Warrington and Newton Railway

Last updated

The Warrington and Newton Railway was a short early railway linking Warrington to the Liverpool and Manchester Railway at Newton, and to pits at Haydock, nearby. It opened in 1831.

Contents

The Grand Junction Railway aspired to make its long-distance route from Birmingham to Liverpool and Manchester, and acquire the W&NR so as to use it from Warrington northwards. The permanent way needed to be strengthened for main line use. The GJR opened its line in 1837, connecting at Warrington to the W&NR and gaining access to Liverpool and Manchester over the L&MR. The W&NR was the first part of the present-day West Coast Main Line to be opened.

Branch from the Liverpool and Manchester Railway

The Warrington and Newton Railway in 1831 Warringtonandnewtonrly1831.png
The Warrington and Newton Railway in 1831

On 15 September 1830 the Liverpool and Manchester Railway opened for business. [1] Although this was a purely west to east line, primarily connecting the manufactories of Manchester with the great docks of Liverpool, there were already thoughts of forming a British railway network.

While the L&MR was still being built, a company to make a branch line from it to Warrington was being proposed, and the Warrington and Newton Railway was authorised by Parliament on 14 May 1829. [2] [3] It was to run from a terminal at Dallum Lane [note 1] in Warrington, to Newton (later Newton-le-Willows) on the L&MR, a distance of a little over 4 miles. There was to be a branch at Warrington to Bank Quay, close to the River Mersey, and a northward extension at Newton to coal pits at Haydock. Authorised share capital was £53,000. [4] The junction at Newton was to face towards Liverpool. [5] Warrington was a manufacturing town with a population of about 19,000. [2] One of the main objects was the quick conveyance of coal from the Haydock pits near Newton to Warrington. [6]

There was a lack of unity on the board over the construction, which delayed construction, and powerful landowners on the intended route of the line also made difficulties. [4] The type of track adopted had cast iron fishbellied rails and untreated larch sleepers; the failure to apply preservative treatment resulted in early failure of the sleepers. [7]

The Liverpool-facing connection at Newton was seen to be a limitation, and in 1830, a second Act was secured, authorising a curve at Newton to connect to the L&MR in the Manchester direction, and also to make a direct connection to the Wigan Branch Railway, which ran north from a junction at Parkside, which faced Manchester. In fact both the Warrington and Newton Railway and the Wigan Branch Railway found themselves short of funds and they were unable to build the connecting lines and spur. [5]

Opening

The Warrington and Newton Railway opened between Warrington (Dallam) and a location at Newton, terminating at a point south of the L&MR junction, at the beginning of June 1831. This was for the Newton Common races, and passenger trains ran regularly after that. [note 2] The Newton curve and connection to the L&MR was completed on 25 July 1831. There were four trains each way Monday to Saturday only, although Sunday trains were put on by 1833. [8] The trains were worked by three locomotives, named Warrington, Newton and Vulcan. [2] [9]

The Bank Quay branch was not completed at first, and it was probably opened about 1835, diverging from the Dallam line at Jockey Lane. [4] Until 1837 it was used for goods and mineral traffic only; it was close to the River Mersey where shipping could berth. [8]

Grand Junction Railway

The Warrington and Newton line in 1837 Warringtonandnewtonrly1837.png
The Warrington and Newton line in 1837

In 1832 and 1833 the promoters of the Grand Junction Railway were considering their options. They wished to build a trunk railway connecting Birmingham with Liverpool and Manchester. If Liverpool was to be connected to the network further south, then the River Mersey would need to be crossed: the Warrington & Newton Railway could serve as the northern extremity if a crossing of the Mersey in Warrington were made. The proposed Grand Junction Railway would link Birmingham with the central point of the Liverpool and Manchester Railway at Newton Junction, and Liverpool and Manchester would thereby be joined with Birmingham. This compromise lengthened the distance by rail between Birmingham and the two Lancashire towns, but the greater convenience and economy was decisive, [10] and the necessary authorising Act was secured on 6 May 1833. [2]

The directors of the W&NR saw that their railway was important for the Grand Junction Railway and by the end of 1833 they were demanding £125 for each £100 of stock as well as settlement of their debts of about £20,000. Negotiation reduced this to £114 6s a share, but the GJR directors expressed themselves disappointed at this unexpected difficulty. They now considered an alternative route, by-passing the W&NR to the west. Webster says that three inclined planes (on the W&NR) would be avoided by this means. [note 3] [11] In fact these "inclined planes" were not so steep as some: in describing the Grand Junction route, Whishaw says "In the ascending planes are included only two which have gradients under the first class [steeper gradients]; these are at Burton Wood and Newton Brook, both lying between Warrington and Newton; the former being 21 chains in length, and inclining at the rate of 1 in 209; and the latter having an inclination of 1 in 85, and extending for one mile." [12]

