Boscombe Surf Reef was an artificial reef built to enhance surfing conditions at Boscombe in Dorset, England.
The Boscombe Surf Reef was the first surfing reef to be constructed in the Northern Hemisphere. [1] Boscombe, a district of Bournemouth, opted to build a surfing reef to provide a unique focal point for the town's multi-million pound waterfront redevelopment effort, with Bournemouth Borough Council hoping that the reef would "give Boscombe beach its own identity, raise the profile of Boscombe and attract a large number of visitors on an annual basis.” In April 2014, after being closed since March 2011, the council re-branded the reef as a coastal activity park concentrating on diving and wind surfing, as well as kite and wind surfing. [2]
The idea came originally from David Weight, a member of Wessex Surf Club, whose proposals to Bournemouth council and initial research date from 1993. The reef is thus sometimes referred to as "Weights Reef". [3] The reef covers approximately one hectare and is located 225 metres from the Beach. Like most of the other reefs built to date, the Boscombe Reef was built from large sand-filled geotextile containers. With a total volume of 13,000 m3, the reef was designed purely as a surfing break.[ citation needed ]
A study undertaken for Bournemouth council shows that prior to the reef there were 77 good surfing days annually, although surfing took place on 153 days, with a total of 5,000 surf visits to Boscombe per year. The intention was that the reef would double the number of good surfing days and it was hoped this would generate 10,000 visits. The original estimate for designing and building the reef was £1.4 million. The eventual cost was £3 million for the reef, and a total of £11 million for the redevelopment of the seafront area and the refurbishment of the pier. This was funded by the sale of a car park on which Barratt Developments constructed the Honeycombe Chine Flats complex, and the sale of Beach Pods which formed part of the Overstrand building.[ citation needed ]
Date | Event |
---|---|
11 Oct 1999 | Bournemouth Council approve Feasibility Study |
15 Nov 1999 | Approval of Feasibility study specification and costs |
16 Jun 2000 | Bournemouth Council Tourism committee recommend proceeding in Principle |
19 Nov 2003 | Bournemouth Council Cabinet approve leisure content of Boscombe Spa Village proposals, including the surf reef, and, in principle, the potential full use of the capital receipt from the housing development for the leisure proposals. |
06 Nov 2004 | Authority given by Councillor Angela Manton, Cabinet Member for Strengthening Our Economy, to procure the Field Studies Data and Initial Design Study for the surf reef through ASR Ltd. |
23 Feb 2005 | Revised Boscombe Spa Village leisure proposals, following listing of Pier Entrance building, submitted to Cabinet. Cabinet/Council approved the land-based proposals but requested a presentation from ASR Ltd on the initial designreport for the surf reef for the Cabinet to consider. |
10 Jan 2007 | First Phase of Works begins with the restoration of the Pier [4] |
Feb 2007 | Permissions for the reef submitted to DEFRA |
Jun 2007 | Fisherman raise objections with DEFRA [5] |
Oct 2007 | Approval for the Surf Reef granted by DEFRA |
30 Aug 2008 | Works starts on Construction by ASR |
13 Nov 2008 | Work Suspended for Winter [6] |
18 Apr 2009 | Work Restarts [7] |
Sep 2009 | Work completed, but opening delayed for safety checks and the right surfing conditions |
19 Nov 2009 | Reef Declared Officially open |
31 Mar 2011 | Reef closed for safety reasons. The council said following a scheduled six-monthly inspection, it was advising people not to use the reef while it underwent further work and maintenance, a routine inspection carried out on 23 March showed that "substantial changes" had altered the profile of the reef. [8] |
Mid August 2011 | Repair work begun by ASR |
April 2014 | Reef re-branded as Coastal Activity Park concentrating on Diving, Snorkeling, Wind & Kite Surfing as well as on shore sports. |
The reef, which was originally suggested in the late 1990s, suffered considerable delays before construction finally began in June 2008 [1] by the New Zealand Company ASR Ltd. The geotextile bags were constructed in New Zealand and positioned from a barge. They were then filled with sand which had been stockpiled on the shore from a beach replenishment project(BIS4.2) [9] the previous year. Half of the reef project was completed during the summer of 2008. Construction was suspended for the winter season and resumed the following summer. The reef was officially declared open on the 2 November 2009. [10]
