USS Guitarro (SSN-665)

Last updated

USS Guitarro (SSN-665).jpg
USS Guitarro (SSN-665) off San Francisco, California
History
Flag of the United States.svgUnited States
NameUSS Guitarro
NamesakeThe guitarro, a ray of the guitarfish family
Ordered18 December 1964
Builder Mare Island Naval Shipyard, Vallejo, California
Laid down9 December 1965
Launched27 July 1968
Sponsored byMrs. John M. Taylor
Commissioned9 September 1972
Decommissioned29 May 1992
Stricken29 May 1992
Nickname(s)"Mare Island Mud Puppy"
FateScrapping via Ship and Submarine Recycling Program completed 18 October 1994
General characteristics
Class and type Sturgeon-class submarine
Displacement
  • 3,860 long tons (3,922 t) light
  • 4,268 long tons (4,336 t) full
  • 408 long tons (415 t) dead
Length292 ft 3 in (89.08 m)
Beam31 ft 8 in (9.65 m)
Draft28 ft 8 in (8.74 m)
Installed power15,000 shaft horsepower (11.2 megawatts)
PropulsionOne S5W nuclear reactor, two steam turbines, one screw
Speed
  • 15 knots (28 km/h; 17 mph) surfaced
  • 25 knots (46 km/h; 29 mph) submerged
Test depth1,300 feet (400 meters)
Complement108
Armament4 × 21-inch (533 mm) torpedo tubes

USS Guitarro (SSN-665), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the guitarro, a ray of the guitarfish family.

Contents

Guitarro was used as the primary test bed for Submarine Launched Tomahawk Cruise Missile testing from 1977 through 1984. Primary GD test conductor was Wiley Huffman. All torpedo tube launches were successful. The majority of test flights were successful. A manufacturing related issue resulted in one unsuccessful flight. The resolution of this resulted in successful follow-on flights. Guitarro was instrumental in the development essential documentation: Weapon Handling procedures (from factory to submarine, from Torpedo Weapons Facility to submarine, from Submarine Tender to submarine); Launch Procedures; Targeting Procedures and Guidelines. Following test bed used was USS-705 City of Corpus Christi with Roy Keely as test conductor. All Tomahawk tests completed successfully.

Construction and commissioning

Keel-laying and launching

The contract to build Guitarro was awarded to Mare Island Naval Shipyard at Vallejo, California, on 18 December 1964 and her keel was laid down there on 9 December 1965. She was launched on 27 July 1968, sponsored by Mrs. John M. Taylor, wife of Vice Admiral John Taylor.

On 15 March 1969 during a meeting with the shipyard managers, Cmdr. William G. Lange urged them to create centralized control and designate responsibility for all construction. The shipyard representatives dismissed his idea, saying "the shipyard had been building ships for a long time without the need for such a procedure and no one had been killed or equipments damaged yet."

Sinking

Guitarro on the bottom of the Napa River after her accidental sinking at Mare Island Naval Shipyard at Vallejo, California, on 15 May 1969. USS Guitarro (SSN-665) after sinking.jpg
Guitarro on the bottom of the Napa River after her accidental sinking at Mare Island Naval Shipyard at Vallejo, California, on 15 May 1969.

On 15 May 1969, Guitarro was moored in the Napa River at Mare Island Naval Shipyard while construction was still underway. At about 16:00, a civilian nuclear construction group began to calibrate the aft ballast tanks, which required them to fill the tanks with approximately 5 short tons (4.5 t) of water. Within 30 minutes, a different, non-nuclear civilian construction group began an assignment to bring Guitarro within a half-degree of trim; this entailed adding water to the forward ballast tanks to overcome a reported two-degree up-bow attitude. Until shortly before 20:00, both groups continued to add water, unaware of each other's activities. [1]

Twice between 16:30 and 20:00, a security watch advised the non-nuclear group that Guitarro was riding so low forward that the 1.5-foot-high (0.46 m) wakes of boats operating in the Napa River were sloshing into the sonar dome manhole, but the group ignored the warnings. At 19:45, the non-nuclear group stopped adding water to the ballast tanks and began to halt work for their meal break, leaving at 20:00. At 19:50, the nuclear group completed their calibrations and began to empty the tanks aft. [1]

At 20:30, both the nuclear group, still aboard, and the non-nuclear group, returning from their break, noticed Guitarro taking a sudden down angle which put the forward hatches underwater. Massive flooding took place through several large open hatches. Efforts between 20:30 and 20:45 to close watertight doors and hatches were largely unsuccessful because lines and cables ran through the doors and hatches, preventing them from closing. At 20:55, Guitarro sank, leaving only her sail above water, earning her the nickname "Mare Island Mud Puppy". [1]

Causes

In an attempt to correct what they thought was an out of trim condition, the non-nuclear construction team in the forward part of the boat purposefully defeated safety measures preventing accidentally filling ballast tanks while the sub was under construction. During construction, steel plates are welded over the ballast tanks flood ports to prevent water from getting into the tanks and putting the submarine in an unsafe condition. The construction crew put a fire hose down the tank's vent pipe and forced it past the check valve. [2]

The Congressional report concluded that the sinking was caused in large part by "the action, or inaction, of certain construction workers who either failed to recognize an actual or potential threat to the ship's safety or assumed that it was not their responsibility." The report stated that the "lack of centralized control and responsibility for all construction" was the overriding cause. [2]

One of the factors contributing to the ship's sinking was the open manhole used to access the bow structure sonar dome containing the boat's sonar sphere. The manhole has a bolted cover which had been removed for maintenance purposes. The opening was protected by a cofferdam approximately 3 feet (0.91 m) high. The cofferdam was intended to prevent water from accidentally entering the dome and contacting the exposed electronic gear. [1]

To facilitate repair work, the cofferdam and the bolted manhole cover were removed in early March 1969 and neither the cofferdam nor the cover was ever replaced. When the construction crews added and then removed water from the ballast tanks, affecting the boat's trim, the manhole was exposed to waves caused by the wake of other vessels, causing the boat to sink at the bow, eventually filling the entire submarine. [1]

Refloating

Guitarro was refloated three days later, on 18 May 1969. Damages to her were estimated at $15.2 to $21.85 million (equivalent to $87 to $126 million in 2021 [3] ).

Lessons learned

Among other recommendations affecting communication, management, and supervision of ship construction, the report authors recommended that cables and lines running through watertight hatches and doors be equipped with quick disconnect fittings. [2]

Commissioning

Guitarro had been scheduled to be commissioned in January 1970, but repairs necessitated by her sinking dictated a 32-month delay. She finally was commissioned on 9 September 1972.

Service history

In the mid-to-late 1970s, Guitarro was stationed at Point Loma in San Diego, California, commanded by Alvin H. Pauole, followed by Scott Van Hoften.

Guitarro played a major role in developing tactics for prototype combat systems deployed to the Pacific submarine fleet, in particular the new Submarine Towed Array Sensor System (STASS) along with its BQR-20 series digital sonar displays. In the mid-1970s, Guitarro also installed the first digital submarine combat system (BQQ-5 sonar and Mk-117 fire control system) and participated in the development of submarine-launched Harpoon and Tomahawk cruise missiles. [4]

She was active at the time in the pre-operational testing of the new Tomahawk cruise missile, launching several of the missiles on a test range off the coast of Southern California.

Guitarro was used as the primary test bed for Tomahawk Cruise Missile testing from 1977 through 1984. Primary GD test conductor was Wiley Huffman. All torpedo tube launches were successful, but flight tests were failures. Following test bed used was USS-705 City of Corpus Christi with Roy Keely as test conductor. All Tomahawk tests completed successfully.

USS Guitarro (SSN-665) hosting the first tour of a US nuclear submarine by high-ranking Russian officials: The late General Colin Powell is in the rear of the group 1990 Oct Russian Tour of USS Guitarro (SSN-665) with General Colin Powell.jpg
USS Guitarro (SSN-665) hosting the first tour of a US nuclear submarine by high-ranking Russian officials: The late General Colin Powell is in the rear of the group

Guitarro (SSN-665) at NAS North Island on 4 October 1990 for a VIP visit. General Mikhail Moiseyev, First Deputy Minister of Defense and Chief of the General Staff for the Soviet Union and General Colin Powell, Chairman of the Joint Chiefs of Staff, toured the forward areas of the ship that day, but did not tour the engineering spaces. Just aft of the Guitarro (SSN-665) is the Missouri BB-63.

USS Guitarro (SSN-665) hosting the first tour of a US nuclear submarine by high-ranking Russian officials 1990 Oct Russian Tour of USS Guitarro (SSN-665).jpg
USS Guitarro (SSN-665) hosting the first tour of a US nuclear submarine by high-ranking Russian officials

Decommissioning and disposal

Guitarro was decommissioned on 29 May 1992 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, was completed on 18 October 1994.

Related Research Articles

<i>Los Angeles</i>-class submarine Class of nuclear-powered fast attack submarines of the United States Navy

The Los Angeles class of submarines are nuclear-powered fast attack submarines (SSN) in service with the United States Navy. Also known as the 688 class after the hull number of lead vessel USS Los Angeles (SSN-688), 62 were built from 1972 to 1996, the latter 23 to an improved 688i standard. As of 2022, 26 of the Los Angeles class remain in commission — more than any other class in the world — and they account for more than half of the U.S. Navy's 50 fast attack submarines.

<i>Sturgeon</i>-class submarine Class of fast attack nuclear submarine by US Navy

The Sturgeon class was a class of nuclear-powered fast attack submarines (SSN) in service with the United States Navy from the 1960s until 2004. They were the "workhorses" of the Navy's attack submarine fleet throughout much of the Cold War. The boats were phased out in the 1990s and early 21st century, as their successors, the Los Angeles, followed by the Seawolf and Virginia-class boats, entered service.

<i>Seawolf</i>-class submarine Class of US nuclear attack submarines

The Seawolf class is a class of nuclear-powered, fast attack submarines (SSN) in service with the United States Navy. The class was the intended successor to the Los Angeles class, and design work began in 1983. A fleet of 29 submarines was to be built over a ten-year period, but that was reduced to 12 submarines. The end of the Cold War and budget constraints led to the cancellation of any further additions to the fleet in 1995, leaving the Seawolf class limited to just three boats. This, in turn, led to the design of the smaller Virginia class. The Seawolf class cost about $3 billion per unit, making it the most expensive United States Navy fast attack submarine and second most expensive submarine ever, after the French Triomphant-class nuclear-powered ballistic missile submarines.

<i>Virginia</i>-class submarine US Navy fast attack submarine class

The Virginia class, also known as the SSN-774 class, is a class of nuclear-powered cruise missile fast-attack submarines, in service in the United States Navy. Designed by General Dynamics Electric Boat (EB) and Huntington Ingalls Industries, the Virginia class is the United States Navy's latest submarine model, which incorporates the latest in stealth, intelligence gathering, and weapons systems technology.

USS <i>Thresher</i> (SSN-593) United States Navy submarine

USS Thresher (SSN-593) was the lead boat of her class of nuclear-powered attack submarines in the United States Navy. She was the U.S. Navy's second submarine to be named after the thresher shark.

USS <i>Virginia</i> (CGN-38) CGN-38 class guided missile cruiser ship of the United States Navy

USS Virginia (CGN-38) was a nuclear-powered guided missile cruiser, the lead ship of her class, and the eighth ship of the United States Navy to be named for the Commonwealth of Virginia. She was commissioned in 1976 and decommissioned in 1994.

USS <i>Seawolf</i> (SSN-575) US Navy nuclear attack submarine

USS Seawolf (SSN-575) was the third ship of the United States Navy to be named for the seawolf, the second nuclear submarine, and the only US submarine built with a liquid metal cooled (sodium), beryllium-moderated nuclear reactor, the S2G. Her overall design was a variant of Nautilus, but with numerous detail changes, such as a conning tower, stepped sail, and the BQR-4 passive sonar mounted in the top portion of the bow instead of further below. This sonar arrangement resulted in an unusual bow shape above the water for a U.S. submarine. Her distinctive reactor was later replaced with a standard pressurized water reactor, the replacement process lasting from 12 December 1958 to 30 September 1960.

USS <i>Minneapolis–Saint Paul</i> (SSN-708) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Minneapolis–Saint Paul (SSN-708), a Los Angeles-class submarine, was the first vessel of the United States Navy to be named for the metropolitan area of Minneapolis-Saint Paul, Minnesota, although each city had been honored twice before. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 31 October 1973 and her keel was laid down on 20 January 1981. She was launched on 19 March 1983 sponsored by Mrs. Penny Durenberger, and commissioned on 10 March 1984, with Commander Ralph Schlichter in command.

USS <i>Augusta</i> (SSN-710) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Augusta (SSN-710), a Los Angeles-class submarine, was the first ship of the United States Navy to be named for Augusta, Maine. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 31 October 1973 and her keel was laid down on 1 April 1983. She was launched on 21 January 1984 sponsored by Mrs. Diana D. Cohen, wife of U.S. Senator William Cohen and commissioned on 19 January 1985.

USS <i>Pogy</i> (SSN-647) Submarine of the United States

USS Pogy (SSN-647), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the pogy, or menhaden.

USS <i>Halibut</i> (SSGN-587) US Navy submarine

USS Halibut (SSGN-587), a unique nuclear-powered guided missile submarine-turned-special operations platform, later redesignated as an attack submarine SSN-587, was the second ship of the United States Navy to be named after the halibut.

USS <i>Scorpion</i> (SSN-589) Skipjack-class nuclear-powered submarine

USS Scorpion (SSN-589) was a Skipjack-class nuclear-powered submarine that served in the United States Navy, and the sixth vessel, and second submarine, of the U.S. Navy to carry that name.

USS <i>Baton Rouge</i> Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Baton Rouge (SSN-689) was a Los Angeles-class nuclear-powered attack submarine which served with the United States Navy. With her keel laid down on 18 November 1972, Baton Rouge was launched on 26 April 1975. She became the second Los Angeles-class submarine to be commissioned, on 25 June 1977. In 1995, she was the first of her class to be decommissioned, after a collision with a Russian Sierra-class submarine.

USS <i>Louisville</i> (SSN-724) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Louisville (SSN-724), a Los Angeles-class submarine, is the fourth ship of the United States Navy to be named for Louisville, Kentucky. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 11 February 1982 and her keel was laid on 24 September 1984. She was launched on 14 December 1985—sponsored by Mrs. Betty Ann McKee, wife of Admiral Kinnaird McKee, Director of Naval Nuclear Propulsion —and commissioned on 8 November 1986 with Captain Charles E. Ellis in command.

USS <i>Cheyenne</i> (SSN-773) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Cheyenne (SSN-773), the final Los Angeles-class submarine, is the third ship of the United States Navy to be named for Cheyenne, Wyoming. The contract to build her was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia on 28 November 1989 and her keel was laid down on 6 July 1992. She was launched on 16 April 1995 sponsored by Mrs. Ann Simpson, wife of Wyoming Senator Alan K. Simpson, and commissioned on 13 September 1996, with Commander Peter H. Ozimik in command. Cheyenne transferred to her homeport of Pearl Harbor, Hawaii, in 1998.

<span class="mw-page-title-main">Nuclear submarine</span> Submarine propelled by nuclear power

A nuclear submarine is a submarine powered by a nuclear reactor, but not necessarily nuclear-armed. Nuclear submarines have considerable performance advantages over "conventional" submarines. Nuclear propulsion, being completely independent of air, frees the submarine from the need to surface frequently, as is necessary for conventional submarines. The large amount of power generated by a nuclear reactor allows nuclear submarines to operate at high speed for long periods, and the long interval between refuelings grants a range virtually unlimited, making the only limits on voyage times being imposed by such factors as the need to restock food or other consumables.

USS <i>Atlanta</i> (SSN-712) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Atlanta (SSN-712), a Los Angeles-class submarine, was the fifth ship of the United States Navy to be named for Atlanta, Georgia. The contract to build her was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia, on 1 August 1975 and her keel was laid down on 17 August 1978. She was launched on 16 August 1980 sponsored by Mrs. Sam Nunn, and commissioned on 6 March 1982, with Commander Robin J. White in command.

There are three major types of submarines in the United States Navy: ballistic missile submarines, attack submarines, and cruise missile submarines. All submarines currently in the U.S. Navy are nuclear-powered. Ballistic missile submarines have a single strategic mission of carrying nuclear submarine-launched ballistic missiles. Attack submarines have several tactical missions, including sinking ships and subs, launching cruise missiles, and gathering intelligence. Cruise missile submarines perform many of the same missions as attack submarines, but with a focus on their ability to carry and launch larger quantities of cruise missiles than typical attack submarines.

<i>Tom Clancys SSN</i> 1996 video game

Tom Clancy's SSN is a submarine simulator of the 688i. The game player is in command of USS Cheyenne in a limited war against China over the Spratly Islands. Gameplay is limited to a 15 mission single-player campaign in which the player carries out anti-submarine, anti-surface ship roles, intelligence gathering activities, and the launch of submarine based cruise missiles. Tom Clancy also wrote a book by the same name as a tie-in.

References

  1. 1 2 3 4 5 Guitarro II (SSN-665) 1972–1994
  2. 1 2 3 Sinking of USS Guitarro (SSN-665)
  3. Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved 1 January 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
  4. "Why the U.S. Navy Needs to Get Back to Prototyping".