SaskPower

Last updated

Saskatchewan Power Corporation
SaskPower
FormerlySaskatchewan Power Commission
Company type Crown Corporation
Industry Electric utility
Founded1929;95 years ago (1929)
Headquarters,
Area served
Saskatchewan
Key people
Rupen Pandya, CEO [1]
Products Electricity generation, transmission and distribution
RevenueC$2,844 million (2022-23) [2]
C$72 million (2022-23) [2]
Total assets C$12,878 million (2022-23) [3]
Total equity C$2,180 million (2022-23) [3]
Number of employees
3,100 (2022-23) [4]
Parent Crown Investments Corporation [5]
Subsidiaries
  • NorthPoint Energy Solutions [6]
  • SaskPower International [5]
Website www.saskpower.com

Saskatchewan Power Corporation, [7] operating as SaskPower, is the principal electric utility in Saskatchewan, Canada. Established in 1929 by the provincial government, it serves more than 550,000 customers and manages nearly $13 billion in assets. SaskPower is a major employer in the province with over 3,100 permanent full-time staff located in approximately 70 communities. [4]

Contents

SaskPower head office in Regina SaskPower Building, Regina.jpg
SaskPower head office in Regina

SaskPower was founded as the Saskatchewan Power Commission in 1929, becoming the Saskatchewan Power Corporation in 1949 with the passage of The Rural Electrification Act. [8] The abbreviated name SaskPower was officially adopted as a trade name in 1987.

Owned by the government through its holding company, the Crown Investments Corporation, SaskPower is governed by a Board of Directors who are accountable to the provincial government Minister Responsible for Saskatchewan Power Corporation.

SaskPower has the exclusive right and the exclusive obligation to supply electricity in the province, except in the city of Swift Current and most of the city of Saskatoon. The Swift Current Department of Light and Power provides electrical services within the municipal boundary of Swift Current. [9] Saskatoon Light & Power provides service to the customers within the 1958 boundaries of Saskatoon while SaskPower has responsibility for areas annexed after 1958. [10]

Customers

Boundary Dam Power Station Boundary Dam.jpg
Boundary Dam Power Station

SaskPower serves more than 550,000 customers through more than 160,000 kilometres of power lines throughout the province and covers a service territory that includes Saskatchewan's geographic area of approximately 652,000 km2 (252,000 sq mi). This low customer density means that while most North American electrical utilities supply an average of 12 customers per circuit kilometre, SaskPower supplies about three. [4] In fiscal year 2022-23, SaskPower sold 23,818 GWh of electricity for $2,844 million (CAD). [11]

Facilities

Francois Finlay Dam and Nipawin Hydroelectric Station Nipawin Hydroelectric Station.jpg
Francois Finlay Dam and Nipawin Hydroelectric Station

SaskPower has a total generating capacity of 5,437 megawatts (MW) from 31 generating facilities, including three coal-fired power stations, ten natural gas stations, seven hydroelectric stations, eight wind power facilities and three solar facilities. Of these 31 facilities, 12 of them are operated by Independent Power Producers who sell electricity to SaskPower through a Power Purchase Agreement.

The Chinook Power Station is a 350MW combined-cycle natural gas power station near Swift Current that has come online in 2019.

The Boundary Dam Power Station is a coal-fired station, the number 3 boiler of which was chosen for renewal as a carbon capture and storage facility.

The SaskPower transmission system utilizes lines carrying 230,000 volts, 138,000 volts and 72,000 volts. There are 59 switching stations and 200 distribution stations on the transmission system. [4]

SaskPower has four interconnections to Manitoba, one interconnection to North Dakota, and one interconnection to Alberta. Manitoba and North Dakota are on the same grid frequency as Saskatchewan, which means interconnections can be made directly using a normal AC transmission line. Alberta is part of WECC, so the interconnection relies on an AC/DC-AC link via the McNeill HVDC Back-to-back station. [12]

In 2022, SaskPower signed an agreement with Southwest Power Pool to increase transmission capacity between Saskatchewan and the United States. The agreement enables the import and export of up to 650 MW of power starting in 2027.

