USS Bonita (SS-165)

Last updated

USSBonitaSS165.jpg
History
US flag 48 stars.svgUnited States
Builder Portsmouth Naval Shipyard, Kittery, Maine [1]
Laid down16 November 1921 [1]
Launched9 June 1925 [1]
Commissioned22 May 1926 [1]
Decommissioned4 June 1937 [1]
Commissioned5 September 1940 [1]
Decommissioned3 March 1945 [1]
Stricken10 March 1945 [1]
FateSold for breaking up, 4 October 1945 [1]
General characteristics
Class and type V-1 (Barracuda)-class composite direct-drive diesel and diesel-electric submarine [2]
Displacement2,119 tons (2,153 t) surfaced, [3] 2,506 tons (2,546 t) submerged [3]
Length341 ft 6 in (104.09 m) [3]
Beam27 ft 6+58 in (8.398 m) [3]
Draft15 ft 2 in (4.62 m) [3]
Propulsion
Speed21 knots (39 km/h) surfaced, [3] 9 knots (17 km/h) submerged [3]
Range6,000 nautical miles (11,000 km) @ 11 knots (20 km/h), [3] 11,000 nautical miles (20,000 km) @ 11 kn with fuel in main ballast tanks [3]
Endurance10 hours @ 5 knots (9 km/h) [3]
Test depth200 ft (60 m) [3]
Complement7 officers, 11 petty officers, 69 enlisted [3]
Armament

USS Bonita (SF-6/SS-165), a Barracuda-class submarine and one of the "V-boats," was the third ship of the United States Navy to be named for the bonito. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 9 June 1925 as V-3 (SF-6), sponsored by Mrs. L.R. DeSteiguer, wife of Rear Admiral DeSteiguer, and commissioned on 22 May 1926, Lieutenant Commander Charles A. Lockwood, Jr. in command. Like her sisters, Bonita was designed to meet the fleet submarine requirement of 21 knots (39 km/h) surface speed for operating with contemporary battleships.

Contents

Engineering

V-3 was completed with two Busch-Sulzer direct-drive 6-cylinder 2-cycle main diesel engines of 2,250 hp (1,680 kW) each, [4] [5] along with two Busch-Sulzer auxiliary diesel engines of 1,000 hp (750 kW) each, driving electrical generators. The latter were primarily for charging batteries, but to reach maximum surfaced speed, they could augment the mechanically coupled main-propulsion engines by driving the 1,200 hp (890 kW) electric motors in parallel via an electric transmission. Although it wasn't until about 1939 that its problems were solved, electric transmission in a pure diesel-electric arrangement became the propulsion system for the successful fleet submarines of World War II, the Tambor-class through the Tench-class. Prior to recommissioning in 1940, the auxiliary diesels were replaced with two BuEng Maschinenfabrik Augsburg Nürnberg AG (MAN-designed) 6-cylinder 4-cycle diesel engines of 1,000 hp (750 kW) each. [4] [5] In 1942-43 Bonita was converted to a cargo submarine, with the main engines removed to provide cargo space, significantly reducing her speed on the remaining auxiliary diesels. [6]

Service history

Interwar period

Assigned to Submarine Division 20 (SubDiv 20), V-3 cruised along the East Coast and in the Caribbean Sea until November 1927. With her division, she then transferred to the Pacific Fleet, arriving at San Diego, California, on 17 December 1927. After service with SubDivs 12 and 20 along the Pacific coast and off Hawaii, she joined SubDiv 15 of the Rotating Reserve at Mare Island Navy Yard on 1 June 1932. During this period her 5 inch (127 mm)/51 caliber deck gun was replaced by a 3 inch (76 mm)/50 caliber weapon. [8] She was renamed Bonita on 9 March 1931 and given hull classification symbol SS-165 on 1 July 1931.

Bonita rejoined SubDiv 12 in September 1933 and cruised in Caribbean Sea, West Coast, and Hawaiian waters through 1936. She departed San Diego, California on 20 January 1937 and arrived at Philadelphia Navy Yard on 18 February. She was placed out of commission in reserve at Philadelphia, Pennsylvania on 4 June 1937.

World War II

Recommissioned on 5 September 1940, she departed New London, Connecticut on 17 November for Coco Solo, Panama Canal Zone. Bonita patrolled in the Pacific, off Panama, until she returned to Philadelphia for overhaul in October 1942. At this time she was converted to a cargo submarine with the removal of her main engines, severely restricting her speed on the auxiliary engines. [9]

Patrolling off the Maine coast until mid-1943, she then joined Submarine Squadron 1 (SubRon 1), SubDiv 13, on training duty out of New London. She remained on that duty until February 1945. Arriving at Philadelphia Navy Yard on 17 February, she was decommissioned 3 March and sold 28 October 1945.

Awards

Related Research Articles

USS <i>Dolphin</i> (SS-169) "V-boat" class submarine

USS Dolphin (SF-10/SC-3/SS-169), a submarine and one of the "V-boats", was the sixth ship of the United States Navy to be named for that aquatic mammal. She also bore the name V-7 and the classifications SF-10 and SC-3 prior to her commissioning. She was launched on 6 March 1932 by the Portsmouth Navy Yard, sponsored by Mrs. E.D. Toland, and commissioned on 1 June 1932.

USS <i>Chicago</i> (1885) Protected cruiser of the US Navy

The first USS Chicago was a protected cruiser of the United States Navy, the largest of the original three authorized by Congress for the "New Navy" and one of the U.S. Navy's first four steel ships.

USS <i>Barracuda</i> (SS-163) Submarine of the United States

USS Barracuda (SF-4/SS-163), lead ship of her class and first of the "V-boats," was the second ship of the United States Navy to be named for the barracuda.

USS <i>Argonaut</i> (SM-1) Submarine of the United States

USS Argonaut (V-4/SF-7/SM-1/A-1/APS-1/SS-166) was a submarine of the United States Navy, the first boat to carry the name. Argonaut was laid down as V-4 on 1 May 1925 at Portsmouth Navy Yard. She was launched on 10 November 1927, sponsored by Mrs. Philip Mason Sears, the daughter of Rear Admiral William D. MacDougall, and commissioned on 2 April 1928. Although never officially designated as "SS-166", at some point she displayed this number on her conning tower.

USS <i>Nautilus</i> (SS-168) Submarine of the United States

USS Nautilus (SF-9/SS-168), a Narwhal-class submarine and one of the "V-boats", was the third ship of the United States Navy to bear the name.

<i>Balao</i>-class submarine US Navy submarine class of World War II

The Balao class was a design of United States Navy submarine used during World War II, and with 120 boats completed, the largest class of submarines in the United States Navy. An improvement on the earlier Gato class, the boats had slight internal differences. The most significant improvement was the use of thicker, higher yield strength steel in the pressure hull skins and frames, which increased their test depth to 400 feet (120 m). Tang actually achieved a depth of 612 ft (187 m) during a test dive, and exceeded that test depth when taking on water in the forward torpedo room while evading a destroyer.

USS <i>Marlin</i> (SS-205) Submarine of the United States

USS Marlin (SS-205), a Mackerel-class submarine, was the first ship of the United States Navy to be named for the marlin, a large game fish. Marlin and her near-sister Mackerel were prototype small submarines, which the Navy was exploring to replace the aging S-class submarines. References differ as to whether Marlin had a direct drive propulsion system or diesel-electric drive.

V-boat Group of U.S. Navy submarines and classes derived from them

The V-boats were a group of nine United States Navy submarines built between World War I and World War II from 1921 to 1934 under authorization as the "fleet boat" program.

USS <i>Bass</i> (SS-164) Submarine of the United States

USS Bass (SF-5/SS-164), a Barracuda-class submarine and one of the "V-boats", was the first ship of the United States Navy to be named for the bass.

USS <i>Cachalot</i> (SS-170) Submarine of the United States

USS Cachalot (SC-4/SS-170), a United States Navy submarine and the lead ship of her class, known as the "V-boats", was the only ship of the United States Navy to be named for the sperm whale. Her keel was laid down by the Portsmouth Navy Yard. She was launched on 19 October 1933 as V-8 (SC-4) sponsored by Miss K. D. Kempff, and commissioned on 1 December 1933 with Lieutenant Commander Merril Comstock in command. Cachalot was the first submarine to have the Torpedo Data Computer, Arma Corporation's Mark 1, installed.

USS <i>Cuttlefish</i> (SS-171) Submarine of the United States

USS Cuttlefish (SC-5/SS-171), a Cachalot-class submarine and one of the "V-boats," was the second ship of the United States Navy to be named for the cuttlefish. Her keel was laid down by Electric Boat Company in Groton, Connecticut. She was launched on 21 November 1933 sponsored by Mrs. B. S. Bullard, and commissioned on 8 June 1934, Lieutenant Commander Charles W. "Gin" Styer in command. Cuttlefish was the first submarine built entirely at Electric Boat's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts. Four Peruvian R-class submarines had previously been finished in Groton, using material from cancelled S-boats salvaged from Fore River.

<i>Tambor</i>-class submarine US Navy submarine class of World War II

The Tambor-class submarine was a United States Navy submarine design, used primarily during World War II. They were the USN's first fully successful fleet submarine, and began the war close to the fighting. Six of the class were in Hawaiian waters or the Central Pacific on 7 December 1941, with Tautog at Pearl Harbor during the attack. They went on to see hard service; seven of the twelve boats in the class were sunk before the survivors were withdrawn from front-line service in early 1945; this was the highest percentage lost of any US submarine class. Tautog was credited with sinking 26 ships, the largest number of ships sunk by a US submarine in World War II. The Tambors attained the top speed of 21 knots (39 km/h) and range of 11,000 nautical miles (20,000 km) of the preceding Sargo class, and improvements included six bow torpedo tubes, a more reliable full diesel-electric propulsion plant, and improved combat efficiency with key personnel and equipment relocated to the conning tower. In some references, the Tambors are called the "T Class", and SS-206 through SS-211 are sometimes called the "Gar class".

<i>Sargo</i>-class submarine US Navy submarine class of World War II

The Sargo-class submarines were among the first United States submarines to be sent into action after the Japanese attack on Pearl Harbor, starting war patrols the day after the attack, having been deployed to the Philippines in late 1941. Similar to the previous Salmon class, they were built between 1937 and 1939. With a top speed of 21 knots, a range of 11,000 nautical miles (20,000 km), and a reliable propulsion plant, along with the Salmons they were an important step in the development of a true fleet submarine. In some references, the Salmons and Sargos are called the "New S Class", 1st and 2nd Groups.

<i>AA-1</i>-class submarine Class of three experimental submarines of the United States Navy,

The AA-1 class was a class of three experimental submarines of the United States Navy, built toward the end of World War I, between 1916 and 1919, intended to produce a high-speed fleet submarine. The design was not a success and none of the submarines saw active service. However, the lessons learned were applied to the design of the later V-boats. The class was later renamed as the T class.

United States <i>Porpoise</i>-class submarine Class of US Navy submarine

The Porpoise class were submarines built for the United States Navy in the late 1930s, and incorporated a number of modern features that would make them the basis for subsequent Salmon, Sargo, Tambor, Gato, Balao, and Tench classes. In some references, the Porpoises are called the "P" class.

USS <i>Sea Poacher</i> Submarine of the United States

USS Sea Poacher (SS/AGSS-406), a Balao-class submarine, was a vessel of the United States Navy named for the sea poacher, a slender, mailed fish of the North Atlantic.

USS <i>M-1</i> M-class submarine of the United States

USS M-1 (SS-47) was a unique submarine of the United States Navy. M-1 was designed as a test bed for the newest technology in submarine construction and design. As well as being the world's first double-hulled design, her battery was of a new design and was to have solved some of the past flaws. While no other M-class submarines were built, the lessons learned were incorporated into the following AA-1 class.

<i>Mackerel</i>-class submarine Submarine class

The Mackerel-class submarines were a pair of experimental prototype submarines built just prior to World War II and launched in 1940 and 1941. The two submarines were similar in size and capability to the S-class submarines built at the end of World War I, and had been ordered to test the feasibility of using mass production techniques to build small submarines. Until at least 1940 it was thought that mass production of fleet submarines would be impractical, and in any case small submarines could provide area defense for submarine bases. Once it became apparent that there would be sufficient production of the more capable Gato-class submarines, interest in the design waned and no additional small submarines were ordered. Submarine production standardized during the war on the Gato class and its successors, the Balao and Tench-class submarines. In some references, the Mackerels are called the "M class".

<i>Cachalot</i>-class submarine Pair of US Navy submarines, 1933 to 1945

The Cachalot-class submarines were a pair of medium-sized submarines of the United States Navy built under the tonnage limits of the London Naval Treaty of 1930. They were originally named V-8 and V-9, and so were known as "V-boats" even though they were unrelated to the other seven submarines constructed between World War I and World War II. An extensive study was conducted to determine the optimum submarine size under the treaty restrictions, factoring in total force, endurance, and percentage of the force that could be maintained on station far from a base, as in a Pacific war scenario. Joseph W. Paige of the Navy's Bureau of Construction and Repair (BuC&R) developed the basic design, but the builder, Electric Boat, was responsible for detailed arrangement; this was fairly bold, since Electric Boat had not built any new submarines since finishing four obsolescent boats for Peru. The previous V-boats were all built in naval shipyards. Cuttlefish was the first submarine built at EB's facility in Groton, Connecticut; construction of previous Electric Boat designs had been subcontracted to other shipyards, notably Fore River Shipbuilding of Quincy, Massachusetts.

USS Semmes (DD-189/AG-24) was a Clemson-class destroyer in the United States Navy during World War II. She was the first Navy ship named for Commander (USN), Rear Admiral (CSN), Brigadier General (CSA) Raphael Semmes (1809–1877).

References

  1. 1 2 3 4 5 6 7 8 9 Friedman, Norman (1995). U.S. Submarines Through 1945: An Illustrated Design History. Annapolis, Maryland: United States Naval Institute. pp. 285–304. ISBN   1-55750-263-3.
  2. 1 2 Bauer, K. Jack; Roberts, Stephen S. (1991). Register of Ships of the U.S. Navy, 1775–1990: Major Combatants. Westport, Connecticut: Greenwood Press. p. 265. ISBN   0-313-26202-0.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 U.S. Submarines Through 1945 pp. 305–311
  4. 1 2 3 4 U.S. Submarines Through 1945 pp. 111–113
  5. 1 2 3 4 U.S. Submarines Through 1945 pp. 257–259
  6. 1 2 Alden, John D., Commander, USN (retired). The Fleet Submarine in the U.S. Navy (Annapolis, MD: Naval Institute Press, 1979), p.210.
  7. Alden, p.211.
  8. Gardiner and Chesneau, pp. 141-142
  9. U.S. Submarines Through 1945 p. 114