In February 1835 the W&NR agreed to sell their line for shares at par, with the GJR adopting their outstanding debt of about £22,000. The GJR undertook to pay the W&NR shareholders 4 per cent until their main line was open throughout: the purchase price was around £67,000, and the takeover was authorised by Act of 12 June 1835, effective from 1 January 1835. The GJR knew it would have to upgrade the permanent way on the W&NR for stronger materials appropriate for a main line railway. [11] [8] [9] [13]

The Grand Junction Railway opened their line from Newton Junction to a temporary Birmingham station at Vauxhall on 4 July 1837. [14] [2] [3] When the Grand Junction Railway line was completed to Warrington on 4 July 1837, the connection was made at Bank Quay and through trains used a station there. Dallam station was relegated to local passenger and goods use at that time.

Connections at Newton

The Newton Junction faced Liverpool, and the Parkside Junction of the Wigan Branch Railway faced away, towards Manchester, so that when through running between those lines was started, two reversals were necessary. On 4 July 1837 [note 4] an east curve at Newton was opened; this was also the date on which the Grand Junction made a connection with the Warrington and Newton; direct running towards Manchester was now possible. Reed says that portion working was adopted, with northbound passenger trains dividing at Newton, and portions continuing to Liverpool and Manchester respectively, but Holt and Biddle say that "Trains to Liverpool and Manchester did not divide at Newton, but ran independently between Warrington and the L&MR." The Newton East Curve was exceptionally sharp, and Reed attributes this to the fact that building it like that obviated the necessity of a further Act of Parliament, by avoiding a land take. [15] [2]

Use of the Newton curves for main-line trains to and from the south continued for Manchester trains until the opening throughout on 10 August 1842, of the Manchester to Crewe line of the Manchester and Birmingham Railway. For Liverpool trains the usage continued until the opening in April 1869 of the Runcorn Railway Bridge and the Runcorn to Weaver Junction line. [16]

The direct connection between the Warrington and Wigan lines, from what became Winwick junction to Golborne junction was first planned in 1830, but not built then for lack of money. The Grand Junction Railway managed to renew the authorisation, but again was unable to carry out the work. A third authorisation was granted on 11 July 1861 to the London and North Western Railway, and it was opened on 1 August 1864, under powers granted a third time, in 1861. Neele records that its first mention in LNWR passenger timetables was not until February 1872. [17] Night postal trains continued to use the original route as Newton had become an established exchange point for mails. [16] [18] [19]

West Coast Main Line

The Warrington and Newton Railway was the first "modern" railway element of the present-day West Coast Main Line, from London to Glasgow. The other sections were the London and Birmingham Railway, 1837–1838, [20] the Trent Valley Railway, 1847, [21] the Grand Junction Railway, 1837, [22] Winwick Jn to Golborne Jn, LNWR 1864, [16] the Wigan branch Railway, 1832, [23] the North Union Railway, 1838, [24] the Lancaster and Preston Junction Railway, 1840, [25] the Lancaster and Carlisle Railway, 1846, [26] the Caledonian Railway, 1847–1848, [27] the Wishaw and Coltness Railway, 1841, [28] the Caledonian Railway, 1849, [27] the Polloc and Govan Railway, 1840, [27] and the Caledonian Railway, 1879. [27]

The former W&NR line remains in use at the present day from Bank Quay station to Newton. The West Coast Main Line diverges at Winwick Junction to take the 1867 curve. The original southern section to Dallam has closed. The Three Pigeons public house, (still extant in 2020) is adjacent to the location of the Dallam terminal. Reed says that "It has been surmised that the Three Pigeons, erected as a public house shortly before the railway, may have served by the good offices of the then landlord, as a booking office for the W. &. N. This seems unlikely; it is at the outer end of the whole station area, and with Warrington as it was in 1831–37 most passengers would come in at the town end from Bewsey Lane and Foundry Lane, and not along Tanner's Lane; and the station building would be of ample size to provide booking accommodation and a waiting room."

