Chandranigahpur Solar Project | |
---|---|
Country | Nepal |
Location | Chandranigahapur , Rautahat District |
Coordinates | 27°07′12″N85°22′17″E / 27.12000°N 85.37139°E |
Status | Operational |
Construction began | 2020 |
Commission date | 2021 |
Owner(s) | Api Power Company Pvt. Ltd |
Solar farm | |
Type | |
Feed-in tariff | NPR 7.5 [1] |
Chandranigahpur Solar Project is a 4 MW solar station located at Rautahat District, Province No. 2; Nepal. The plant is owned and run by Api Power Company Pvt. Ltd., an IPP. The plant came in operation in February 2021. [2]
Fiscal Year | 2078/079 [3] | 2079/080 [4] |
---|---|---|
०४ श्रावण | - | 502890 |
०५ भाद्र | 514630 | 525550 |
०६ असोज | 533820 | 546470 |
०७ कार्तिक | 532780 | 523610 |
०८ मंसिर | 467790 | 412470 |
०९ पुस | 366110 | 281590 |
१० माघ | 375030 | 351290 |
११ फागुन | 624160 | 446100 |
१२ चैत | 566160 | 605580 |
०१ बैशाख | 624160 | 531710 |
०२ जेठ | 591720 | 655400 |
०३ असार | 570100 | 462370 |
Total | 5,766,460 | 5342140 |
Nepal Doorsanchar Company Ltd., popularly known as Nepal Telecom or NTC, is a state-owned telecommunications service provider in Nepal with 91.49% of the government share. The company was a monopoly until 2003, when the first private sector operator, United Telecom Limited (UTL), started providing basic telephony services. The central office of Nepal Telecom is located at Bhadrakali Plaza, Kathmandu. It has branches, exchanges and other offices in 184 locations within the country.
Grønland is a rapid transit station on the Oslo Metro in the Common Tunnel serving all six lines. It is located in the business and residential area Grønland, between the stations Jernbanetorget to the west and Tøyen to the east. The station was opened on 22 May 1966 with the opening of the subway, and underwent refurbishments 1988–92. Peer Qvam was the original architect.
The following is a general comparison of BitTorrent clients, which are computer programs designed for peer-to-peer file sharing using the BitTorrent protocol.
Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.
The Darkhovin Nuclear Power Plant is a planned nuclear power plant located in Khuzestan province, Iran about 70 kilometers south of Ahvaz at the Karun river. Construction of one reactor has started. Some other projects on this site were cancelled. It's built by Masna.
Haryana Power Generation Corporation Limited (HPGCL) is the electricity generating company of the Government of Haryana in India. It has been entrusted with the responsibility of setting up of new generating stations in state of Haryana. HPGCL is an ISO: 9001, ISO:14001 and OHSAS:18001 Certified company. The certification was awarded by M/s British Standards Institution (BSI). Currently it has six power stations and projects situated at Panipat, Yamuna Nagar, Hissar & Jhajjar districts.
Renewable energy in Lithuania constitutes some energy produced in the country. In 2016, it constituted 27.9% of the country's overall electricity generation. Previously, the Lithuanian government aimed to generate 23% of total power from renewable resources by 2020, the goal was achieved in 2014 (23.9%).
The Kirazlık Dam is a gravity dam on the Botan River, 9 km (6 mi) east of Siirt in Siirt Province of southeastern Turkey. The purpose of the dam is to regulate the outflow of the Alkumru Dam upstream and to produce hydroelectric power with a run-of-the-river design. The dam was completed in late 2011 and the power station become operational in 2013. The power plant houses three 15 MW Kaplan turbine-generators.
Wind power in Idaho could generate more energy than the state uses.
The Güllübağ Dam is a gravity dam near the town of Güllübağ on the Çoruh River in Erzurum Province, Turkey. The primary purpose of the dam is hydroelectric power production. Construction on the river diversion tunnel began in 2009 and the dam was complete in 2012. That same year the first generator became operational and the final generator was operational in March 2013. Water from the dam is sent down downstream through a 3,200 m (10,500 ft) long penstock where it reaches an 84 MW power station. The dam is part of the Çoruh Development Plan and it is owned by Turkey's State Hydraulic Works.
Ministry of Physical Infrastructure and Transport is the governmental body of Nepal mainly responsible for domestic transport and rail transport as well as waterways.
Renewable energy in Thailand is a developing sector that addresses the country’s present high rate of carbon emissions. Several policies, such as the Thirteenth Plan or the Alternative Energy Development Plan, set future goals for increasing the capacity of renewable energy and reduce the reliance of nonrenewable energy. The major sources of renewable energy in Thailand are hydro power, solar power, wind power, and biomass, with biomass currently accounting for the majority of production. Thailand’s growth is hoped to lead to renewable energy cost reduction and increased investment.
George Thengummoottil is an Indian filmmaker and editor. He has also DIT for the 2022 Academy award winning documentary The Elephant Whisperers. His films have been nominated for several film festivals like International Documentary and short-film festival of Kerala and CMS Vatavaran film festival.
The CIAL Solar Power Project is a 40 megawatt (MW) photovoltaic power station built at Cochin International Airport, India, by the company Cochin International Airport Limited (CIAL). Cochin International Airport became the first fully solar powered airport in the world with the commissioning the plant.
Mithila Solar PV Station is a 10 MW solar station located at Dhanusha District, Province No. 2; Nepal. The plant is owned and run by Eco Power Development Pvt. Ltd., an IPP. The plant came in operation in February 2021.
{{cite web}}
: Missing or empty |url=
(help){{cite web}}
: Missing or empty |url=
(help)