USS John F. Kennedy (CVN-79)

Last updated

USS John F. Kennedy (CVN-79)
USS John F. Kennedy (CVN-79) in drydock at Newport News Shipbuilding, Virginia (USA) on 29 October 2019 (191029-N-BD319-110).JPG
John F. Kennedy on 29 October 2019
History
Flag of the United States.svgUnited States
NameJohn F. Kennedy
Namesake John F. Kennedy
Builder Huntington Ingalls Industries
Cost$11.341 billion [1]
Laid down20 July 2015 [2]
Launched29 October 2019 [3] [2]
Sponsored by Caroline Kennedy
Christened7 December 2019 [4]
IdentificationCVN-79
Motto"Serve with courage"
StatusFitting out
Badge USS John F. Kennedy (CVN-79) crest.png
General characteristics
Class and type Gerald R. Ford-class aircraft carrier
DisplacementAbout 100,000 long tons (100,000 tonnes) (full load) [5]
Length1,106 ft (337 m)
Beam
  • 134 ft (41 m) (waterline)
  • 256 ft (78 m) (flight deck)
Draft39 ft (12 m)
Installed powerTwo A1B nuclear reactors
PropulsionFour shafts
SpeedIn excess of 30 knots (56 km/h; 35 mph)
RangeUnlimited distance; 20–25 years
Complement4,660
Sensors and
processing systems
Armament
Aircraft carriedMore than 80, can hold up to 90 combat aircraft
Aviation facilities1,092 ft × 256 ft (333 m × 78 m) flight deck

USS John F. Kennedy (CVN-79) is the second Gerald R. Ford-class aircraft carrier built for the United States Navy. The ship was launched on 29 October 2019, and christened on 7 December 2019.

Contents

Naming

On 7 December 2007, the 66th anniversary of the Attack on Pearl Harbor, Arizona Congressman Harry Mitchell proposed naming this ship Arizona. In 2009, Arizona Congressman John Shadegg proposed naming either CVN-79 or the subsequent CVN-80 as Barry M. Goldwater, after the late U.S. Senator, also from Arizona. [7] On 29 May 2011, the Department of Defense announced that the ship would be named for John F. Kennedy, the 35th  President of the United States, who served in the navy during World War II. [8] She will be the third navy ship named after members of the Kennedy family, and the second aircraft carrier named John F. Kennedy, succeeding USS John F. Kennedy (CV-67), which was active from 1968 to 2007.

Construction

John F. Kennedy being constructed in September 2018 CVN-79 JFK construction bow.jpg
John F. Kennedy being constructed in September 2018

On 15 January 2009, Huntington Ingalls Industries (HII) Northrop Grumman Shipbuilding was awarded a $374 million contract for design work and construction preparation for John F. Kennedy. [9] On 30 September 2010, Northrop Grumman announced that preparations were under way to begin construction. [10] On 25 February 2011, the Navy conducted the First Cut of Steel ceremony at Northrop Grumman in Newport News, signalling the formal start of construction for John F. Kennedy. [11] [12]

John F. Kennedy was originally planned to be completed in 2018. This was extended to 2020 after Secretary of Defense Robert Gates announced in 2009 that the program would shift to a five-year building program so as to place it on a "more fiscally sustainable path". By late 2012, delays had occurred in construction, and the Navy Department was investigating extending the construction time of both Enterprise and John F. Kennedy by an additional two years which could delay the carrier's entry into service until 2022. [1] In September 2013, the Government Accountability Office recommended delaying the detail design and construction contract for John F. Kennedy until programmatic shortfalls are sorted out. The Navy and Defense Department have rejected the recommendation. The Navy faces technical, design, and construction challenges to completing Gerald R. Ford, including producing systems prior to demonstrating their maturity to meet required installation dates. Gerald R. Ford had costs increase by 22% to $12.8 billion, and additional increases could follow due to uncertainties facing critical technology systems and shipbuilder under performance. Risk is introduced in the Navy's plan to conduct integration testing of key systems at the same time as initial operational test and evaluation. One action the GAO says could be taken to ensure Ford-class carrier acquisitions are supported is conducting a cost-benefit analysis of required capabilities and associated costs. [13]

