Cedar Springs Wind Farm Complex | |
---|---|
![]() | |
Country | United States |
Location | Converse County, Wyoming |
Coordinates | Cedar Springs I: 43°04′45″N105°27′02″W / 43.07917°N 105.45056°W Cedar Springs II: 42°57′02″N105°21′15″W / 42.95056°N 105.35417°W Contents
|
Status | Operational |
Construction began | 2020 |
Commission date | 2020 |
Owners | Blattner Energy, PacifiCorp |
Operator | Blattner Energy |
Wind farm | |
Type | Onshore |
Hub height |
|
Rotor diameter |
|
Power generation | |
Nameplate capacity | 531.56 MW
|
'Cedar Springs Wind Farm Complex is a 531.56-megawatt onshore wind farm located in Converse County, Wyoming, United States. The $600 million project consists of three phases with a total of 192 turbines and became operational in 2020. [1]
[Previous sections remain the same until Economic Impact]
The construction of the wind farm created approximately 400 jobs during development, including 40 positions filled by displaced oil and gas workers. The project is expected to provide over $100 million in tax revenue over its lifetime, funding local schools and public services. The wind farm generates enough energy to power approximately 120,000 homes annually. [1] [2]
The complex consists of three phases: [3]
The wind farm employs two types of GE turbines across its three phases:
Cedar Springs I & II:
Cedar Springs III:
The wind farm is located approximately 50 miles northeast of Casper and about 30 miles northwest of Douglas. [3]
The three phases are located in Converse County:
The project was developed by Cedar Springs Transmission and Orion Wind Resources, with Blattner Energy handling construction. All three phases were completed in 2020. [4] Construction began in spring 2020, with turbine installation starting in May. The project employed both local contractors and materials where possible, contributing to the local economy through accommodation, fuel, and other local services. The construction was completed on schedule by December 2020, transitioning to a permanent staff of 20 full-time employees. [1]
The power generated from Cedar Springs I is sold to PacifiCorp under a power purchase agreement for 200 MW, starting in 2020.
The construction of the wind farm created hundreds of jobs and is projected to provide millions in tax revenue over its operational lifespan. It generates enough energy to power approximately 120,000 homes annually. [2]
On August 5, 2024, an accident occurred at the Cedar Springs wind energy construction site. A crane toppled, resulting in the death of a 55-year-old crane operator, John William Hoffpauir, Jr., of Louisiana. The incident is under investigation by Wyoming OSHA. [5]
The San Gorgonio Pass wind farm is a wind farm that stretches from the eastern slope of the San Gorgonio Pass, near Cabazon, to North Palm Springs, on the western end of the Coachella Valley, in Riverside County, California. Flanked by Mount San Gorgonio and the Transverse Ranges to the North, and Mount San Jacinto and the Peninsular Ranges to the South, the San Gorgonio Pass is a transitional zone from a Mediterranean climate west of the pass, to a Desert climate east of the pass. This makes the pass area one of the most consistently windy places in the United States.
The Fenton Wind Farm is a 205.5 megawatt wind energy project built by enXco, that became operational in the second half of 2007. The $385-million project is near Chandler, Minnesota, United States, on a site that encompasses Murray and Nobles counties and consists of 137 GE 1.5 MW wind turbines.
The Cedar Creek Wind Farm is a 551.3 megawatt (MW) wind farm located about 8 miles east of the town of Grover in north-central Weld County, Colorado. It consists of 397 wind turbines and was constructed in two phases, Cedar Creek I and Cedar Creek II, becoming fully operational in 2010. The electricity is sold to the Public Service Company of Colorado.
The Smoky Hills Wind Farm is a 250 megawatt (MW) wind farm in Lincoln and Ellsworth Counties, 140 miles west of Topeka in Kansas, north of Ellsworth. The farm is operated by Enel Green Power. Highway K-14 and Interstate 70 pass through parts of the wind farm, with clear views of many of the wind turbines. The project uses 56 Vestas V80 1.8 MW wind turbines and produces enough electricity to power some 37,000 average Kansas homes annually. As of 19 November 2008, phase II is under construction with 99 GE 1.5 MW wind turbines for an additional 148.5 MW, to bring the total nameplate capacity to 249.3 MW. Phase II was completed and began commercial operation in December 2008.
The Fowler Ridge Wind Farm is a wind farm in Benton County, Indiana, near the city of Fowler, IN about 30 miles (48 km) northwest of Lafayette and 90 miles (140 km) northwest of Indianapolis. Fowler Ridge was originally developed in 2005 and 2006 by Orion Energy, LLC and Vision Energy, LLC and later sold in 2007 to BP and Dominion Resources. The project was constructed beginning in 2008 in two phases and has a nameplate capacity of 600 MW.
The Fântânele-Cogealac Wind Farm is the largest onshore wind farm in Romania and in Europe, with installed nameplate capacity of 600 MW from 240 General Electric 2.5xl wind turbines. The wind farm has been built for the Czhech ČEZ Group.
There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.
The Milford Wind Corridor Project, also called Milford Wind, is a 306 megawatt (MW) wind farm spanning Beaver and Millard County north of Milford, Utah. It became the state's largest wind facility when the first phase was completed in 2009. The electricity is being sold to the Southern California Public Power Authority.
Wyoming has one of the highest wind power potentials of any state in the United States. In 2019, Wyoming had wind powered electricity generating capacity of 1,589 MW, which produced 9.85% of its electric generation, with an additional 3,753 MW under construction. However, the wind generation in that year was Wyoming's third-lowest in the 2010s. By 2020, wind capacity increased to 2738 MW and 8448 gigawatt-hours of electricity were produced from wind in 2021, more than double 2019 production. Additional wind capacity and needed transmission lines are under construction or planned, despite political headwinds from Wyoming's strong coal and oil sectors.
The Leaning Juniper Wind Project is an electricity generating wind farm facility located in Gilliam County, Oregon, United States with a total generating capacity of 301.5 megawatts. It is owned by PacifiCorp and began operations in 2006. Leaning Juniper I became operational in September 2006 with 67 1.5 MW wind turbines with a capacity of 100.5 megawatts. "Leaning Juniper II includes 133 GE 1.5 MW wind turbines with a capacity of 201 MW. This phase came online in 2011." The Jones Canyon Substation was built as part of this project and to support other wind projects in the area.
Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.
In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.
The US state of Colorado has vast wind energy resources and the installed electricity capacity and generation from wind power in Colorado has been growing significantly in recent years. The growth has been sustained due to a combination of falling costs, continuing federal incentives, and the state's aggressive renewable portfolio standard that requires 30% of the state's electricity to come from renewable sources by 2020.
Starting in 1975, NASA managed a program for the United States Department of Energy and the United States Department of Interior to develop utility-scale wind turbines for electric power, in response to the increase in oil prices. A number of the world's largest wind turbines were developed and tested under this pioneering program. The program was an attempt to leap well beyond the then-current state of the art of wind turbine generators, and developed a number of technologies later adopted by the wind turbine industry. The development of the commercial industry however was delayed by a significant decrease in competing energy prices during the 1980s.
The Rolling Hills Wind Farm may be one of two wind farms, one in Wyoming, the other in Iowa.
Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2024, a total of 8.1 GW generating capacity is expected to be installed on Dogger Bank.
The Enterprise Solar Farm is an 80 MWAC (105 MWp) photovoltaic power station located about 25 miles west of Cedar City, Utah in Iron County. The project was developed by SunEdison, built by Mortenson Construction, and commissioned in September 2016. The electricity is being sold under a 20-year power purchase agreement to Rocky Mountain Power which serves customers in Utah, Idaho, and Wyoming.
Empire Wind is a proposed utility-scale offshore wind farm on the Outer Continental Shelf Offshore New York. It will be located in Bureau of Ocean Energy Management (BOEM) lease area OCS-A 0512 in the New York Bight about 15 miles (24 km) south of Jones Beach, Long Island.
TB Flats I & II Wind Farm is a 301.1-megawatt onshore wind farm located in Carbon County and Albany County, Wyoming, United States. The project was developed by Invenergy and later transferred to PacifiCorp as part of their Energy Vision 2020 initiative. It comprises 132 turbines manufactured by Vestas, specifically the V110-2.0 MW and V136-4.3 MW models.