Notes

  1. Dallum was the contemporary spelling of Dallam.
  2. Reed, page 18, quoting research by Mr E Craven, rebutting the previous claims of opening on 25 July 1831.
  3. It is not clear where these were.
  4. According to Reed; Holt and Biddle, page 96, say 1 January

Related Research Articles

<span class="mw-page-title-main">Grand Junction Railway</span> Former railway company in England

The Grand Junction Railway (GJR) was an early railway company in the United Kingdom, which existed between 1833 and 1846 when it was amalgamated with other railways to form the London and North Western Railway. The line built by the company was the first trunk railway to be completed in England, and arguably the world's first long-distance railway with steam traction.

<span class="mw-page-title-main">Liverpool and Manchester Railway</span> Railway in England

The Liverpool and Manchester Railway (L&MR) was the first inter-city railway in the world. It opened on 15 September 1830 between the Lancashire towns of Liverpool and Manchester in England. It was also the first railway to rely exclusively on locomotives driven by steam power, with no horse-drawn traffic permitted at any time; the first to be entirely double track throughout its length; the first to have a true signalling system; the first to be fully timetabled; and the first to carry mail.

The Manchester and Birmingham Railway was built between Manchester and Crewe and opened in stages from 1840. Between Crewe and Birmingham, trains were worked by the Grand Junction Railway. The M&BR was merged into the London and North Western Railway in 1846.

<span class="mw-page-title-main">Manchester, Sheffield and Lincolnshire Railway</span> Former British railway company

The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed in 1847 when the Sheffield, Ashton-under-Lyne and Manchester Railway joined with authorised but unbuilt railway companies, forming a proposed network from Manchester to Grimsby. It pursued a policy of expanding its area of influence, especially in reaching west to Liverpool, which it ultimately did through the medium of the Cheshire Lines Committee network in joint partnership with the Great Northern Railway and the Midland Railway.

<span class="mw-page-title-main">Earlestown railway station</span> Railway station in Merseyside, England

Earlestown railway station is a railway station in Earlestown, Merseyside, England, and one of the few "triangular" stations in Britain.

The Ashton, Stalybridge and Liverpool Junction Railway was opened in 1846 to connect the industrial town of Ashton-under-Lyne to the developing railway network, and in particular to the port of Liverpool. It was a short line, joining the Manchester and Leeds Railway at Miles Platting and the connection to Liverpool was over that line and the Liverpool and Manchester Railway.

The Bolton and Leigh Railway (B&LR) was the first public railway in Lancashire. It opened for goods on 1 August 1828, and thus preceded the Liverpool and Manchester Railway (L&MR) by two years. Passengers were carried from 1831. The railway operated independently until 1845 when it became part of the Grand Junction Railway.

The North Union Railway was an early British railway company, operating two main routes, from Parkside to Preston and from Bolton Trinity Street to Preston, all in Lancashire. The northerly part of the routes sharing the line from Euxton to Preston.

<span class="mw-page-title-main">Warrington Central railway station</span> Railway station in Warrington, England

Warrington Central railway station is one of three main railway stations serving the town of Warrington in Cheshire, England. It is located on the southern route of the Liverpool to Manchester Lines, being situated approximately halfway between the two cities.

<span class="mw-page-title-main">Chester–Birkenhead line</span>

The Chester–Birkenhead line runs from Chester to Birkenhead via Hooton. Today, it forms part of the Wirral Line network, a commuter rail system operated by Merseyrail. The line was built by the Chester and Birkenhead Railway and opened on 23 September 1840. On 22 July 1847 the railway merged with the Birkenhead, Lancashire and Cheshire Junction Railway which was later renamed to Birkenhead Railway.

<span class="mw-page-title-main">Newton-le-Willows railway station</span> Railway station in Newton-le-Willows, Merseyside

Newton-le-Willows railway station is a railway station in the town of Newton-le-Willows, in the Metropolitan Borough of St Helens, and at the edge of the Merseytravel region. The station is branded Merseyrail. The station is situated on the northern route of the Liverpool to Manchester Line, the former Liverpool and Manchester Railway which opened in 1830. It is a busy feeder station for nearby towns which no longer have railway stations, such as Golborne, Billinge and Haydock. There is also a complimentary bus shuttle service to Haydock Park Racecourse on certain racedays.

<span class="mw-page-title-main">Birkenhead Railway</span>

The Birkenhead Railway was a railway company in North West England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting the port of Birkenhead and the city of Chester with the manufacturing districts of Lancashire by making a junction near Warrington with the Grand Junction Railway. The BL&CJR took over the Chester and Birkenhead Railway in 1847, keeping its own name for the combined company until it shortened its name to the Birkenhead Railway in 1859. It was taken over jointly, on 1 January 1860, by the London and North Western Railway (LNWR) and the Great Western Railway (GWR). It remained a joint railway until nationalisation of the railways in 1948.