In December 2010 Bournemouth Council announced that ASR would return in the spring of 2011 to make modifications to the reef. Four bags were to be situated on the south-east corner of the reef and a further three pillow bags between existing sections of the reef. The intention is that the wave depth will be improved through the gentler slope thus created, resulting in the right-hand ride length extended to 65metres. ASR will receive £55,000 on completion of this work out of the £150,000 withheld final payment. [11] In April 2011 one bag was removed and another repaired after what was suspected to be propeller damage from an unknown boat colliding with the reef. [12] The reef was closed during the summer of 2011 having been closed for safety reasons in March, in July Bournemouth Councillor Rod Cooper, Cabinet Member for Economy & Tourism announced that ASR ltd would undertake the repair work and begin the improvement work in early August. [13] ASR Ltd began the repair work in mid August 2011. [14] In October 2011 Bournemouth council announced that due to the autumn weather the repair and improvement work would not be completed until spring 2012. [15] ASR went into Liquidation in September 2012. [16] By September 2013 no further work had been undertaken and the reef remained closed. In October 2013 Mark Smith, service director for tourism at Bournemouth Council, was quoted as saying “The council has successfully reached an insurance settlement for the surf reef and so is now undertaking the necessary work to ensure the reef is safe for people to use. This is progressing well and the reef will form an integral part of the Coastal Activity Park, which is scheduled to open in Spring 2014.”. [17] Bournemouth council received £306,531 in respect of two insurance claims for damage to the reef, the council's intention being to repair the reef to its original condition and reopen it in April 2014. The council are registered as an unsecured creditor of ASR for the sum of £14,800. [18]
In November 2013 Mark Smith was further quoted as saying "The Council has made it clear that no additional taxpayers' money will be spent enhancing the reef’s performance for surfing, and that position remains unchanged. Plans include a commercial dive centre, a try-dive facility, and a dive and snorkel trail around the existing reef, with additional submerged artifacts for more experienced divers". Improvements for surfing and body boarding were not to be a priority in the work to be undertaken to make the reef safe. [19]
The area was re-branded as a Coastal Activity Park in April 2014, concentrating on diving, kite and wind surfing, along with on-shore volleyball, table tennis and gym activities. [2]
In the first 18 months after construction there have been some occasions of good surfing conditions [20] but the general reports from surfers were disappointing. [21] In May 2010 the delayed interim report on the reef's performance from Dr. Mark Davidson of Plymouth University was published; it stated that the reef had only fully achieved four out of eleven of its design objectives. ASR claimed the reef had met most of the design criteria [22] but did agree with the reports conclusion that the waves produced were shorter than the design criteria required: [23]
"The wave length is rather too intense and challenging [and it] is not quite as consistent as it should be."
— Dr. Mark Davidson, Plymouth University, May 2010 [24]
Despite the negative press surrounding Boscombe Reef, a group of dedicated local bodyboarders continued to use it regularly before and after its closure for safety reasons. [25] [26]
In November 2014 it was reported that surfers had "given up" on the reef, as it made them "a laughing stock". [27]
Surfing is a surface water sport in which an individual, a surfer, uses a board to ride on the forward section, or face, of a moving wave of water, which usually carries the surfer towards the shore. Waves suitable for surfing are primarily found on ocean shores, but can also be found in standing waves in the open ocean, in lakes, in rivers in the form of a tidal bore, or in wave pools.
Bournemouth is a coastal resort town in the Bournemouth, Christchurch and Poole council area of Dorset, England. At the 2011 census, the town had a population of 183,491, making it the largest town in Dorset. It is situated on the English south coast, equidistant from Dorchester and Southampton. Bournemouth is part of the South East Dorset conurbation, which has a population of 465,000.
AFC Bournemouth is a professional association football club based in Kings Park, Boscombe, a suburb of Bournemouth, Dorset, England. The club competes in the Premier League, the highest division of English club football. Formed in 1899 as Boscombe, the club adopted their current name in 1971. Nicknamed "The Cherries", Bournemouth have played their home games at Dean Court since 1910. Their home colours are red and black striped shirts, with black shorts and socks, inspired by that of Italian club A.C. Milan.
