskaya GRES is a coal-fired power plant near the town of Sharypovo in Krasnoyarsk Krai, Russia. The power plant is owned by Unipro. The installed capacity of the plant is 1,600 megawatts (2,100,000 hp).
Energy in Armenia describes energy and electricity production, import and consumption in Armenia.
TGC-1 is a regional power company operating in North-West Russia. The company has its headquarters in Saint Petersburg with branches in Karelia and Kola.
Alterra Power Corp. a subsidiary of Innergex Renewable Energy Inc., is a diversified renewable power generation company based in Vancouver, British Columbia, Canada. It was formed in 2011 through the merger of Magma Energy Corp. and Plutonic Power Corp. It develops, owns, acquires and operates hydroelectric, wind, solar energy and geothermal projects. On February 6, 2018, Innergex Renewable Energy Inc. completed the acquisition of Alterra including all its assets.
The Ryazan Power Station is the fifth largest power station in Russia, with an installed capacity of 3,130 MW. The power station is located in Novomichurinsk of the Ryazan Oblast, Russia. Construction began in 1968 with the first unit going online in 1973. It mainly fires lignite from Moscow and Kansk-Achinsk coal basins.
Renewable energy in Russia mainly consists of hydroelectric energy. In 2010, the country was the sixth largest producer of renewable energy in the world, although it was 56th when hydroelectric energy was not taken into account. Some 179 TWh of Russia's energy production came from renewable energy sources, out of a total economically feasible potential of 1823 TWh. 16% of Russia's electricity was generated from hydropower, and less than 1% was generated from all other renewable energy sources combined. Roughly 68% of Russia's electricity was generated from thermal power and 16% from nuclear power.
Russia is the fourth largest generator and consumer of electricity in the world. Its 440 power stations have a combined installed generation capacity of 220 GW.
Reftinskaya GRES is the largest solid fuel thermal power plant in Russia. It is situated in Sverdlovsk Oblast, 100 km north-east of Yekaterinburg and 18 km from Asbest. Reftinskiy town, which is home to 18,000 people, is situated 2.5 km from the GRES, which produces 20,000 million KWh annually. It has a total installed capacity of 3,800 and heat power— 350 GKh. Coal from Ekibastuz's coal field is used as the main fuel and the black oil is used as the starting fuel. GRES produces power with the bar «Outdoor switchgear -500 kV» on five power lines -500 kV and with the bar «Outdoor switchgear -220 kV» on five power lines -220 kV. The station supplies power to the industrial areas in Sverdlovsk, Tyumen, Perm and Chelyabinsk regions. The construction of the electric power station was started in 1963, the launching of the first power unit took place in 1970 and in 1980 – of the last one.
Pskov power station is a large-scale Russian regional power station located 5.3 kilometres (3.3 mi) from Dedovichi urban settlement in Pskov Oblast near the western border of the Russian Federation. The station operates as a branch of OGK-2 since 2006.
Nevinnomysskaya GRES is a power plant of federal importance located in Nevinnomyssk, Stavropol krai, Northern Caucasus federal area. It is a subsidiary of Enel Russia.