Rural areas

Incorporated under The Power Corporation Act (1949), SaskPower purchased the majority of the province's small, independent municipal electrical utilities and integrated them into a province-wide grid. It was also responsible under The Rural Electrification Act (1949) for the electrification of the province's rural areas, bringing electricity to over 66,000 farms between 1949 and 1966. To manage the high costs of electrifying the province's sparsely populated rural areas, SaskPower used a large-scale implementation of a single wire ground return distribution system, claimed to be a pioneering effort (although some utilities in the USA had been using such a system on its rural lines). It was at the time one of the largest such systems in the world. One of the last cities in the province added to SaskPower's system was North Portal in 1971 (which had been served up to this point from Montana-Dakota Utilities' distribution system in Portal, ND just across the border).

Subsidiaries

Island Falls Hydroelectric Station IslandFallsGS070716.jpg
Island Falls Hydroelectric Station

Rural electrification

SaskPower was founded by an Act of the provincial legislature as the Saskatchewan Power Commission in 1929. The purpose of the Commission was to research how best to create a provincial power system which would provide the province's residents with safe, reliable electric service.

A provincial power system was desirable for many reasons. In the early days of electricity in the province of Saskatchewan, electricity was largely unavailable outside of larger centres. Most electrical utilities were owned either privately or by municipalities, and none of them were interconnected. Because each utility operated independently, rates often varied significantly between communities – anywhere from 4 [14] to 45 [15] cents per kilowatt hour in the mid-1920s. The rapid growth in the province's population in the first decades of the century – from 91,279 to 757,510 within 20 years – had led to a sharp increase in the demand for electricity. Finally, the provincial government had determined that the lack of inexpensive power was hampering the development of industry in the province.

While the Commission began purchasing independently owned electrical utilities with the goal of interconnecting them, the economic situation of the 1930s and the labour shortage caused by the Second World War delayed the creation of a provincial power system for nearly two decades.

By 1948, the Commission operated 35 generating stations and more than 8,800 km of transmission lines. However, most farm families who had electricity generated it themselves using battery systems charged by wind turbines or gasoline- or diesel-powered generators. Across the province, only 1,500 farms were connected to the electrical grid, most of them because of their proximity to the lines that linked cities and larger towns.[ citation needed ]

In 1949, by an Act of the Provincial Legislature, the Commission became the Saskatchewan Power Corporation. The first task of the new Corporation was to purchase what remained of the province's small, independent electrical utilities and to begin integrating them into a province-wide electrical grid.

The final step in creating a truly province-wide grid was to electrify the province's vast rural areas. The primary hurdle to rural electrification was the very low customer density in the province – approximately one farm customer per network mile (1.6 km) – and the extremely high cost of a network of the scale required by the vast distances between customers. After much study, the Corporation adopted a single wire ground return distribution scheme, which lowered the cost of rural electrification significantly.[ citation needed ]

The first year of the program set the goal of connecting 1200 rural customers to the network. The experience gained during the first years led to an increased rate of connections every year, leading to a peak yearly connection rate in 1956 of 7,800 customers. By 1961, 58,000 farms were connected, and by 1966 when the program concluded, the Corporation had provided power to a total of 66,000 rural customers. In addition, hundreds of schools, churches and community halls received electrical service during this period.[ citation needed ]

Corporate governance

SaskPower is governed by a board of directors that is responsible to the Minister Responsible for Saskatchewan Power Corporation. The board gets appointed by the lieutenant governor of Saskatchewan. [5] In February 2024, the directors of the corporation included: Chief Darcy Bear (Chair), Bryan Leverick (Vice-Chair), Neil Henneberg (Corporate Secretary), Terry Bergan, Amber Biemans, Shawn Grice, Cherilyn Jolly-Nagel, Fred Mathewson, Rob Nicolay, Jeff Richards, Stephanie Yong and the Honourable Vaughn Solomon Schofield. [16]

Leadership

Unions representing SaskPower employees

Emissions Reductions

By 2030, SaskPower plans to reduce their greenhouse gas emissions by over 50% compared to 2005. [26] The corporation is also on track to achieve net-zero GHG emissions by 2050 or earlier.

