Combined Construction and Operating License

Last updated

The Combined Construction and Operating License (Regulatory Guide 1.206, COL) replaced the previous Draft Regulatory Guide 1145 as the licensing process for new nuclear power plants in the United States. It is a part of a newer "streamlined" process that encourages standard plant designs, and prevents delays in operation that contributed to the mothballing of many plants since the 1980s. "A combined license authorizes construction and conditional operation of a nuclear power plant. The application for a combined license must contain essentially the same information required in an application for an operating license issued under 10 CFR Part 50, including financial and antitrust information and an assessment of the need for power. The application must also describe the inspections, tests, analyses, and acceptance criteria (ITAAC) that are necessary to ensure that the plant has been properly constructed and will operate safely." [1]

Contents

Previously, the licensing process had two steps, a construction permit and an operating license, each of which required a different application to be filed and reviewed. Oppositions raised before a plant started operation versus before it started construction could thus be extremely financially damaging to a utility.

A COL may reference an Early Site Permit (ESP), a standard Design Certification (DC), both, or neither. An ESP addresses the site that plant will be built on while a DC describes the reactor design. A COL application must address the information contained in an ESP or a DC if it does not reference them.

Seven COLs have been issued [2] and one application is currently under active review. [3] Five ESPs have been granted and one application is currently under active review. [4] Six Design Certification have been granted, one is under renewal review, and three applications are under active review. [5]

See also

Related Research Articles

Shearon Harris Nuclear Power Plant

The Shearon Harris Nuclear Power Plant is a nuclear power plant with a single Westinghouse designed pressurized-water nuclear reactor operated by Duke Energy. It was named in honor of W. Shearon Harris, former president of Carolina Power & Light. Located in New Hill, North Carolina, in the United States, about 20 miles (30 km) southwest of Raleigh, it generates 900 MWe, has a 523-foot (160 m) natural draft cooling tower, and uses Harris Lake for cooling. The reactor achieved criticality in January 1987 and began providing power commercially on May 2 of that year.

Callaway Nuclear Generating Station Nuclear power plant located in Callaway County, Missouri

The Callaway Plant is a nuclear power plant located on a 2,767 acres (1,120 ha) site in Callaway County, Missouri, near Fulton, Missouri. It began operating on December 19, 1984. The plant, which is the state's only commercial nuclear unit, has one 1,190-megawatt Westinghouse four-loop pressurized water reactor and a General Electric turbine-generator. It is owned by the Ameren Corporation and operated by subsidiary Ameren Missouri.

Turkey Point Nuclear Generating Station

Turkey Point Nuclear Generating Station is a nuclear and gas-fired power plant located on a 3,300-acre (1,300 ha) site two miles east of Homestead, Florida, United States, next to Biscayne National Park located about 25 miles (40 km) south of Miami, Florida near the southernmost edge of Miami-Dade County. The facility is owned by Florida Power & Light.

H. B. Robinson Nuclear Generating Station

The H. B. Robinson Steam Electric Plant, also known as Robinson Nuclear Plant, is a nuclear power plant located near Hartsville, South Carolina. The plant consists of one Westinghouse 759 MW pressurized water reactor. The site once included a coal-fired unit that generated 174 MW and a combustion turbine unit that generated 15 MW.

North Anna Nuclear Generating Station

The North Anna Nuclear Generating Station is a nuclear power plant on a 1,075-acre (435 ha) site in Louisa County, Virginia, in the Mid-Atlantic United States. The site is operated by Dominion Generation company and is jointly owned by the Dominion Virginia Power corporation (88.4%) and by the Old Dominion Electric Cooperative (11.6%).

Vogtle Electric Generating Plant Nuclear power plant in Burke County, Georgia, US

The Alvin W. Vogtle Electric Generating Plant, also known as Plant Vogtle, is a two-unit nuclear power plant located in Burke County, near Waynesboro, Georgia, in the southeastern United States. It is named after a former Alabama Power and Southern Company board chairman, Alvin Vogtle.

Nine Mile Point Nuclear Generating Station

Nine Mile Point Nuclear Station is a nuclear power plant with two nuclear reactors located in the town of Scriba, approximately five miles northeast of Oswego, New York, on the shore of Lake Ontario. The 900-acre (360 ha) site is also occupied by the James A. FitzPatrick Nuclear Power Plant.

Virgil C. Summer Nuclear Generating Station

The Virgil C. Summer Nuclear Power Station occupies a site near Jenkinsville, South Carolina, in Fairfield County, South Carolina, approximately 20 miles (32 km) northwest of Columbia.

