Bethlehem Atlantic Works

Last updated

Schooner William Booth at Atlantic Works in 1910 Schooner William Booth at Atlantic Works, 1910.jpg
Schooner William Booth at Atlantic Works in 1910

Bethlehem Atlantic Works of East Boston, Massachusetts, was a shipyard in the United States from 1853 until 1984. [1] It was owned by the Bethlehem Shipbuilding Company. It is located directly to the west of the East Boston Immigration Station. The company's offices were in the Atlantic Works Warehouse, built in 1893.

Contents

History (1853–1976)

It began as two separate shipyards. There was the East Boston Dry Dock Company which started in 1853 along Chelsea and Marion streets by Samuel Hall, who later moved to Border Street in 1893 when they became the Atlantic Works where they constructed a three-story building that still stands. Then there was the Simpson Dry Dock Company, owned by James E. Simpson along Jeffries Point on Marginal Street facing the Boston Harbor. In 1922 the Atlantic Works was purchased by Bertelson & Peterson Company, and in 1928 Bethlehem Steel purchased both Atlantic Works and the Simpson Yard and renamed them Bethlehem Atlantic divisions of Bethlehem Steel.

Propellers of Navy ship undergoing overhaul dwarf workers in 1982. East Boston Shipyard .jpg
Propellers of Navy ship undergoing overhaul dwarf workers in 1982.

As far back as the Civil War and during WWI, the Navy used the service of these companies to repair most of their damaged fleet. The Atlantic Works received heavy use during WWII employing up to 1000 men, where they were used to repair Naval and Coast Guard fleet. They were the largest private ship repair facility in Boston for over a century which included a steam-powered floating dry dock capable of lifting 500-ton ships. Its 600-foot-long marine railway had a cradle with an unprecedented capacity of 1000 tons. Railways with capacities of 1500, 2000, and 2500 tons were built later–all by Crandall Dry Dock Engineers. [2] During the same time period the Bethlehem-Simpson docks were employing over 6000 men. During the 1950s and 1960s the Bethlehem Steel corporations were going through a series of bankruptcies and downsizing in New England. In 1951 they sold Atlantic Works and closed down the shipyard, and they also sold off Fore River to General Dynamics in 1964.

The Simpson Docks remained the last shipyard owned by Bethlehem Steel in Massachusetts that continued until the year 1984. During its history they operated the largest railway in Boston and second largest in the country. For most of its life it was referred to by locals as the "East Boston Yard". One of their largest later projects was a $6.6 million contract to overhaul the destroyer USS Forrest Sherman in 1976. They also constructed a new Buzzards Bay and Brenton Reef light towers in a 1961 and 1962 project costing $1.5 million, the main navigational aid for all shipping bound for Cape Cod canal. [3]

Race controversies (1976–1984)

During the late 1970s and 1980s there were a series of racial assaults and attacks along this shipyard at the height of the Boston desegregation busing crisis. First on July 1, 1976, when it was reported that five youth threw rocks and bottles at black seaman Kevin A. Kaminsky aboard the USS Blandy and four other black men as they waited at a bus stop on their way back to the shipyard. On July 15, a molotov cocktail was thrown at a black sailor aboard the ship. [4] Two years later in July 1978 five black sailors were jumped by a "gang of whites wielding sticks". No arrests were made. On July 13, sailor Anthony McGhee aboard the USS Barry was stabbed in the back twice by a group of 12–20 persons gathered near the corner of Monument and Bunker Hill streets. One day later on July 14, 1980, Seaman Michael J. Robinson, 25, of Cincinnati, stationed aboard the USS Edson, was beaten with a baseball bat during a fight between a group of black sailors and a group of local youths. He died 10 days later at Massachusetts General Hospital. [5]

US Navy frigate Connole held hostage in East Boston yard. Navy Hostage Again.png
US Navy frigate Connole held hostage in East Boston yard.

Following these incidents, Navy Captain Louis Schappicchio announced they would be pulling all of their ships out of the East Boston yard, until Senator Edward Kennedy and East Boston community representatives met with Navy officials to discuss ways of abating violence. However Bethlehem Steel decided to pull out of East Boston less than two years later and called for the closing of the shipyard after they could not find a buyer. A buyer was eventually found when a group of investors led by the former general manager of a small shipyard in Chelsea agreed to buy the yard and perform an investigation into ways to control violence and crime. [6]

During 1982–1984 a total of 68 ships were repaired for the Navy at this yard. In April 1984 another major race attack happened when a black sailor aboard the USS Valdez was stabbed by a gang of men walking across Maverick Square. [7] Following this incident the Navy abruptly pulled out with zero notice leaving workers stunned when they showed up on the cold morning of September 21 for work to equipment removed and tools tossed out. The Navy released a statement the following day stating that workplace safety of the East Boston Shipyard was not proceeding according to Navy Standards.