In 2012, the Harper government introduced regulations to start phasing out coal-fired power plants in Canada. These regulations set an emissions limit for coal-fired generating units of 420 tonnes of CO2 per GWh. The limit was to be imposed in 2015 on all new coal units, and would also apply to units built before 1975 starting in 2020, and to units built before 1986 starting in 2030, and would also apply to all units once they reach 50 years of age regardless of the aforementioned dates. [27]

In 2014, SaskPower rebuilt Boundary Dam unit 3 with a CCS system capable of capturing 90% of the CO2 emissions of the unit, and 100% of the SO2 emissions. [28]

In 2018, the Trudeau government accelerated the coal phase-out by mandating that all coal units must shut down by 2030, regardless of the year they were built. [29] The Trudeau government also implemented a nationwide carbon tax that made it more-expensive for SaskPower to operate both coal and natural gas plants in comparison to hydro, wind, and solar facilities.

The federal coal regulations mentioned above would have meant that Boundary Dam units 4 and 5 would need to close at the end of 2019. However, in 2019 the Moe government was able to negotiate an equivalency agreement with the Trudeau government that allowed Boundary Dam unit 4 to run until the end of 2021 and Boundary Dam unit 5 until the end of 2024 due to SaskPower's investments into CCS technology on unit 3. [30]

To fill the gap in firm baseload capacity created by the retirement of conventional coal, SaskPower is relying on the new natural gas and import contracts. Additional supply options that are currently available include wind and solar, and at a smaller scale biomass, flare gas, and distributed generation options like residential solar from net metering. The corporation is also exploring additional low- and non-GHG emitting supply options including Saskatchewan hydro, and new technologies like CCS on natural gas and nuclear power from small modular reactors (SMR). [31]

The government of Canada’s proposed Clean Electricity Regulations (CER) would require SaskPower to reduce its GHG emissions to net zero by 2035. CER will impact 2,900 MW of baseload and dispatchable generation capacity. It’s expected this would significantly hinder the corporation’s ability to serve its customers during peak demand periods. [32]

In addition to building new generators and interconnections to reduce emissions, SaskPower also implements energy efficiency and demand-side management (DSM) programs to reduce electricity use. Since 2008, SaskPower’s DSM programs have reduced peak demand for electricity in Saskatchewan by 157MW.

Related Research Articles

<span class="mw-page-title-main">Electric power industry</span> Industry that provides the production and delivery of electric energy

The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

<span class="mw-page-title-main">Manitoba Hydro</span> Electric power and natural gas utility company in Manitoba, Canada

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.

<span class="mw-page-title-main">Hydro One</span> Electricity transmission and distribution utility serving in Ontario, Canada

Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario. In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.

<span class="mw-page-title-main">NB Power</span> Electric utility company

New Brunswick Electric Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown corporation by the government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.

Newfoundland and Labrador Hydro, commonly known as Hydro, is a provincial Crown corporation that generates and delivers electricity for Newfoundland and Labrador, as well as portions of Quebec and the north-eastern areas of the United States. Between 2007 and 2021, NL Hydro was a subsidiary of the provincial Crown-owned energy holding company Nalcor Energy.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

Nova Scotia Power Inc. is a vertically integrated electric utility in Nova Scotia, Canada. It is privately owned by Emera and regulated by the provincial government via the Nova Scotia Utility and Review Board (NSUARB). Nova Scotia Power Inc provides electricity to 520,000 residential, commercial and industrial customers in Nova Scotia.

