William Corin

Last updated

William Corin (13 October 1867- 2 March 1929) was an English-born electrical engineer, who undertook some of the early design of the Snowy Mountains Hydro-Electricity Scheme in Australia.

He was born in Kent, England and was educated at King's College School and University College, London. He worked as a civil engineer after graduating until 1891 when he became an electrical engineer. He migrated to Tasmania in 1895.

In Australia his interest in electrical engineering took off. He designed the Duck Reach Power Station and made early surveys for the Great Lakes schemes. In 1907 he was made Chief Electrical Engineer to the New South Wales Department of Public Works. He was in charge of the generation of thermal electricity. In 1915 he commenced writing a series of reports on a Snowy River scheme. In 1920 Corin estimated the cost of the Snowy River scheme at £2 million and that it would produce 1,500GwH of power. [1] He worked for both the British and French Governments on projects in Fiji and New Caledonia. Finding working in the Government uncongenial he resigned in 1923 to undertake private consulting.

He died of cancer in Sydney in 1929 and is buried in the Northern Suburbs cemetery.

Corin Dam in the Australian Capital Territory is named after him.

Related Research Articles

<span class="mw-page-title-main">Snowy Mountains Scheme</span> Dam in Kosciuszko National Park, New South Wales

The Snowy Mountains Scheme, also known as the Snowy Hydro or the Snowy scheme, is a hydroelectricity and irrigation complex in south-east Australia. Near the border of New South Wales and Victoria, the scheme consists of sixteen major dams; nine power stations; two pumping stations; and 225 kilometres (140 mi) of tunnels, pipelines and aqueducts that were constructed between 1949 and 1974. The Scheme was completed under the supervision of Chief Engineer, Sir William Hudson. It is the largest engineering project undertaken in Australia.

<span class="mw-page-title-main">Hydro Tasmania</span> Government hydro electricity provider in Tasmania, Australia

Hydro Tasmania, known for most of its history as the Hydro-Electric Commission (HEC) or The Hydro, is the trading name of the Hydro-Electric Corporation, a Tasmanian Government business enterprise which is the predominant electricity generator in the state of Tasmania, Australia. The Hydro was originally oriented towards hydro-electricity, due to Tasmania's dramatic topography and relatively high rainfall in the central and western parts of the state. Today Hydro Tasmania operates thirty hydro-electric and one gas power station, and is a joint owner in three wind farms.

Snowy Hydro Limited is an electricity generation and retailing company in Australia that owns, manages, and maintains the Snowy Mountains Hydro-electric Scheme that consists of nine hydro-electric power stations and sixteen large dams connected by 145 kilometres (90 mi) of tunnels and 80 kilometres (50 mi) of aqueducts located mainly in the Kosciuszko National Park. Snowy Hydro also owns and operates two gas-fired power stations in Victoria and one in New South Wales, three diesel power stations in South Australia and owns two electricity retailing businesses, Red Energy and Lumo Energy.

<span class="mw-page-title-main">Manawa Energy</span> New Zealand electricity generation and retailing company

Manawa Energy limited is a New Zealand electricity generation company that offers bespoke electricity products to commercial and industrial customers across New Zealand. Manawa energy currently operate 26 power schemes from the Bay of Plenty in the north, to Otago in the south.

<span class="mw-page-title-main">Guthega, New South Wales</span> Town in New South Wales, Australia

Guthega is an alpine village and the site for a hydro electric dam located in the Kosciuszko National Park, on the upper reaches of the Snowy River, on the western face of Mount Blue Cow, Snowy Mountains of New South Wales, Australia.

<span class="mw-page-title-main">Murray Hydroelectric Power Station</span> Dam in Snowy Mountains, New South Wales

The Murray Region Hydroelectric Power Stations refers to two of the original seven hydroelectric power stations, both located near the town of Khancoban in the Snowy Mountains region of New South Wales, Australia. The two power stations are part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro. Although both power stations are physically located in New South Wales, since 1 July 2008 all power generated has been allocated to the Victorian region of the National Electricity Market. The stations are not located on the Murray River.