The ship's keel was laid in Newport News, Virginia on 22 August 2015. [14] As part of the traditional keel laying ceremony, the initials of ship sponsor Caroline Kennedy, daughter of President Kennedy and the sponsor of the previous John F. Kennedy, were welded into the ship's hull. [14] As of late June 2017 the ship was 50% structurally complete. [15] On 28 February 2018, HII announced that its Newport News Shipbuilding division had built 70% of the structures necessary to complete John F. Kennedy. [16] On 30 April 2018, HII announced that she was "75 percent structurally erected and more than 40 percent complete." On 3 May 2018 HII President & CEO Mike Petters reported that John F. Kennedy was to be launched three months ahead of schedule on 29 October 2019. [17] On 30 May 2019 the 588-ton bridge and island was installed. Under the island Captain Todd Marzano placed his wings and the first Kennedy half dollar, which was donated by Caroline Kennedy, was put in place. Next to these Rear Admiral Brian Antonio (program executive officer, Aircraft Carriers, ret.), [18] Rear Admiral Roy Kelley (commander, Naval Air Force Atlantic), [19] and Jennifer Boykin (president, Newport News Shipbuilding) [20] placed coins each embossed with quotes from President Kennedy and parts of the ship's motto. Caroline could not be present, so the order was given via radio for the crane operator to lift the island and set it down on the deck over the ceremonial items and entombing them in the ship's superstructure. [21] The ship reached 100% complete on 11 July 2019 with the installation of the upper bow and launch deck consisting of the ship's two forward catapults. [22]

On 1 October 2019, the ship's crew was activated for the first time as Pre-Commissioning Unit (PCU) John F. Kennedy at a ceremony aboard the vessel at Newport News Shipbuilding. [23] On 29 October 2019, Newport News Shipbuilding began flooding the dry dock where John F. Kennedy has been under construction. The process of filling the dry dock with more than 100,000,000 US gallons (380,000,000 L; 83,000,000 imp gal) of water took place over several days, and it marked the first time the ship has been in water. Once the ship was afloat, she was moved to west end of the dry dock. [24] The ship was christened on 7 December 2019 by Caroline Kennedy, who reenacted the bottle bash she did when the first John F. Kennedy (CV-67) was christened 52 years earlier. [4]

In November 2020, HII received a nine-figure modification on an earlier contract to accomplish CVN 79 "single phase delivery and Joint Strike Fighter (F-35C) capabilities" in Newport News, Virginia. [25] According to the contract announcement, the "single-phase delivery approach" is adopted "to meet both Fleet requirements and a congressional mandate of ensuring that CVN 79 is capable of operating and deploying Joint Strike Fighter (F-35C) aircraft before completing the post-shakedown availability as codified in Section 124 of the fiscal 2020 National Defense Authorization Act (Public Law 116-92)." [25] The ship is projected to begin testing her Electromagnetic Aircraft Launch System in 2022, [26] and her combat system in 2023. [27] In the same year, the U.S. Navy awarded a contract worth almost $400 million to HII for upgrades to the ship's flight deck, island, and weapon systems. [28] She is scheduled to be delivered in 2025. [29]

See also

External videos
on the official YouTube channel of HI Industries (in English)
Nuvola apps kaboodle.svg Building John F. Kennedy (CVN 79) on YouTube
Nuvola apps kaboodle.svg Bringing John F. Kennedy (CVN 79) to Life on YouTube
Nuvola apps kaboodle.svg John F. Kennedy (#CVN79) Christening Ceremony on YouTube

Related Research Articles

<span class="mw-page-title-main">Newport News Shipbuilding</span> American shipyard

Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, is the sole designer, builder, and refueler of aircraft carriers and one of two providers of submarines for the United States Navy. Founded as the Chesapeake Dry Dock and Construction Co. in 1886, Newport News Shipbuilding has built more than 800 ships, including both naval and commercial ships. Located in the city of Newport News, its facilities span more than 550 acres (2.2 km2).

USS <i>George H.W. Bush</i> US Navy Nimitz-class aircraft carrier

USS George H.W. Bush (CVN-77) is the tenth and final Nimitz-class supercarrier of the United States Navy. She is named for the 41st President of the United States and former Director of Central Intelligence George H. W. Bush, who was a naval aviator during World War II. The vessel's callsign is Avenger, after the TBM Avenger aircraft flown by then-Lieutenant George H. W. Bush in World War II. Construction began in 2003 at Northrop Grumman, in Newport News, Virginia and was completed in 2009 at a cost of $6.2 billion. Her home port is Naval Station Norfolk, Virginia.

<i>Nimitz</i>-class aircraft carrier US Navy nuclear-powered aircraft carrier class

The Nimitz class is a class of ten nuclear-powered aircraft carriers in service with the United States Navy. The lead ship of the class is named after World War II United States Pacific Fleet commander Fleet Admiral Chester W. Nimitz, who was the last living U.S. Navy officer to hold the rank. With an overall length of 1,092 ft (333 m) and a full-load displacement of over 100,000 long tons (100,000 t), the Nimitz-class ships were the largest warships built and in service until USS Gerald R. Ford entered the fleet in 2017.

USS <i>Enterprise</i> (CVN-65) Decommissioned United States Navy aircraft carrier

USS Enterprise (CVN-65), formerly CVA(N)-65, is a decommissioned United States Navy aircraft carrier. In 1958, she was the first nuclear-powered aircraft carrier and the eighth United States naval vessel to bear the name. Like her predecessor of World War II fame, she is nicknamed "Big E". At 1,123 feet (342 m), she is the longest naval vessel ever built and the only ship of a class that was originally planned to have five other ships. Her 93,284-long-ton (94,781 t) displacement ranks her class as the third largest carrier class, after the Nimitz class and the Gerald R. Ford class. Enterprise had a crew of some 4,600 service members.

<span class="mw-page-title-main">Ingalls Shipbuilding</span> Shipyard in Pascagoula, Mississippi

Ingalls Shipbuilding is a shipyard located in Pascagoula, Mississippi, United States, originally established in 1938, and now part of HII. It is a leading producer of ships for the United States Navy, and, as of 2023, is the largest private employer in Mississippi.

<i>San Antonio</i>-class amphibious transport dock Warship class of the US Navy

The San Antonio class is a class of amphibious transport docks, also called a "landing platform, dock" (LPD), used by the United States Navy. These warships replace the Austin-class LPDs, as well as the Newport-class tank landing ships, the Anchorage-class dock landing ships, and the Charleston-class amphibious cargo ships that have already been retired.

<i>Gerald R. Ford</i>-class aircraft carrier Class of supercarriers for the U.S. Navy

The Gerald R. Ford-class nuclear-powered aircraft carriers are currently being constructed for the United States Navy, which intends to eventually acquire ten of these ships in order to replace current carriers on a one-for-one basis, starting with the lead ship of her class, Gerald R. Ford (CVN-78), replacing Enterprise (CVN-65), and later the Nimitz-class carriers. The new vessels have a hull similar to the Nimitz class, but they carry technologies since developed with the CVN(X)/CVN-21 program, such as the Electromagnetic Aircraft Launch System (EMALS), as well as other design features intended to improve efficiency and reduce operating costs, including sailing with smaller crews. This class of aircraft carriers is named after former U.S. President Gerald R. Ford. CVN-78 was procured in 2008 and commissioned into service on 22 July 2017. The second ship of the class, John F. Kennedy (CVN-79), is scheduled to enter service in 2025.

Northrop Grumman Ship Systems (NGSS) was a former sector or division of Northrop Grumman Corporation which was responsible for building small and medium shipping products. It was merged with another sector of Northrop Grumman, Northrop Grumman Newport News, which was responsible for building nuclear submarines and supercarriers, to form the sector Northrop Grumman Shipbuilding.

Avondale Shipyard was an independent shipbuilding company, acquired by Litton Industries, in turn acquired by Northrop Grumman Corporation. In 2011, along with the former Ingalls Shipbuilding, the yard was part of Huntington Ingalls Industries. It closed in October 2014. The yard was located on the west bank of the Mississippi River in an area called Bridge City, about 20 miles (32 km) upriver from New Orleans near Westwego, Louisiana. It was the site of the modernization of the battleship USS Iowa in the early 1980s and also constructed some of the lighter aboard ships (LASH). At one time, it was the largest employer in Louisiana, with about 26,000 employees.

USS <i>Gerald R. Ford</i> Gerald R. Ford-class aircraft carrier

USS Gerald R. Ford (CVN-78) is an aircraft carrier for the United States Navy and the lead ship of her class. The ship is named after the 38th President of the United States, Gerald Ford, whose World War II naval service included combat duty aboard the light aircraft carrier Monterey in the Pacific Theater.

<i>America</i>-class amphibious assault ship Amphibious Assault Ship

The America class is a ship class of landing helicopter assault (LHA) type amphibious assault ships of the United States Navy (USN). The class is designed to put ashore a Marine Expeditionary Unit using helicopters and MV-22B Osprey V/STOL transport aircraft, supported by AV-8B Harrier II or F-35 Lightning II V/STOL aircraft and various attack helicopters. The first of these warships was commissioned by the U.S. Navy in 2014 to replace USS Peleliu of the Tarawa class; as many as eleven will be built. The design of the America class is based on that of USS Makin Island, the last ship of the Wasp class, but the "Flight 0" ships of the America class will not have well decks, and have smaller on-board hospitals to provide more space for aviation uses.

USS <i>California</i> (SSN-781) US Navy Virginia-class submarine

USS California (SSN-781), is the eighth Virginia-class submarine, and the seventh United States Navy ship named for the state of California. The contract to build her was awarded to Newport News Shipbuilding in Newport News, Virginia, on 14 August 2003. Construction began in December 2006. California's keel was laid down on 1 May 2009. She was christened on 6 November 2010, sponsored by Donna Willard, wife of Admiral Robert F. Willard. She was launched eight days later, on 14 November 2010.

<span class="mw-page-title-main">Huntington Ingalls Industries</span> American shipbuilding company

Huntington Ingalls Industries, Inc. (HII) is the largest military shipbuilding company in the United States as well as a provider of professional services to partners in government and industry. HII, ranked No. 375 on the Fortune 500, was formed on 31 March 2011, as a divestiture from Northrop Grumman.

USS <i>Enterprise</i> (CVN-80) Future Gerald R. Ford-class aircraft carrier

USS Enterprise (CVN-80) will be the third Gerald R. Ford-class aircraft carrier to be built for the United States Navy. She will be the ninth United States naval vessel and third aircraft carrier to bear the name, and is scheduled to be in operation by 2028. Her construction began in August 2017 with a steel-cutting ceremony.

<span class="mw-page-title-main">C. Michael Petters</span>

Clement Michael Petters is president and CEO of Huntington Ingalls Industries, an American military shipbuilding company.

USS <i>Bougainville</i> (LHA-8) America-class amphibious assault ship

USS Bougainville (LHA-8) is an America-class amphibious assault ship currently under construction for the United States Navy. She will be the second Navy ship to be named Bougainville.

<span class="mw-page-title-main">Thomas Moore (admiral)</span> United States Naval Officer

Vice Admiral Thomas J. Moore was a senior officer in the United States Navy. He retired from active duty on June 19, 2020, after 39 years of service. He currently serves as Vice President of Nuclear Operations at Huntington Ingalls Industries.

USS <i>Doris Miller</i> Planned Gerald R. Ford-class aircraft carrier

USS Doris Miller (CVN-81) will be the fourth Gerald R. Ford-class aircraft carrier of the United States Navy. Doris Miller is scheduled to be laid down January 2026, launched October 2029 and commissioned in 2032. She will be built at Newport News Shipbuilding, a division of Huntington Ingalls Industries in Newport News, Virginia.

References

  1. 1 2 O'Rourke, Ronald (22 December 2017). "Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress" (PDF). Congressional Research Service. Retrieved 16 January 2018.
  2. 1 2 "Naval Vessel Register".
  3. "Huntington Ingalls Industries Floods Dry Dock in Preparation for Christening Of Aircraft Carrier John F. Kennedy (CVN 79)" (Press release). Huntington Ingalls Industries. 29 October 2019. Retrieved 29 October 2019.
  4. 1 2 "Aircraft Carrier John F. Kennedy (CVN 79) Christened at Newport News Shipbuilding" (Press release). Huntington Ingalls Industries. 7 December 2019. Retrieved 7 December 2019.
  5. "Aircraft Carriers - CVN". Fact File. United States Navy. 17 September 2020. Retrieved 18 November 2020.
  6. LaGrone, Sam (22 August 2016). "Raytheon Awarded $92M Navy Contract for Future Carrier, Big Deck AESA Radars". USNI News. U.S. Naval Institute.
  7. "H.CON.RES.83". thomas.gov. Archived from the original on 14 December 2012.
  8. "Aircraft carrier to be named for JFK". Politico . 29 May 2011. Archived from the original on 20 September 2021.
  9. "Fact Sheet" (PDF). Northrop Grumman Shipbuilding. Archived from the original (PDF) on 5 July 2010. Retrieved 26 May 2009.
  10. "Photo Release -- Northrop Grumman Announces Leadership Changes at Shipbuilding Sector in Newport News". Northrop Grumman. 30 September 2010. Archived from the original on 21 October 2020.
  11. "Construction Begins on Navy's Newest Aircraft Carrier". navy.mil. 25 February 2011. Archived from the original on 1 March 2011.
  12. Frost, Peter (26 February 2011). "Shipyard Cuts First Steel For Next Carrier; Funding Remains In Flux". Daily Press . Newport News, Virginia. Archived from the original on 10 July 2022.
  13. Fabey, Michael (5 September 2013). "Delay Kennedy Carrier Contract, GAO Says | Defense content from". Aviation Week. Archived from the original on 4 October 2013. Retrieved 17 September 2016.
  14. 1 2 LaGrone, Sam (22 August 2015). "Keel Laid for John F. Kennedy Carrier". United States Naval Institute. Archived from the original on 25 August 2015. Retrieved 29 January 2016.
  15. "Aircraft carrier "JFK" (CVN-79) lower stern lift". Huntington Ingalls Industries. 22 June 2017. Archived from the original on 15 August 2022. Retrieved 10 March 2018.
  16. "Aircraft carrier "JFK" structural milestone". Huntington Ingalls Industries. 22 February 2018. Archived from the original on 26 September 2022. Retrieved 10 March 2018.
  17. Larter, David B. (3 May 2018). "Here's the latest on America's next supercarriers". Defense News. Archived from the original on 4 November 2019.
  18. "Rear Admiral Brian K. Antonio". United States Navy. 10 January 2017. Archived from the original (Biography) on 22 June 2017.
  19. "Rear Admiral Roy J. Kelley". United States Navy. 2 November 2017. Archived from the original (Biography) on 20 July 2019.
  20. "Jennifer Boykin". Newport News Shipbuilding. 2017. Archived from the original on 1 June 2017.
  21. Faram, Mark D. (29 May 2019). "How the USS John F. Kennedy got her island". Navy Times. Archived from the original on 6 January 2024. Retrieved 30 May 2019.
  22. "Video Release--Huntington Ingalls Industries Completes Flight Deck on Aircraft Carrier John F. Kennedy". Huntington Ingalls Industries. 11 July 2019. Archived from the original on 2 October 2022. Retrieved 16 June 2020.
  23. "Future Carrier John F. Kennedy Establishes Crew". United States Navy. 2 October 2019. Archived from the original on 6 January 2024.
  24. "Video Release—Huntington Ingalls Industries Floods Dry Dock in Preparation for Christening Of Aircraft Carrier John F. Kennedy (CVN 79)". Huntington Ingalls Industries. 29 October 2019. Archived from the original on 7 October 2022. Retrieved 16 June 2020.
  25. 1 2 "Contracts for November 2, 2020". U.S. Department of Defense. 2 November 2020. Archived from the original on 17 August 2022. Retrieved 25 January 2021.
  26. Fabey, Michael (11 February 2022). "Carrier Kennedy to start EMALS testing later this year". Janes. Archived from the original on 12 February 2022. Retrieved 19 June 2022.
  27. Fabey, Michael (15 February 2023). "Carrier Kennedy set to enter combat system test programme this quarter". Jane's. Archived from the original on 27 February 2023. Retrieved 26 May 2023.
  28. Manuel, Rojoef (27 June 2023). "US Navy Updates Delivery Strategy for Future USS John F. Kennedy Aircraft Carrier". The Defense Post. Archived from the original on 27 June 2023. Retrieved 1 July 2023.
  29. Shelbourne, Mallory (23 March 2023). "Ford Aircraft Carrier John F. Kennedy to Deliver a Year Later". U.S. Naval Institute. Archived from the original on 23 March 2023. Retrieved 24 March 2023.