SaskEnergy Incorporated is a Crown corporation of the Saskatchewan government, responsible for delivering and selling natural gas to residential, commercial, and industrial customers in the province of Saskatchewan, Canada. The company owns 70,000 kilometres of distribution pipelines, 15,000 kilometres of transmission pipelines, and serves over 405,000 customers. It is governed by The SaskEnergy Act and is the designated subsidiary of Crown Investments Corporation of Saskatchewan.

<span class="mw-page-title-main">Energy policy of Canada</span> About Canadas federal and provincial energy policies

Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.

Saskatoon Light & Power (SL&P) is a utility that provides electrical services within parts of the city of Saskatoon, Saskatchewan, Canada. Founded in 1906, SL&P is a municipally owned corporation that is wholly owned by the City of Saskatoon. The utility provides electrical service within the boundaries of Saskatoon as they stood in 1958, except for on the grounds of the University of Saskatchewan. In all other areas of the province, including areas of Saskatoon outside the historical 1958 boundary, electricity is distributed by the provincial utility SaskPower. SaskPower is also the supplier of the electricity that is distributed by SL&P.

<span class="mw-page-title-main">Lingan Generating Station</span>

The Lingan Generating Station is a 620 MW Canadian coal-fired electrical generating station located in the community of Lingan in Nova Scotia's Cape Breton Regional Municipality. Lingan is operated by Nova Scotia Power Inc. and is their largest generating station.

Through the 1996 Electric Utilities Act the Alberta's deregulated electricity market began.

<span class="mw-page-title-main">Electrical grid</span> Interconnected network for delivering electricity from suppliers to consumers

An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power long distances, and lastly electric power distribution to individual customers, where voltage is stepped down again to the required service voltage(s). Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids.

There is a large array of stakeholders that provide services through electricity generation, transmission, distribution and marketing for industrial, commercial, public and residential customers in the United States. It also includes many public institutions that regulate the sector. In 1996, there were 3,195 electric utilities in the United States, of which fewer than 1,000 were engaged in power generation. This leaves a large number of mostly smaller utilities engaged only in power distribution. There were also 65 power marketers. Of all utilities, 2,020 were publicly owned, 932 were rural electric cooperatives, and 243 were investor-owned utilities. The electricity transmission network is controlled by Independent System Operators or Regional Transmission Organizations, which are not-for-profit organizations that are obliged to provide indiscriminate access to various suppliers to promote competition.

<span class="mw-page-title-main">Boundary Dam Power Station</span> Power station in Saskatchewan, Canada

Boundary Dam Power Station is the largest coal fired station owned by SaskPower, located near Estevan, Saskatchewan, Canada.

<span class="mw-page-title-main">Point Aconi Generating Station</span> Thermal Generating System in eastern Nova Scotia, Canada

The Point Aconi Generating Station is a 165 MW Canadian electrical generating station located in the community of Point Aconi, Nova Scotia, a rural community in the Cape Breton Regional Municipality. A thermal generating station, the Point Aconi Generating Station is owned and operated by Nova Scotia Power Corporation. It opened on August 13, 1994 following four years of construction.

<span class="mw-page-title-main">North American power transmission grid</span> Series of electrical grids that power the US and Canada

The electrical power grid that powers Northern America is not a single grid, but is instead divided into multiple wide area synchronous grids. The Eastern Interconnection and the Western Interconnection are the largest. Three other regions include the Texas Interconnection, the Quebec Interconnection, and the Alaska Interconnection. Each region delivers power at a nominal 60 Hz frequency. The regions are not usually directly connected or synchronized to each other, but there exist some HVDC interconnectors. The Eastern and Western grids are connected via seven links that allow 1.32 GW to flow between them. A study by the National Renewable Energy Laboratory found that increasing these interconnections would save energy costs.