In response to the immediate shutdown, Senator Kennedy and Boston Mayor Raymond Flynn ordered the workers to lock the $18 million dollar USS Connole mast between the booms of two huge cranes and ordered flotation buoys placed across its stern, essentially holding the Navy hostage. Mayor Flynn remarked "The whole issue is what is the Navy's commitment to Boston? These are important jobs for you but they are also important jobs for the city's economy. I support the workers blockade." [8] The standoff received international press coverage and lasted a total of 4 days, only ending when the Navy went to US district Judge Robert E. Keeton for a restraining order on the workers, who ordered federal marshals into the shipyard to unlock the ship and remove employees from the job site. A total of 460 union workers lost their jobs, affecting huge chunks of families in the East Boston area. This would mark the second to last major shipyard in Massachusetts to close down, and one of the oldest shipyards in the entire country.

Modern use today

In 1985 the land was auctioned off to Massachusetts Port Authority for $10 million, after they doubled their offer to outbid all other industrial developers who were looking to rebuild the yard during the Reagan administration. [9] The original highest bid for the shipyard was $9.1 million by a Boston developer, Eastmare Corp. Eastmare planned to develop the property for commercial and residential uses, as well as construct a marina there. However when final bidding opened up, Massport raised its initial $5.5 million offer to $10 million. The next closest bid was $9.7 million by Simpson Point Associates of Boston. Massport stated its determination to preserve industry and stop the spread of luxury condominiums along Boston's waterfront, Massport Deputy Director stating "We didn't want it to be turned into condos." [9]

Not everyone was pleased at the time including the Executive Director of East Boston Community Development who stated "Massport has owned the adjoining East Boston piers for more than a decade and done nothing with them. We're talking about more than 100 acres of East Boston waterfront and nothing's happening with it." [9] Original proposals included building an industrial park that was to include a yacht construction facility as well as a ferry and submarine repair yard that would be completed by the year 1988. These plans were never approved by the city and large chunks of original land today have since been auctioned off to luxury housing along the Boston waterfront.

In recent time the original Atlantic Works site on Border Street hosts the Atlantic Works Gallery, a community center and collaborative space for art and ideas. On the original Bethlehem-Simpson site along Jeffries Point on Marginal Street sits a variety of condo developments, recreational centers, and abandoned lots on what is known as the "Massport Marina". The city of Boston would never return to shipbuilding as competition moved to other regions of the country and overseas, and the headquarters for shipbuilders union would relocate out of Quincy.

See also

Related Research Articles

<span class="mw-page-title-main">Norfolk Naval Shipyard</span> American Navy Shipyard

The Norfolk Naval Shipyard, often called the Norfolk Navy Yard and abbreviated as NNSY, is a U.S. Navy facility in Portsmouth, Virginia, for building, remodeling and repairing the Navy's ships. It is the oldest and largest industrial facility that belongs to the U.S. Navy as well as the most comprehensive. Located on the Elizabeth River, the yard is just a short distance upriver from its mouth at Hampton Roads.

USS <i>Boston</i> (CA-69) US Navy guided missile cruiser

USS Boston (CA-69/CAG-1), a Baltimore-class heavy cruiser and later a Boston-class guided missile cruiser, was the sixth ship of the United States Navy to be named for the U.S. city of Boston, Massachusetts. Boston was launched 26 August 1942 by Bethlehem Steel Company's Fore River Shipyard in Quincy, Massachusetts, sponsored by Mrs Helen Noonan Tobin, wife of the Mayor of Boston, Maurice J. Tobin, and commissioned 30 June 1943.

USS <i>Albany</i> (CA-123) Heavy cruiser of the United States Navy

USS Albany (CA-123) was a United States Navy Oregon City-class heavy cruiser, later converted to the guided missile cruiser CG-10. The converted cruiser was the lead ship of the new Albany guided missile cruiser class. She was the fourth ship to carry the name Albany.

<span class="mw-page-title-main">Boston Navy Yard</span> Shipbuilding facility in the United States Navy

The Boston Navy Yard, originally called the Charlestown Navy Yard and later Boston Naval Shipyard, was one of the oldest shipbuilding facilities in the United States Navy. It was established in 1801 as part of the recent establishment of the new U.S. Department of the Navy in 1798. After 175 years of military service, it was decommissioned as a naval installation on 1 July 1974.