<span class="mw-page-title-main">Tumut Hydroelectric Power Station</span> Power stations in New South Wales, Australia

The Tumut Hydroelectric Power Stations is a series of three hydroelectric power stations on the Tumut River in New South Wales, Australia, that are part of the Snowy Mountains Scheme.

<span class="mw-page-title-main">Kiewa Hydroelectric Scheme</span>

The Kiewa Hydroelectric Scheme is the largest hydro-electric scheme in the Australian state of Victoria and the second-largest in mainland Australia after the Snowy Mountains Scheme. The scheme is situated in the Australian Alps in north-eastern Victoria about 350 kilometres from Melbourne and is wholly owned by AGL Energy.

<span class="mw-page-title-main">Tantangara Dam</span> Dam in Snowy Mountains, New South Wales

Tantangara Dam is a major ungated concrete gravity dam with concrete chute spillway across the Murrumbidgee River in Tantangara, upstream of Adaminaby in the Snowy Mountains region of New South Wales, Australia. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro. The purpose of the dam includes water management and conservation, with much of the impounded headwaters diverted to Lake Eucumbene. The impounded reservoir is called Tantangara Reservoir.

<span class="mw-page-title-main">Talbingo Dam</span> Dam in Snowy Mountains, New South Wales

Talbingo Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway across the Tumut River upstream of Talbingo in the Snowy Mountains region of New South Wales, Australia. The impounded reservoir is called Talbingo Reservoir.

<span class="mw-page-title-main">Tooma River</span> River in New South Wales, Australia

Tooma River, a perennial stream that has had some of its flow diverted as a result of the Snowy Mountains Scheme, is part of the Murray catchment within the Murray–Darling basin and is located in the Australian Alpine region of New South Wales, Australia.

<span class="mw-page-title-main">William Hudson (engineer)</span>

Sir William Hudson was a New Zealand-born engineer who headed construction of the Snowy Mountains Scheme for hydroelectricity and irrigation in Australia from 1949 to 1967, when he reluctantly retired at 71. The scheme was completed in 1974, under budget and before time.

<span class="mw-page-title-main">Walter Diesendorf</span>

Walter Diesendorf (1906–1975), was an Austrian-born Australian electrical engineer known for his work on high-voltage transmission systems, in particular for the Snowy River Hydro-electric Scheme.

Donald Charles Boulton Maclurcan was an Australian architect. As a senior partner of Fowell, Mansfield and Maclurcan, he designed or directed the design of a wide range of building types, from individual houses to important infrastructure projects.

Sir Standen Leonard Pearce was an English electrical engineer, perhaps best remembered for designing Battersea Power Station, on which he was assisted by Sir Giles Scott and the architectural practice Halliday and Agate. He was a key player in rationalising electricity supply in Britain and in the design of cleaner and more efficient power stations.

<span class="mw-page-title-main">D. J. Wimalasurendra</span>

Devapura Jayasena Wimalasurendra was a Sri Lankan engineer and statesman. He played a prominent role in the establishment of hydropower in Sri Lanka and is known as the "Father of Hydropower" and was a member of the State Council of Ceylon.

Tumut Two Dam or Tumut Two is a major ungated concrete gravity dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Guthega Dam</span> Dam in Snowy Mountains, New South Wales

Guthega Dam is concrete gravity dam with an uncontrolled spillway across the Snowy River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the storage of water used in the generation of hydro-power. It is the first to be completed of the sixteen major dams of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

Khancoban Dam is a major ungated earthfill embankment dam with a controlled spillway across the Swampy Plain River in the Snowy Mountains region of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

<span class="mw-page-title-main">Mullumbimby Hydro-electric Power Station Complex</span> Historic site in New South Wales, Australia

Mullumbimby Hydro-electric Power Station Complex is a heritage-listed former hydroelectric power station at Wilsons Creek Road, Mullumbimby, Byron Shire, New South Wales, Australia. It was designed by William Corin and built from 1924 to 1926. It is also known as Lavertys Gap Power Station and Mullumbimby Power Station and Substation. The property is owned by the Byron Shire Council and Essential Energy. It was added to the New South Wales State Heritage Register on 27 June 2014.

References