The Crewe and Shrewsbury Railway was a railway company which was previously owned by the London and North Western Railway (LNWR), built to connect Crewe with the Shrewsbury and Hereford Railway which was jointly owned with GWR.

Parkside railway station was an original station on the Liverpool and Manchester Railway. It then became the interchange station between lines when the Wigan Branch Railway opened in 1832, moving to the physical junction of the two lines in 1838. The station continued as an interchange until being by-passed in 1847 when a west curve was opened to facilitate north–south links that did not go through the station. Traffic declined further after the Winwick cut-off opened in 1864 leading to closure in 1878.

Golborne South railway station was one of two stations serving the town of Golborne, to the south of Wigan.

<span class="mw-page-title-main">Lowton railway station</span> Former railway station in England

Lowton railway station served the village named Town of Lowton to the east of Newton-le-Willows and south of Golborne.

<span class="mw-page-title-main">Preston Brook railway station</span> Former railway station in England

Preston Brook railway station was a station on the Grand Junction Railway serving the villages of Preston Brook and Preston on the Hill in what was then Cheshire, England. It opened on 4 July 1837 when the line opened.

Basford railway station was a station on the Grand Junction Railway serving the villages of Basford, Hough and Weston in what was then Cheshire, England.

The Wigan Branch Railway was a short-lived early British railway company, formed in 1830 and operating from 1832 to 1834 in Lancashire. It was constructed to link Wigan and the surrounding coalfield to the Liverpool and Manchester Railway (L&MR). It was involved in the first parliamentary approved amalgamation of railways to become part of the North Union Railway. Most of the line eventually became part of the West Coast Main Line (WCML).

The Kenyon and Leigh Junction Railway (K&LJR) was constructed to link the Bolton and Leigh Railway (B&LR), which terminated at the Leigh Branch of the Leeds and Liverpool Canal, with the Liverpool and Manchester Railway (L&MR) at Kenyon.

References

  1. M D Greville, Chronological List of the Railways of Lancashire, 1828 - 1939, Transactions of the Historic Society of Lancashire and Cheshire, vol 105, 1953, reprint, page 189
  2. 1 2 3 4 5 6 Geoffrey Holt and Gordon Biddle, A Regional History of the Railways of Great Britain: volume 10: the North West, David St John Thomas, Nairn, 1986, ISBN   0 946537 34 8, pages 23 and 24
  3. 1 2 Donald J Grant, Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017, ISBN   978 1785893 537, page 584
  4. 1 2 3 Brian Reed, Crewe to Carlisle, Ian Allan, Shepperton, 1969, SBN   7110 0057 3, pages 14 and 15
  5. 1 2 Reed, page 17
  6. Reed, page24
  7. Reed, page 16
  8. 1 2 3 Reed, pages 18 and 23
  9. 1 2 Greville, page 190
  10. Norman W Webster, Britain's First Trunk Line: The Grand Junction Railway, Adams and Dart, Bath, 1972, ISBN   0239 00105 2, page 22
  11. 1 2 Webster, page 44
  12. Francis Whishaw, The Railways of Great Britain and Ireland, John Weale, London, 1842, page 126
  13. Grant, page 230
  14. Webster, page 66
  15. Reed, pages 20 and 21
  16. 1 2 3 Reed, page 31
  17. George P Neele, Railway Reminiscences, McCorquodale & Co, London, 1904, page 184
  18. Holt and Biddle, page 96
  19. Greville, page 188
  20. M C Reed, London and North Western Railway: A History, 1996, by Atlantic Transport Publishers, Penryn, ISBN   0 906899 66 4, pages 3 and 5
  21. Peter Lee, The Trent Valley Railway (Rugby - Stafford 1847-1966), Trent Valley Publications, Burton-upon-Trent, 1988, ISBN   0-948131-15-2, page 6
  22. Webster, page 90
  23. Reed, page 32
  24. Bob Gregson, The London and North Western Railway around Preston, Atkinson Publications Ltd, Preston, 2012, ISBN   978 1 909134 02 7, page 22
  25. Gregson, page 22
  26. Reed, page 154
  27. 1 2 3 4 David Ross, The Caledonian: Scotland's Imperial Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1840 335842
  28. Grant, pages 619 and 620

See also

"Warrington Dallam Lane". Disused Stations. Subterranea Britannica. Retrieved 23 January 2015.