References

  1. "SaskPower Announces New President & CEO".
  2. 1 2 SaskPower 2023, p. 75.
  3. 1 2 SaskPower 2023, p. 77.
  4. 1 2 3 4 SaskPower 2019, p. 2.
  5. 1 2 3 4 5 SaskPower 2019, p. 11.
  6. SaskPower 2023, p. 1.
  7. "Terms and Conditions of Service". SaskPower. Retrieved December 10, 2020. 'SaskPower' means Saskatchewan Power Corporation.
  8. Champ, Joan (December 4, 2001). "Rural Electrification in Saskatchewan During the 1950s" (PDF). Western Development Museum . Retrieved November 28, 2018.
  9. Court Documents Describing Relationship between SaskPower and Swift Current Department of Light and Power
  10. "Sign In". federation3.saskatoon.ca.
  11. SaskPower 2019, p. 5.
  12. SaskPower 2019, p. 138.
  13. "SaskPower sells stake in Muskeg River Cogeneration Station". www.saskpower.com.
  14. White, Clinton O. Power for a Province: A History of Saskatchewan Power. Regina: Canadian Plains Research Center, 1976. 8.
  15. --. 14.
  16. "Board Members". www.saskpower.com. Retrieved October 19, 2019.
  17. Francoeur, Renée (April 6, 2015). "Mike Marsh named SaskPower president". www.ebmag.com. Archived from the original on March 31, 2023. Retrieved June 14, 2023.
  18. "SaskPower CEO Robert Watson resigns over smart meter controversy - CBC" . Retrieved August 11, 2023. Watson was appointed to the top job at the provincially owned power utility in 2010 after six years as CEO at SaskTel, the government's phone company.
  19. "SaskPower President and CEO Mike Marsh Announces Retirement". www.saskpower.com. October 14, 2021. Archived from the original on March 31, 2023. Retrieved June 14, 2023.
  20. Melnychuk, Mark (October 16, 2021). "SaskPower CEO Mike Marsh feels good about Crown's position on clean energy as he prepares for retirement". leaderpost.com. Archived from the original on October 16, 2021. Retrieved June 16, 2023.
  21. Douglas, Cooper (December 2, 2021). "SaskPower President and CEO Retiring at Month's End". www.westcentralonline.com. Archived from the original on March 31, 2023. Retrieved June 16, 2023.
  22. Williams, Scott (August 16, 2017). "SaskPower's Mike Marsh: A People-Centred Approach to Leadership". electricalindustry.ca. Archived from the original on March 31, 2023. Retrieved June 15, 2023.
  23. "Rupen Pandya named SaskPower's new president and CEO". industrywestmagazine.com. June 10, 2022. Archived from the original on March 31, 2023. Retrieved June 15, 2023.
  24. Zinchuk, Brian (June 10, 2022). "Rupen Pandya SaskPower's new CEO". pipelineonline.ca. Archived from the original on March 31, 2023. Retrieved June 15, 2023.
  25. "Five Questions with Rupen Pandya BA'91". www.degreesmagazine.ca. October 20, 2022. Archived from the original on March 31, 2023. Retrieved June 14, 2023.
  26. "2030 Emission Reduction Goal Progressing". www.saskpower.com. Retrieved October 19, 2019.
  27. "Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations". www.gazette.gc.ca. Retrieved October 19, 2019.
  28. "Boundary Dam Carbon Capture Project". www.saskpower.com. Retrieved October 19, 2019.
  29. "Canada Gazette, Part 2, Volume 152, Number 25: Regulations Amending the Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations". www.gazette.gc.ca. Public Works and Government Services Canada. December 12, 2018. Retrieved October 19, 2019.
  30. "Canada Gazette, Part 2, Volume 153, Number 12: Order Declaring that the Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations Do Not Apply in Saskatchewan". www.gazette.gc.ca. Public Works and Government Services Canada. June 12, 2019. Retrieved October 19, 2019.
  31. "How We're Planning for a Net-Zero Future".
  32. "Premier Outlines Plans For Affordable, Reliable Power Production".

Works cited

Further reading

Print:

Online: