Seyhan Dam

Last updated
Seyhan Dam
Seyhan Dam.jpg
Turkey relief location map.jpg
Red pog.svg
Location of Seyhan Dam in Turkey
CountryTurkey
Location Adana
Coordinates 37°02′24″N35°19′55″E / 37.04000°N 35.33194°E / 37.04000; 35.33194
StatusOperational
Construction began1953
Opening date1956
Dam and spillways
Type of dam Embankment
Impounds Seyhan River
Height53 m (174 ft)
Dam volume7,500,000 m3 (9,809,630 cu yd)
Reservoir
Total capacity750,000,000 m3 (608,035 acre⋅ft)
Surface area68 km2 (26 sq mi) [1]
Power Station
Installed capacity 59 MW
Annual generation 350 GWh

The Seyhan Dam [2] is a hydroelectric dam on the Seyhan River north of Adana, Turkey

Contents

The dam was constructed in the 1950s as the first in a series of hydroelectric projects funded by the World Bank. The project was authorized by Prime Minister Adnan Menderes. The project manager was Süleyman Demirel, [3] who later became prime minister and the ninth president of Turkey.

The ancient city of Augusta, was flooded by the Seyhan Dam Lake in 1955. [4]

See also

Related Research Articles

<span class="mw-page-title-main">Koyna River</span> River in India

The Koyna River is a tributary of the Krishna River which originates in Mahableshwar, Satara district, western Maharashtra, India. It rises near Mahabaleshwar, a famous hill station in the Western Ghats. Unlike most of the other rivers in Maharashtra which flow East-West direction, the Koyna river flows in North-South direction. The Koyna River is famous for the Koyna Dam and the Koyna Hydroelectric Project. Koyna Hydroelectric Project is the 2nd largest completed hydroelectric project in India. The reservoir – Shivasagar Lake, is a huge lake of 50 km in length.

<span class="mw-page-title-main">Keban Dam</span> Dam in Elazığ, Turkey

The Keban Dam is a hydroelectric dam on the Euphrates, located in the Elazığ Province of Turkey. The dam is the first and uppermost of several large-scale dams to be built on the Euphrates by Turkey. Although the Keban Dam was not originally constructed as a part of the Southeastern Anatolia Project (GAP), it is now a fully integrated component of the project, which aims to stimulate economic development in Southeastern Turkey. Construction of the dam commenced in 1966 and was completed in 1974. Keban Dam Lake, the reservoir created by Keban Dam, has a surface area of 675 square kilometres (261 sq mi) and is reputedly the fourth-largest lake in Turkey after Lake Van, Lake Tuz, and the reservoir created by the Atatürk Dam.

<span class="mw-page-title-main">Ilısu Dam</span> Dam in Mardin Province, Turkey

The Ilısu Dam is a concrete-face rock-fill dam on the Tigris near the village of Ilısu and along the border of Mardin and Şırnak Provinces in Turkey. It is one of the 22 dams of the Southeastern Anatolia Project and its purpose is hydroelectric power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m3 reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient Hasankeyf and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Most historical structures in Hasankeyf were moved to the new Hasankeyf prior to the filling of the dam. The dam began to fill its reservoir in late July 2019. Due to rainfall, the dam has achieved water levels up to 100m above the river bed and stored 5 billion cubic meters of water. The water level had reached an elevation of 498.2m on 1 April 2020.

<span class="mw-page-title-main">Plastiras Dam</span> Dam

The Plastiras Dam is a concrete arch dam in Karditsa regional unit, Greece that impounds the Tavropos (Megdovas) River, creating an artificial lake called Lake Plastiras.

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Palnadu, Guntur, Nalgonda, Prakasam, Khammam, Krishna, and parts of West Godavari. It is also a source of electricity generation for the national grid.

<span class="mw-page-title-main">Seyhan River</span> River in Cilicia, Turkey

<span class="mw-page-title-main">Hirakud Dam</span> Dam in Odisha, India

Hirakud Dam is built across the Mahanadi River, about 15 kilometres (9 mi) from Sambalpur in the state of Odisha in India. It is the longest earthen dam in the world. Behind the dam extends a lake, Hirakud Reservoir, 55 km (34 mi) long. It is one of the first major multipurpose river valley projects started after India's independence. Hirakud Reservoir was declared a Ramsar site on 12 October 2021.

<span class="mw-page-title-main">Mosul Dam</span> Dam in Iraq

Mosul Dam, formerly known as Saddam Dam, is the largest dam in Iraq. It is located on the Tigris river in the western governorate of Nineveh, upstream of the city of Mosul. The dam serves to generate hydroelectricity and provide water for downstream irrigation. At full capacity, the structure holds about 11.1 cubic kilometres (2.7 cu mi) of water and provides electricity to the 1.7 million residents of Mosul.

Alpaslan-1 Dam is a dam and hydroelectric power station in Muş Province, Turkey. The foundation stone for the dam was laid in 1994 and construction on the dam superstructure began in 1998. The dam began to impound its reservoir in 2008 and the first of four 40 MW generators was operational in 2009. The second was commissioned in 2012.

<span class="mw-page-title-main">Çatalan Dam</span> Dam in Turkey

Çatalan Dam is an embankment dam on the Seyhan River dam in Adana Province, Turkey. It is 22 km (14 mi) north of the city of Adana. Constructed between 1982 and 1997, the development was backed by the Turkish State Hydraulic Works.

<span class="mw-page-title-main">Çınarcık Dam</span> Dam in Mustafakemalpaşa, Bursa Province

Çınarcık Dam is a rock-fill dam on the Orhaneli River about 30 km (19 mi) east of Mustafakemalpaşa in Bursa Province, Turkey. It serves several purposes to include power, irrigation, flood control and municipal water supply to the city of Bursa. The dam was constructed between 1996 and 2002. Construction of the Uluabat Hydroelectric Station, which the dam supplies water to, began in 2006 and it was commissioned in 2010. The 125 m (410 ft) tall dam diverts water north through an 11.27 km (7.00 mi) long tunnel where it reaches the power station on the southern bank of Lake Uluabat. Water discharged from the 100 MW power station then enters the lake. The dam and power station are owned by the Turkish State Hydraulic Works.

<span class="mw-page-title-main">Kığı Dam</span> Dam in Bingöl

Kığı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.

<span class="mw-page-title-main">Tortum Dam</span> Dam in Turkey

Tortum Dam is a dam on the Tortum River in Erzurum Province, Turkey. The development, backed by the Turkish State Hydraulic Works, was built on a natural landslide near Tortum Waterfall and raises the level of the existing lake for hydroelectric power production.

The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.

<span class="mw-page-title-main">Köprü Dam</span> Dam in Kozan, Adana, Turkey

The Köprü Dam is a gravity dam on the Göksu, the main tributary of the Seyhan River about 25 km (16 mi) northwest of Kozan in Adana Province, Turkey. Its primary purpose is hydroelectric power generation. Construction began in 2009 and was complete in 2012. On 24 February 2012, the dam's diversion tunnel seal broke while the dam was impounding the river for the first time. This resulted in 97,000,000 m3 (78,639 acre⋅ft) of water flooding the downstream area of the dam. The accident and subsequent flood killed 10 workers. Downstream communities received proper warning and no one was killed.

<span class="mw-page-title-main">Arkun Dam</span> Dam in İspir, Erzurum Province

The Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) and the other downstream in Artvin Province.

The Kavşak Bendi Dam is a concrete-face rock-fill dam on the Seyhan River bordering Kozan and Aladağ districts in Adana Province, Turkey. Construction on the dam began in 2008 and the first generator was commissioned in 2013. The two remaining generators were commissioned by April 2014. The primary purpose of the dam is hydroelectric power generation. Water is sent about 2.5 km (1.6 mi) downstream where it meets the power station which contains three 59 MW Francis turbine-generators.

The Yedigöze Dam, also known as Sani Bey Dam, is a concrete-face rock-fill dam on the Seyhan River bordering İmamoğlu and Aladağ districts in Adana Province, Turkey. The primary purpose of the dam is hydroelectric power generation and irrigation. The dam's power station has an installed capacity of 320 MW and the reservoir will help irrigate 75,000 ha. Construction began in 2007 and the river was diverted by 2008. In the same year construction on the actual dam began and the reservoir began to fill on 15 June 2010. By November 2010 the remaining construction work was complete and the generators were commissioned in 2011. Construction on the irrigation works is ongoing.

The Tatar Dam is an earth-fill dam on the Peri River, near the village of Tatarköy in Kovancılar district of Elazığ Province, Turkey. Its primary purpose is hydroelectric power generation and is the sixth and last dam in the Peri River cascade, before Lake Keban. Construction on the dam began in 2008 and it began impounding its reservoir in early 2013. The power station was commissioned in late 2015. Its two generators were commissioned in February/March 2015. The 82 m (269 ft) tall dam withholds a reservoir of 299,570,000 m3 (242,870 acre⋅ft). It is owned and operated by Limak Energy and Bilgin Energy.

The Burç Bendi Dam is a gravity dam on the Göksu River, near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre⋅ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators. It is owned and operated by ČEZ Group.

References

  1. "Seyhan Dam". Turkey State Hydraulic Works. Archived from the original on 4 March 2016. Retrieved 25 February 2012.
  2. Technical Information Archived 2016-03-04 at the Wayback Machine
  3. Seyhan Dam & Reservoir Lake
  4. Ancient city comes to light as water recedes