USS <i>Salem</i> (CA-139) Des Moines-class cruiser of the United States Navy

USS Salem (CA-139) is a Des Moines-class heavy cruiser completed for the United States Navy shortly after World War II and commissioned in 1949. The second ship of her class, she was the world's last heavy cruiser to enter service and is the last remaining. She was decommissioned in 1959 after serving in the Atlantic and Mediterranean. She is open to the public as a museum ship in Quincy, Massachusetts.

Avondale Shipyard was an independent shipbuilding company, acquired by Litton Industries, in turn acquired by Northrop Grumman Corporation. In 2011, along with the former Ingalls Shipbuilding, the yard was part of Huntington Ingalls Industries. It closed in October 2014. The yard was located on the west bank of the Mississippi River in an area called Bridge City, about 20 miles (32 km) upriver from New Orleans near Westwego, Louisiana. It was the site of the modernization of the battleship USS Iowa in the early 1980s and also constructed some of the lighter aboard ships (LASH). At one time, it was the largest employer in Louisiana, with about 26,000 employees.

<span class="mw-page-title-main">Union Iron Works</span> San Francisco American shipyard company

Union Iron Works, located in San Francisco, California, on the southeast waterfront, was a central business within the large industrial zone of Potrero Point, for four decades at the end of the nineteenth and beginning of the twentieth centuries.

<span class="mw-page-title-main">Battleship Cove</span> Maritime museum in Fall River, Massachusetts, US

Battleship Cove is a nonprofit maritime museum and war memorial in Fall River, Massachusetts, United States. Featuring the world's largest collection of World War II-era naval vessels, it is home to the highly-decorated battleship USS Massachusetts. It is located at the heart of the waterfront at the confluence of the Taunton River and Mount Hope Bay and lies partially beneath the Braga Bridge and adjacent to Fall River Heritage State Park.

<span class="mw-page-title-main">Bethlehem Shipbuilding Corporation</span> 1905–1997 shipbuilding company in the United States

Bethlehem Steel Corporation Shipbuilding Division was created in 1905 when the Bethlehem Steel Corporation of Bethlehem, Pennsylvania, acquired the San Francisco-based shipyard Union Iron Works. In 1917 it was incorporated as Bethlehem Shipbuilding Corporation, Limited.

<span class="mw-page-title-main">Fore River Shipyard</span> Shipyard in Massachusetts, United States

Fore River Shipyard was a shipyard owned by General Dynamics Corporation located on Weymouth Fore River in Braintree and Quincy, Massachusetts. It began operations in 1883 in Braintree, and moved to its final location on Quincy Point in 1901. In 1913, it was purchased by Bethlehem Steel, and later transferred to Bethlehem Shipbuilding Corporation. It was sold to General Dynamics in 1963, and closed in 1986. During its operation, yardworkers constructed hundreds of ships, for both military and civilian clients.

<span class="mw-page-title-main">Pearl Harbor Naval Shipyard</span> United States Navy shipyard in Hawaii

The Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility is a United States Navy shipyard located in Pearl Harbor, Hawaii on 148 acres. It is one of just four public shipyards operated by the United States Navy. The shipyard is physically a part of Joint Base Pearl Harbor–Hickam.

<span class="mw-page-title-main">Massachusetts Port Authority</span> Port authority in the Commonwealth of Massachusetts

Massachusetts Port Authority (Massport) is the port authority for the Commonwealth of Massachusetts. It owns and operates three airports, Logan International Airport, Hanscom Field, and Worcester Regional Airport, and public terminals in the Port of Boston.

<span class="mw-page-title-main">Port of Boston</span> Seaport district in Boston, Massachusetts

The Port of Boston is a major seaport located in Boston Harbor and adjacent to the City of Boston. It is the largest port in Massachusetts and one of the principal ports on the East Coast of the United States.

Maryland Steel, in Sparrows Point, Maryland, US, was founded in 1887. It was acquired by Bethlehem Shipbuilding Corporation in 1916 and renamed as the Bethlehem Sparrows Point Shipyard. The shipyard was sold in 1997 to Baltimore Marine Industries Inc. In 2012, it was owned by Barletta Industries, which had converted it to the Sparrows Point Shipyard and Industrial Complex. As of 2021, it is owned by Sparrows Point Terminal, LLC and has been renamed Tradepoint Atlantic.