Boscombe is a suburb of Bournemouth, England. Historically in Hampshire, but today in Dorset, it is located to the east of Bournemouth town centre and west of Southbourne.
An artificial reef is a human-created underwater structure, typically built to promote marine life in areas with a generally featureless bottom, to control erosion, block ship passage, block the use of trawling nets, or improve surfing.
Bournemouth School is a boys' grammar school and co-educational sixth form in Charminster, Bournemouth, Dorset, England, for children aged 11 to 18.
Dean Court, currently known as the Vitality Stadium for sponsorship purposes, is a football stadium in Kings Park, Boscombe, a suburb of Bournemouth, Dorset, England and the home ground of AFC Bournemouth.
Bournemouth East is a parliamentary constituency in Dorset represented in the House of Commons of the UK Parliament since 2005 by Tobias Ellwood, a Conservative.
A beach hut is a small, usually wooden and often brightly coloured, box above the high tide mark on popular bathing beaches. They are generally used as a shelter from the sun or wind, changing into and out of swimming attire and for the safe storing of some personal belongings. Some beach huts incorporate simple facilities for preparing food and hot drinks by either bottled gas or occasionally mains electricity.
Yellow Buses was a bus operator based in Bournemouth, on the south coast of England. Yellow Buses was the trading name for Bournemouth Transport Ltd. The company fell into administration in July 2022 and ceased operations on 4 August 2022.
Wilts & Dorset is a bus and coach operator providing services in East Dorset, South Wiltshire, and West Hampshire. It operates services under the morebus brand around Bournemouth and Poole, and under the Salisbury Reds brand around Salisbury and Amesbury. It is part of Go South Coast, a subsidiary of the Go-Ahead Group.
Mark Clifford Molesley is an English football manager and former professional player who is manager of Gosport Borough. He played in the Football League for Bournemouth, Aldershot Town, Plymouth Argyle and Exeter City, and the Football Conference for Hayes, Cambridge City, Aldershot Town, Stevenage Borough and Grays Athletic.
Fibrecity Holdings was formerly owned by i3 Group and was acquired in a Management buyout in January 2011 by CityFibre Holdings Ltd following the collapse of FibreCity's principal lender Total Asset Finance.
Castlepoint is a shopping centre in Strouden Park, Bournemouth, Dorset, in the United Kingdom, occupying a 41-acre (17 ha) site containing around 40 shops, including major retailers such as Marks & Spencer, New Look, H&M, Asda, Sainsbury's, and B&Q. It is situated 3 miles (4.8 km) north-east from the centre of town, off Castle Lane West on the former site of The Hampshire Centre.
Michael Joseph Hicks was a British politician, executive member of printers’ union SOGAT, and general secretary of the Communist Party of Britain.
A multi-purpose reef, also commonly known as an artificial surfing reef or surf reef, is a structure located offshore designed to induce wave breaking in a manner that creates a wave suitable for surfing or body boarding. Artificial surfing reefs can exist in many different configurations and be built from a variety of different materials. To date there have been fewer than ten attempts worldwide to build such structures.
Teahupoʻo is a village on the southwestern coast of the island of Tahiti, French Polynesia, in the southern Pacific Ocean.
Dorset is a county in South West England on the English Channel coast. The ceremonial county comprises the area covered by the non-metropolitan county, which is governed by Dorset Council, together with the unitary authorities of Poole and Bournemouth. Dorset is an average sized county with an area of 2,653 square kilometres (1,024 sq mi); it borders Devon to the west, Somerset to the north-west, Wiltshire to the north-east, and Hampshire to the east. Around half of Dorset's population lives in the South East Dorset conurbation. The rest of the county is largely rural with a low population density.
Martyn Underhill is a British independent politician and former police officer who served as the Dorset Police and Crime Commissioner from 2012 to 2021.
Surfing was first introduced in the United Kingdom in 1929 when four Australian teenagers brought the sport to Cribbar, Britain. Earlier recorded instance of surfing in the UK may have happened in Bridlington in the 19th Century.