TransAlta

Last updated
TransAlta Corporation
Type Public
TSX:  TA
NYSE:  TAC
Industry Power generation
Founded1911
Headquarters Calgary, Alberta, Canada
Key people
John Kousinioris (President and CEO), John P. Dielwart (Board Chair) Appt’d April 21, 2020
Products Power Generation (8,128 MW aggregate generating capacity).
Revenue CA$ 2.1 billion (2020)
Total assets CA$9.7 billion (2020)
Number of employees
1,476 (Dec. 31, 2020)
Website www.transalta.com

TransAlta Corporation (formerly Calgary Power Company, Ltd.) is an electricity power generator and wholesale marketing company headquartered in Calgary, Alberta, Canada. It is a privately owned corporation and its shares are traded publicly. It operates 76 power plants in Canada, the United States, and Australia. TransAlta operates wind, hydro, natural gas, and coal power generation facilities. The company has been recognized for its leadership in sustainability by the Dow Jones Sustainability North America Index, the FTSE4Good Index, and the Jantzi Social Index. TransAlta is Canada's largest investor-owned renewable energy provider.[ citation needed ]

Contents

The company is not without controversy, as the Alberta Utility Commission ruled in 2015 that TransAlta manipulated the price of electricity when it took outages at its Alberta coal-fired generating units in late 2010 and early 2011. [1]

TransAlta operated Canada's largest surface strip coal mine from 1970 until 2021 through its subsidiary company Sunhills Mining. The 12,600 hectare mine produced 13 million tonnes of thermal grade coal a year. The company announced that it would be decommission the Highvale mine by 2021. [2]

On November 2, 2023, it was announced that TransAlta bought Heartland Generation (the third largest electricity generation company at the time) for $658 million. The purchase means that TransAlta now controls 46% of the electricity generation market in Alberta - a development that has been criticized by numerous academics and industry officials as "a catastrophe" and likely to lead to economic withholding. [3] [4]

History

In 1909, TransAlta began the planning and construction of the Horseshoe Falls Hydro Plant in Seebe, Alberta. Two years later, Calgary Power Company, Ltd. was born.

That first dam was built by a crew of about 200 with primitive tools such as picks and wheelbarrows. It initially had a 10 MW capacity (13,500 horsepower). [5] A second dam was commissioned in 1913 at Kananaskis Falls and was built by close to 500 workers.

At the time, streetcars were responsible for a significant share of Calgary's electrical load. Residential power was just being introduced, and many homes were lit for the first time with electrical lamps because of Calgary Power. Calgary Power's cheap energy is credited with Canadian Pacific Railway's decision to locate its regional engine repair shop in Ogden, Calgary, spurring the city's economic development. [6]

Notable leaders from the company's early years included W. Max Aitken (later known as Lord Beaverbrook) and R.B. Bennett, who went on to become Canada's Prime Minister from 1930 to 1935.

The company's monopoly position and behaviour made its status as a private corporation unpopular among rural customers and some Calgary residents, and a move to nationalize it was converted to a province-wide referendum in 1948, which came down very narrowly on the side of maintaining its private ownership.

In 1981, the company changed its name to its current name of TransAlta Corporation.

At the end of 2010, TransAlta became the first company to own and operate more than 1,000 MW of installed wind capacity in Canada—almost 30 per cent of the country's total.

TransAlta has gradually been transitioning its energy-generating facilities away from coal, due to adverse environmental effects, towards natural gas. Its last remaining operational coal mine, in Highvale, AB, will cease mining operations on December 31, 2021, and transition to mine reclamation in the years to follow. [7]

Governance

As of November 2023, TransAlta's Corporate Officers/Senior Managers are:

NamePositionBackground
John KousiniorisPresident/CEOFormer Partner at Bennett Jones.
Todd StackCFO/EVP
Jane N. FedoretzCAO/EVPFormerly Legal Counsel for Blake, Cassels, & Graydon, Petro-Canada, and CEDA International Corporation.
Kerry O'Reilly WilksEVPFormer Partner at Davies Ward Phillips & Vineberg, Head of Legal at Vale Canada, Director of Ontario Chamber of Commerce, and Director of The Giles School.
Chris FralickEVPFormer COO at Ontario Power Generation, President/CEO of Atura Power, and Board Chair at Confederation College.
Aron WillisEVP
Blaine van MelleEVP
Scott JeffersEVPFormer Associate at Bennett Jones.
Brent WardSVP/CFO
Michelle CameronManaging DirectorFormer Senior Manager at PwC and VP at Walton Group of Companies.
David LittleSVPFormer VP at Innergex Renewable Energy, Senior Director at Enel Green Power, SVP at Padoma Wind Power, and Managing Director at Catamount Energy.

As of November 2023, TransAlta's Board of Directors consisted of:

NameBackground
Rona Ambrose Former Interim-Leader of the Conservative Party of Canada, Cabinet Minister under Stephen Harper including Minister of the Environment (as which she pulled Canada out of the Kyoto Protocol); former Member of the Trilateral Commission, Board Member of Juul, [8] Member of the Advisory Council on NAFTA, Global Fellow at the Wilson Centre Canada Institute, and Deputy Chair of TD Securities.
John P. DielwartFormer CEO of ARC Resources and Board Chair of Canadian Association of Petroleum Producers.
Alan J. FohrerFormer CEO of Southern California Edison, President/CEO of Edison Mission Energy (filed for Chapter 11 Bankruptcy in 2012, and was bought out by NRG Energy), Director at Institute of Nuclear Power Operations, Advisor at Schneider Electric, Director at Osmose, Director at MWH Global (bought by Stantec in 2016), Director at Synagro, Director at Blue Shield of California, and Director at PNM Resources.
Laura W. FolseFormer CEO/EVP at BP Wind Energy North America and led the clean-up team for the Deepwater Horizon oil spill, the largest marine oil spill in global history.
Harry GoldgutFormer CEO of Brookfield Renewable Power/Infrastructure Groups and Director at Isagen S.A. ESP (bought by Brookfield Corporation in 2016).
John Kousinioris
Candace MacGibbonFormer President/CEO at INV Metals Inc., former global mining institutional equity sales at RBC Capital Markets, former equity research associate at BMO Capital Markets, Board Member at Osisko Gold Royalties, and Incoming President-Elect (2023-24) at Canadian Institute of Mining, Metallurgy and Petroleum.
Thomas M. O'FlynnFormer CEO/EVP at AES Corporation, Senior Advisor/COO at Blackstone Inc., EVP/CFO at Public Service Enterprise Group Incorporated, Head of North America Power at Morgan Stanley, and Senior Advisor for Energy Impact Partners.
Bryan D. PinneyLead Director for North American Construction Group Ltd., Director at Sundial Growers Inc., former Board of Governors Chair of Mount Royal University, Calgary Managing Partner at Arthur Andersen (the firm collapsed in 2002 due to its involvement in the Enron scandal), Vice-Chair at Deloitte Canada, Chair of Calgary Petroleum Club.
James ReidFormer Managing Partner/CIO at Brookfield Private Equity Group in Calgary and Brookfield Infrastructure Group.
Manjit SharmaFormer CFO/Chair of Pension Trust at General Electric Canada, CFO at WSP Canada Inc., Board Member at Export Development Canada, Board Member at Vermilion Energy, and Board Member at Finning.
Sandra SharmanHead of HR/Communications/Marketing/Enterprise Real Estate at CIBC.
Sarah A. SlusserCEO of Cypress Creek Renewables, LLC, Founder of Point Reyes Energy Partners LLC, Co-Founder of GeoGlobal Energy LLC, and SVP at AES Corporation.

