Rover pipeline

Last updated

The Rover pipeline is a natural gas pipeline currently under construction in the United States. It is being constructed by Energy Transfer Partners. When completed, it will be 713 miles long, extending from southeastern Ohio in Belmont County to southern Michigan in Livingston County. [1] Construction began in the first quarter of 2017 and is scheduled to end November 2017. The Rover pipeline is expected to carry 3.25 billion cubic feet per day of natural gas through approximately 710 miles of 24-inch-, 30-inch-, 36-inch-, and 42-inch-wide pipeline.

In November 2017, the Ohio Attorney General filed suit against the owner and operator of the Rover pipeline (Rover Pipeline LLC) for multiple alleged failures, including illegal discharge of drilling fluids and failure to secure discharge permits. [2] The Rover pipeline allegedly violated Ohio's water standards over a dozen times between April and September 2017.

In November 2019 Energy Transfer began protesting the tax rate they should pay for the pipeline in Ohio. [3]

Related Research Articles

TC Energy Canadian energy company

TC Energy Corporation is a major North American energy company, based in the TC Energy Tower building in Calgary, Alberta, Canada, that develops and operates energy infrastructure in Canada, the United States, and Mexico. The company operates three core businesses: Natural Gas Pipelines, Liquids Pipelines and Energy.

Tennessee Gas Pipeline Set of natural gas pipelines in the United States

Tennessee Gas Pipeline (TGPL) is a set of natural gas pipelines that run from the Texas and Louisiana coast through Arkansas, Mississippi, Alabama, Tennessee, Kentucky, Ohio, and Pennsylvania to deliver natural gas in West Virginia, New Jersey, New York, and New England. The 11,900-mile (19,200 km) long system is operated by the Tennessee Gas Pipeline Company, a subsidiary of Kinder Morgan. It is one of the largest pipeline systems in the United States. Its FERC code is 9. TGP's PHMSA pipeline operator i.d. is 19160.

Kinder Morgan Energy Transportation Company

Kinder Morgan, Inc. is one of the largest energy infrastructure companies in North America. The company specializes in owning and controlling oil and gas pipelines and terminals.

Energy Transfer LP is a company engaged in natural gas and propane pipeline transport. It is organized under Delaware state laws and headquartered in Dallas, Texas. It was founded in 1995 by Ray Davis and Kelcy Warren, who remains Chairman and CEO. It owns a 36.4% interest in Dakota Access, LLC, the company responsible for developing the controversial Dakota Access Pipeline.

Dakota Access Pipeline

The Dakota Access Pipeline (DAPL) or Bakken pipeline is a 1,172-mile-long (1,886 km) underground oil pipeline in the United States. It begins in the shale oil fields of the Bakken Formation in northwest North Dakota and continues through South Dakota and Iowa to an oil terminal near Patoka, Illinois. Together with the Energy Transfer Crude Oil Pipeline from Patoka to Nederland, Texas, it forms the Bakken system.

References

  1. "Energy Transfer is said to weigh sale of Rover Pipeline Stake". Bloomberg News. July 15, 2019.
  2. http://www.ohioattorneygeneral.gov/Files/Briefing-Room/News-Releases/Environmental-Enforcement/2017-11-03-Rover-Complaint-Signed-for-Filing.aspx
  3. McLaughlin, Jan Larson (November 28, 2019). "Rover pipeline protests its tax rate – leaving local entities in limbo". BG Independent News.