<span class="mw-page-title-main">United States Naval Shipbuilding Museum</span> Museum ship in Quincy, Massachusetts

The United States Naval Shipbuilding Museum is a private non-profit museum in Quincy, Massachusetts featuring USS Salem (CA-139), a heavy cruiser docked at the former Fore River Shipyard where she was laid down in 1945. The museum was established in 1993, in response to efforts by local officials and volunteers to revive the shipyard area after operations at Fore River ended in 1986. Several exhibits are on board Salem relating to United States naval history and shipbuilding. Before being moved to a different pier, the museum featured dockside fixtures and a miniature golf course.

<span class="mw-page-title-main">South Boston Naval Annex</span>

The South Boston Naval Annex was a 167-acre (68 ha) United States Navy shipyard annex located in South Boston. It was the annex of the Boston Navy Yard, and was operational from the 1920 to 1974, when it was closed along with the main shipyard. The annex is also home to Dry Dock Number 3, one of the largest dry docks on the East Coast. Most of the former annex site was listed on the National Register of Historic Places in 2022.

Sullivan Drydock and Repair Corporation was a shipyard located in Brooklyn, New York. It was located off 23rd Street in Greenwood Heights/Sunset Park, in the Tebo Basin. Sullivan DD&RC built Submarine chasers, and altered, repaired and converted ships for various branches of the US military during World War II.

<span class="mw-page-title-main">Bethlehem Key Highway Shipyard</span> American shipyard company

Bethlehem Key Highway Shipyard started as William Skinner & Sons in downtown Baltimore, Maryland in 1815. In 1899 the shipyard was renamed Skinner Shipbuilding & Dry Dock Company. Also at the site was Malster & Reanie started in 1870 by William T. Malster (1843–1907). In 1879 Malster partnered with William B. Reaney (1808-1883). In 1880 Malster & Reanie was sold and renamed Columbian Iron Works & Dry Dock Company. Malster & Reanie and Skinner Shipbuilding & Dry Dock Company merged in 1906, but remained as Skinner Shipbuilding. In 1914 the company was renamed Baltimore Dry Dock & Shipbuilding Company. Baltimore Dry Dock & Shipbuilding Company sold to Bethlehem Steel in 1922, becoming part of Bethlehem Shipbuilding Corporation. Bethlehem Steel operated the shipyard for ship repair, conversion and some ship construction. Bethlehem's main ship construction site was across the harbor at Bethlehem Sparrows Point. Bethlehem Key Highway Shipyard was known as the Bethlehem Upper Yard located north-east side of Federal Hill. Bethlehem Fort McHenry Shipyard located on the west side of Locust Point peninsula was known as the Lower Yard, near Fort McHenry.

Hoboken Shipyard or Hoboken Yard or Beth Steel Hoboken was a Bethlehem Shipbuilding Corporation shipyard that operated from 1938 to 1982 in Hoboken, New Jersey. Bethlehem Steel purchased the shipyard in 1938.

<span class="mw-page-title-main">Bethlehem Sabine Shipyard</span> US Shipyard in Texas

Bethlehem Sabine Shipyard, or Sabine Shipyard was a 223-acre shipyard of Bethlehem Steel in Port Arthur, Texas. The Bethlehem Shipbuilding Corporation's Sabine Shipyard opened in August 1985. The yard serviced offshore drilling rigs and ships. The Sabine Shipyard had a nation's largest floating drydock. Bethlehem purchased the United States Navy surplus drydock, USS ABSD-5 that was at Pearl Harbor, Hawaii. USS ABSD-5 seven-sections were tugged to the Sabine Yard arriving in December 1984. USS ABSD-5 has a lift capacity of 64,000 tons.

References

  1. Atlantic Works – East Boston Community Development Corporation
  2. "Ship Repair in East Boston". Boston Harbor Now Group.
  3. Coughlin, William (August 14, 1977). "Checking out a tower's legs ultrasonically". The Boston Globe. p. 33.
  4. Longcope, Kay (July 21, 1976). "Navy Shaken by East Boston crime". The Boston Globe. p. 12.
  5. Scanzoni, David (August 5, 1980). "Grand jury action ordered in sailor stabbing case". The Boston Globe. p. 14.
  6. Wessel, David (December 24, 1982). "Investor group to purchase Bethlehem's E. Boston yard". The Boston Globe. p. 33.
  7. Staff Writers (April 15, 1984). "Sailor attacked in E. Boston". The Boston Globe. p. 50.
  8. Langner, Paul (September 30, 1984). "Navy ship seized by workers in E. Boston". The Boston Globe. p. 33.
  9. 1 2 3 Mohl, Bruce (November 13, 1985). "Shipyard land goes to Massport for $10m". The Boston Globe. p. 1.

42°21′51.87″N71°2′6.83″W / 42.3644083°N 71.0352306°W / 42.3644083; -71.0352306