Train path

Last updated

A train path is the infrastructure capacity needed to run a train between two places over a given time-period. [1] Within the European Union, a train operator needs to purchase a train path from a rail infrastructure company to run a train on their tracks.

Contents

Overview

The number of rail paths available on a given railway line depends on a number of factors. The number of tracks and the type of signalling, specifically the number of blocks, are limits set by the actual infrastructure. A variable factor is the speed difference between trains. Optimal capacity is achieved when all trains run at the same speed. When that is not the case, faster trains will eventually catch up to slower trains, so trains have to be spaced much further apart to avoid interference.

Applications

Usually, train operators apply for train paths over a given period several months before the start of the period. After a deadline has passed, the rail infrastructure company uses all applications to create the working timetable. A number of rail infrastructure companies have defined different classes of train paths. More expensive classes are treated with priority during timetable construction and operation.

Delayed trains

If a train is delayed beyond a certain tolerance, it will "fall out" of its allocated train path. On congested lines, this will result in additional delays, as such a train is taken to passing sidings whenever that is necessary to let other trains pass.

Graphs

Train paths are usually shown on a time-distance graph, where time is shown horizontally, and distance (including a representation of the track layout) is shown vertically.

Gothard2.gif

Related Research Articles

Rail transport in Great Britain Railway system in Great Britain

The railway system in Great Britain is the oldest railway system in the world. The first locomotive-hauled public railway opened in 1825, which was followed by an era of rapid expansion. Most of the track is managed by Network Rail, which in 2017 had a network of 15,811 kilometres (9,824 mi) of standard-gauge lines, of which 5,374 kilometres (3,339 mi) were electrified. These lines range from single to quadruple track or more. In addition, some cities have separate metro, light rail and tram systems. There are also many private railways, which are primarily short lines for tourists. The main rail network is connected with that of continental Europe by the Channel Tunnel and High Speed 1, which fully opened in 1994 and 2007 respectively.

Nederlandse Spoorwegen Dutch railways

Nederlandse Spoorwegen is a Dutch state-owned company, the principal passenger railway operator in the Netherlands. Founded in 1938, NS provides rail services on the Dutch main rail network. The Dutch rail network is the busiest in the European Union, and third busiest in the world after Switzerland and Japan.

Deutsche Bahn State-owned national railway company of Germany

The Deutsche Bahn AG is a German railway company. Headquartered in Berlin, it is a private joint-stock company (AG), with the Federal Republic of Germany being its single shareholder.

Railway signalling The principle of signals used to control railway traffic

Railway signalling is a system used to direct railway traffic and keep trains clear of each other at all times. Trains move on fixed rails, making them uniquely susceptible to collision. This susceptibility is exacerbated by the enormous weight and momentum of a train, which makes it difficult to quickly stop when encountering an obstacle. In the UK, the Regulation of Railways Act 1889 introduced a series of requirements on matters such as the implementation of interlocked block signalling and other safety measures as a direct result of the Armagh rail disaster in that year.

Căile Ferate Române Company operating railways in Romania

Căile Ferate Române is the state railway carrier of Romania. As of 2014, the railway network of Romania consists of 10,777 km (6,697 mi), of which 4,029 km (2,504 mi) (37.4%) are electrified. The total track length is 22,247 km (13,824 mi), of which 8,585 km (5,334 mi) (38.5%) are electrified. The CIA World Factbook lists Romania with the 23rd largest railway network in the world. The network is significantly interconnected with other European railway networks, providing pan-European passenger and freight services. CFR as an entity has been operating since 1880, even though the first railway on current Romanian territory was opened in 1854. CFR is divided into four autonomous companies:

East Coast Main Line railway link between London and Edinburgh and London and Leeds

The East Coast Main Line (ECML) is a 393-mile long (632 km) electrified railway between London and Edinburgh via Peterborough, Doncaster, York, Darlington, Durham and Newcastle. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road.

Rail transport operations Railway rolling stock and infrastructure

A railway has two major components: the infrastructure and the rolling stock

Polish State Railways

Polskie Koleje Państwowe S.A. is the dominant railway operator in Poland. The company was founded when the former Polskie Koleje Państwowe state-owned enterprise was divided into several units based on the need for separation between infrastructure management and transport operations. PKP S.A. is the dominant company in PKP Group collective that resulted from the split, and maintains in 100% share control, being fully responsible for the assets of all of the other PKP Group component companies. The group's organisations are dependent upon PKP S.A., but proposals for privatisation have been made.

Single-track railway Railway where trains traveling in both directions share the same track

A single-track railway is a railway where trains traveling in both directions share the same track. Single track is usually found on lesser-used rail lines, often branch lines, where the level of traffic is not high enough to justify the cost of constructing a second track.

Standards for North American railway signaling in the United States are issued by the Association of American Railroads (AAR), which is a trade association of the railroads of Canada, the US, and Mexico. Their system is loosely based on practices developed in the United Kingdom during the early years of railway development. However, North American practice diverged from that of the United Kingdom due to different operating conditions and economic factors between the two regions. In Canada, the Canadian Rail Operating Rules (CROR) are approved by the Minister of Transport under the authority of the Railway Safety Act. Each railway company or transit authority in Canada issues its own CROR rulebook with special instructions peculiar to each individual property. Among the distinctions are:

Signalling block system

Signalling block systems enable the safe and efficient operation of railways by preventing collisions between trains. The basic principle is that a route is broken up into a series of sections or "blocks". Only one train may occupy a block at a time, and the blocks are sized to allow a train to stop within them. That ensures that a train always has time to stop before getting dangerously close to another train on the same line. The block system is referred to in the UK as the method of working, in the US as the method of operation, and in Australia as safeworking.

Rail transport in the Netherlands

Rail transport in the Netherlands uses a dense railway network which connects nearly all major towns and cities. There are as many train stations as there are municipalities in the Netherlands. The network totals 3,223 route km on 6,830 kilometres of track; a line may run both ways, or two lines may run on major routes. Three-quarters of the lines have been electrified.

East Midlands Trains Stagecoach Group-owned train operating company in England

East Midlands Trains (EMT) was a British train operating company owned by the transport group Stagecoach, which operated the East Midlands franchise between November 2007 and August 2019.

Rail transport in Morocco

Rail transport in Morocco is operated by the national railway operator ONCF. It was initially developed during the protectorate.

Rail transport in Poland

The Polish railways network consists of around 18,510 kilometres (11,500 mi) of track as of 2015, of which the vast majority is electrified at 3 kV DC overhead.

In public transportation, schedule adherence or on-time performance refers to the level of success of the service remaining on the published schedule. On time performance, sometimes referred to as on time running, is normally expressed as a percentage, with a higher percentage meaning more vehicles are on time. The level of on time performance for many transport systems is a very important measure of the effectiveness of the system.

Public transport bus services are generally based on regular operation of transit buses along a route calling at agreed bus stops according to a published public transport timetable.

Public transport Shared transportation service for use by the general public

Public transport is a system of transport, in contrast to private transport, for passengers by group travel systems available for use by the general public, typically managed on a schedule, operated on established routes, and that charge a posted fee for each trip. Examples of public transport include city buses, trolleybuses, trams and passenger trains, rapid transit and ferries. Public transport between cities is dominated by airlines, coaches, and intercity rail. High-speed rail networks are being developed in many parts of the world.

Arriva Rail North British railway company

Arriva Rail North was a train operating company in Northern England which began operating the Northern franchise on 1 April 2016 and inherited units from the previous operator Northern Rail. A subsidiary of Arriva UK Trains, Northern was the largest train franchise in the United Kingdom in terms of the size of the network and the number of weekly services run. Its trains called at 528 stations, about a quarter of all stations in the country; of these stations 476 were operated by Northern. On 1 March 2020, Arriva Rail North Limited ceased to operate and all operations were handed to HM Government's Operator of Last Resort.

Route capacity Vehicles or people on a given route in a given time

Route capacity is the maximum number of vehicles, people, or amount of freight than can travel a given route in a given amount of time, usually an hour. It may be limited by the worst bottleneck in the system, such as a stretch of road with fewer lanes. Air traffic route capacity is affected by weather. For a metro or a light rail system, route capacity is generally the capacity of each vehicle, times the number of vehicles per train, times the number of trains per hour (tph). In this way, route capacity is highly dependent on headway. Beyond this mathematical theory, capacity may be influenced by other factors such as slow zones, single-tracked areas, and infrastructure limitations, e.g. to useful train lengths.

References

  1. Definition from Directive 2001/14/EC, Article 2 (l), of the European Parliament and of the Council