Ghost River Reservoir

Since the 2013 Alberta floods, as a temporary partial solution to mitigate flood damage during those months when there is a greater risk of rising water that might cause flooding, the Government of Alberta entered into an agreement with TransAlta to manage water on the Bow River at its Ghost Reservoir facility. This was extended in 2016 with a new five-year agreement that included water management of its Kananaskis Lakes system (which includes Interlakes, Pocaterra and Barrier) for drought mitigation.

Controversies

On March 21, 2014, the Alberta Market Surveillance Administrator (MSA) filed an application with the Alberta Utilities Commission (AUC) alleging TransAlta manipulated the price of electricity when it took outages at its Alberta coal-fired generating units in late 2010 and early 2011. While TransAlta disputed the MSA's allegations, the AUC ruled TransAlta's actions in relation to four outage events spanning 11 days in 2010 and 2011 restricted or prevented a competitive response from the associated Power Purchase Agreement (PPA) buyers and manipulated market prices away from a competitive market outcome. On Sept. 30, 2015, TransAlta and the province's MSA reached an agreement to settle all outstanding proceedings before the AUC. The settlement, which is in the form of a consent order, was approved by the AUC on Oct. 29, 2015. [9]

Under the terms of the agreement, TransAlta paid a total amount of (CDN) $56 million that included approximately $27 million as a repayment of economic benefit, approximately $4 million to cover the MSA's legal and related costs, and a $25 million administrative penalty. As part of the settlement agreement, TransAlta agreed to discontinue its court appeal of the AUC's decision concerning the four outage events.TransAlta's legal appeal came as a result of the AUC's determination in its ruling that the “MSA did not prove, on the balance of probabilities, that the company breached applicable legislation on the basis that its compliance policies, practices, and oversight thereof, were inadequate and deficient.”

In response to the dispute regarding its understanding of Alberta market rules governing forced outages, TransAlta implemented two independent, third-party reviews of its compliance procedures. The results of the reviews by McCarthy Tétrault [10] and PricewaterhouseCoopers LLP [11] were publicly released, including recommendations for improvement.

In 2016, it was revealed that TransAlta gave $54,000 to University of Alberta professor Warren Kindzierski to research the health impacts of coal-fired plants near Edmonton. The study concluded that 'the high number of coal-fired power plants near the city of Edmonton doesn't negatively impact the health of local residents,' and was used by TransAlta as 'scientific backing' to push for an alternative to Alberta's then-plan to phase out coal by 2030. Between 2013 and 2015, TransAlta provided an additional $175,000 to the University of Alberta in sponsorship agreements for research and academic projects. The incident was highlighted by members of the university's Corporate Mapping Project for exemplifying the deeper issue of undisclosed corporate funding and influence in academic research in Canada. [12]

Hydro facilities in British Columbia

Upper Mamquam, built by Canadian Hydro Developers and operational since 2005, is a run-of-the-river hydroelectric plant 5 km northeast of Squamish, BC. The penstock is 1.6 km long, dropping 120 meters to the powerhouse containing two 12.5 MW Pelton wheel generators. [13] [14]

Bone Creek a hydroelectric plant constructed in 2011, has a 5 km penstock dropping 148 meters to a powerhouse with two 9.6MW Francis turbines. It is located 90 km south of Valemount, BC and operated by Valisa Energy Inc. Approximately 72 GWh of power annually is sold to BC Hydro. [15]

Akolkolex, built by Canadian Hydro Developers and operational since 1995, uses two Francis turbines in a 10 MW run-of-river hydroelectric plant discharging into Arrow Lakes. It is located 25 km SE of Revelstoke, B.C. The plant produces approximately 37 GWh of electricity annually. [16]

Pingston Creek has a 12 meter high sheetpile rock-fill dam which diverts water to the western shore of Arrow Lakes. It was built by Canadian Hydro Developers and Brascan Power and began operation as Pingston Power Inc. in 2003. A 4 km tunnel achieves a huge drop of 557 meters to three 15 MW Pelton wheels to generate about 200 GWh annually. [17] The project is 53 km south of Revelstoke, BC.

Energy generation summary

TransAlta hydroelectric plant at the Spray Lakes Reservoir, Kananaskis Country, Alberta Spray River just below the Three Sisters Dam.jpg
TransAlta hydroelectric plant at the Spray Lakes Reservoir, Kananaskis Country, Alberta

Net Capacity Owned by Fuel Type
(in operation and in development 2021)

TypeNet Capacity
Coal28%
Gas35%
Wind/Solar24%
Hydro13%

Net Capacity Owned by Geography
(in operation and development)

GeographyNet Capacity
Canada80%
United States14%
Australia6%

See also

Related Research Articles

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Emera</span> Canadian energy company

Emera Incorporated is a publicly traded Canadian multinational energy holding company based in Halifax, Nova Scotia. Created in 1998 during the privatization of Nova Scotia Power, a provincial Crown corporation, Emera now invests in regulated electricity generation as well as transmission and distribution across North America and the Caribbean.

<span class="mw-page-title-main">Manitoba Hydro</span> Electric power and natural gas utility company in Manitoba, Canada

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.

<span class="mw-page-title-main">Hydro One</span> Electricity transmission and distribution utility serving in Ontario, Canada

Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario. In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.

<span class="mw-page-title-main">Duke Energy</span> American electrical power and natural gas company

Duke Energy Corporation is an American electric power and natural gas holding company headquartered in Charlotte, North Carolina.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

Saskatchewan Power Corporation, operating as SaskPower, is the principal electric utility in Saskatchewan, Canada. Established in 1929 by the provincial government, it serves more than 538,000 customers and manages over $11.8 billion in assets. SaskPower is a major employer in the province with over 3,100 permanent full-time staff located in approximately 70 communities.

<span class="mw-page-title-main">Enmax</span> Calgary, Alberta municipal energy utility

Enmax Corporation is a vertically integrated utility with operations across Alberta, Canada, and in Maine, U.S. Through its subsidiaries, ENMAX Power Corporation and Versant Power, ENMAX owns and operates transmission and distribution utilities that deliver electricity to customers in Calgary, Alberta, and northern and eastern Maine. Through ENMAX Energy Corporation, ENMAX owns and operates power generation facilities and offers electricity and natural gas products and services to residential, commercial and industrial customers across Alberta.

<span class="mw-page-title-main">Energy policy of Canada</span> About Canadas federal and provincial energy policies

Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.

Whitewood is a closed Canadian coal mine in Alberta just north of Lake Wabamun, about sixty-five kilometres west of Edmonton, Alberta. Owned by the TransAlta Corporation of Calgary, the mine was run by Luscar Ltd. (Edmonton) since that company acquired the extraction contract from Fording Coal Ltd. (Calgary) in 2003 until closure in 2010.

Through the 1996 Electric Utilities Act the Alberta's deregulated electricity market began.

Natural gas was Canada's third largest source of energy production in 2018, representing 22.3% of all energy produced from fuels in the country. By contrast, the share of fuel-based energy production from natural gas in 2013 was 17.0%, indicating a growth rate of approximately 1.06% per year.

<span class="mw-page-title-main">Greengate Power Corporation</span>

Greengate Power Corporation (Greengate) is a Canadian energy company focused on renewable energy in Alberta. Greengate's focus in the past was in large, utility scale wind projects and has recently developed solar projects.

<span class="mw-page-title-main">Capital Power</span> Canadian power generation

Capital Power is a North American independent power generation company based in Edmonton, Alberta, Canada. It develops, acquires, owns and operates power generation facilities using a variety of energy sources.

<span class="mw-page-title-main">Alberta Electric System Operator</span>

The Alberta Electric System Operator (AESO) is the non-profit organization responsible for operating Alberta, Canada's power grid. AESO oversees the planning and operation of the Alberta Interconnected Electric System (AIES) in a "safe, reliable, and economical" manner. It is mandated by provincial legislation to act in the public interest and cannot own any transmission, distribution or generation assets.

AltaLink, L.P. is one of Canada's largest electricity transmission companies. Based in Alberta, AltaLink is responsible for the maintenance and operation of approximately 12,000 kilometres of transmission lines and 280 substations in Alberta. AltaLink is owned by Berkshire Hathaway Energy.

<span class="mw-page-title-main">NTPC Limited</span> National Thermal Power Corporation, Central Public Sector Undertaking

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">Electricity sector in the Philippines</span> Overview of the electricity sector in the Philippines

The electricity sector in the Philippines provides electricity through power generation, transmission, and distribution to many parts of the country. The Philippines is divided into three electrical grids, one each for Luzon, the Visayas and Mindanao. As of June 2016, the total installed capacity in the Philippines was 20,055 megawatts (MW), of which 14,348 MW was on the Luzon grid. As of June, 2016, the all-time peak demand on Luzon was 9,726 MW at 2:00 P.M. on May 2, 2016; on Visayas was 1,878 MW at 2:00 P.M. on May 11, 2016; and on Mindanao was 1,593 MW at 1:35 P.M. on June 8, 2016. However, about 12% of Filipinos have no access to electricity. The Philippines is also one of the countries in the world that has a fully functioning electricity market since 2006 called the Philippine Wholesale Electricity Spot Market(WESM) and is operated by an independent market operator.

References

Citations

  1. Alberta Utilities Commission (July 27, 2015). "Market Surveillance Administrator allegations against TransAlta Corporation (Phase 1)" (PDF). Alberta Utilities Commission.
  2. Johnson, Lisa (4 November 2020). "TransAlta to end coal mining operations at Highvale in 2021, stop using coal in Canada". The Edmonton Journal. Retrieved 16 January 2024.
  3. Kinney, Duncan (November 27, 2023). "Proposed Transalta acquisition mean your electricity bills are somehow going to get even worse". Progress Report. Retrieved November 27, 2023.
  4. Varcoe, Chris (November 2, 2023). "Alberta power market shakeup, as TransAlta buys Heartland Generation for $658M". Calgary Herald. Postmedia. Retrieved November 27, 2023.
  5. Jennings, A. Owen (1911). Merchants and manufacturers record of Calgary. Calgary: Jennings Publishing Company. p. 85.
  6. Foran, Max (1982). Calgary, Canada's frontier metropolis : an illustrated history. Windsor Publications. p.  76. ISBN   0-89781-055-4.
  7. 1 2 Johnson, Lisa (20 November 2020). "TransAlta to end coal mining operations at Highvale in 2021, stop using coal in Canada". The Edmonton Journal. Retrieved 20 November 2020.
  8. Rieger, Sarah. "Rona Ambrose, Canada's former health minister, joins e-cigarette company Juul's board of directors". CBC. Retrieved November 27, 2023.
  9. Alberta Utilities Commission (October 29, 2015). "Market Surveillance Administrator allegations against TransAlta Corp. et al. (Phase 2 – Request for Consent Order)" (PDF). Alberta Utilities Commission.
  10. McCarthy Tétrault LLP (April 15, 2016). "Review by McCarthy Tétrault of the TransAlta Outage Practices" (PDF). TransAlta. George Vegh, McCarthy Tétrault LLP.
  11. PricewaterhouseCoopers LLP (April 2016). "TransAlta Corp. Energy Compliance Program Assessment" (PDF). TransAlta Corp.
  12. Linnitt, Carol. "When Coal Companies Fund Public Health Research: The Case of TransAlta and the University of Alberta". The Narwhal. Retrieved November 27, 2023.
  13. "Archived copy". Archived from the original on 2009-07-19. Retrieved 2015-08-16.{{cite web}}: CS1 maint: archived copy as title (link)
  14. "Upper Mamquam". TransAlta. Retrieved 2022-05-13.
  15. "Bone Creek". TransAlta. Retrieved 2022-05-13.
  16. "Akolkolex". TransAlta. Retrieved 2022-05-13.
  17. "Pingston – Canadian Projects". canprojects.com.

Sources