Grand Gulf Nuclear Station is a nuclear power station with one operational GE BWR reactor. It lies on a 2,100 acres (850 ha) site near Port Gibson, Mississippi. The site is wooded and contains two lakes. The plant has a 520-foot natural draft cooling tower.

South Texas Nuclear Generating Station

The South Texas Project Electric Generating Station, is a nuclear power station southwest of Bay City, Texas, United States. STP occupies a 12,200-acre (4,900 ha) site west of the Colorado River about 90 miles (140 km) southwest of Houston. It consists of two Westinghouse Pressurized Water Reactors and is cooled by a 7,000-acre (2,800 ha) reservoir, which eliminates the need for cooling towers.

Enrico Fermi Nuclear Generating Station

The Enrico Fermi Nuclear Generating Station is a nuclear power plant on the shore of Lake Erie near Monroe, in Frenchtown Charter Township, Michigan on approximately 1,000 acres (400 ha). All units of the plant are operated by the DTE Energy Electric Company and owned by parent company DTE Energy. It is approximately halfway between Detroit, Michigan, and Toledo, Ohio. It is also visible from parts of Amherstburg and Colchester, Ontario as well as on the shore of Lake Erie in Ottawa County, Ohio. Two units have been constructed on this site. The first unit's construction started on August 4, 1956 and reached initial criticality on August 23, 1963, and the second unit received its construction permit on September 26, 1972. It reached criticality on June 21, 1985 and was declared commercial on November 18, 1988. The plant is connected to two single-circuit 345 kV Transmission Lines and three 120 kV lines. They are operated and maintained by ITC Transmission.

AP1000 American nuclear reactor design

The AP1000 is a nuclear power plant designed and sold by Westinghouse Electric Company. The plant is a pressurized water reactor with improved use of passive nuclear safety and many design features intended to lower its capital cost and improve its economics.

Economic Simplified Boiling Water Reactor Nuclear reactor design

The Economic Simplified Boiling Water Reactor (ESBWR) is a passively safe generation III+ reactor design derived from its predecessor, the Simplified Boiling Water Reactor (SBWR) and from the Advanced Boiling Water Reactor (ABWR). All are designs by GE Hitachi Nuclear Energy (GEH), and are based on previous Boiling Water Reactor designs.

Susquehanna Steam Electric Station

The Susquehanna Steam Electric Station, a nuclear power station, is on the Susquehanna River in Salem Township, Luzerne County, Pennsylvania.

Next Generation Nuclear Plant

A Next Generation Nuclear Plant (NGNP) is a specific proposed generation IV very-high-temperature reactor (VHTR) that could be coupled to a neighboring hydrogen production facility. It could also produce electricity and supply process heat. Up to 30% of this heat could be used to produce hydrogen via high-temperature electrolysis significantly reducing the cost of the process. The envisioned reactor design is helium-cooled, using graphite-moderated thermal neutrons, and TRISO fueled.

The William States Lee III Nuclear Station was a planned two-unit nuclear power plant in Cherokee County, South Carolina. Duke Energy filed the Combined Construction and Operating License (COL) application for the plant on December 13, 2007 to the NRC. On December 19, 2016, the NRC issued two Combined Licenses authorizing Duke to build and operate two AP1000 reactors at the site.

The Levy County Nuclear Power Plant was a proposed nuclear power plant in Levy County, Florida. Progress Energy Florida originally estimated that the reactors would cost $5 billion and would commence operation in 2016. But it later became clear that the Levy County reactors would not have started operation until at least 2026, if ever. Since Progress filed its application for the new plant in 2008 demand for electricity has been growing very slowly, and natural gas prices are now extremely low. The utility now estimates that the reactors will cost between $17 billion and $22 billion, not counting financing charges and cost overruns. According to economist Mark Cooper, opposition to the project has mounted, threatening a rerun of the 1970s and 1980s, when the majority of nuclear construction plans were canceled or abandoned.

The Victoria County Station was a proposed nuclear power plant, in Victoria County, 13.3 miles south of Victoria, Texas. The plant, consisting of two 1535 MWe General-Electric-Hitachi economic simplified boiling water reactors was applied for by the Exelon Nuclear Texas Holdings, LLC on September 2, 2008. The project was canceled in August 2012.

The Bell Bend Nuclear Power Plant was a proposed nuclear power plant, which would have been built on the Bell Bend of the Susquehanna River in Luzerne County, Pennsylvania adjacent to the Susquehanna Steam Electric Station.

GE Hitachi Nuclear Energy American nuclear technology company

GE Hitachi Nuclear Energy (GEH) is a provider of advanced reactors and nuclear services. It is headquartered in Wilmington, North Carolina, United States. Established in June 2007, GEH is a nuclear alliance created by General Electric and Hitachi. In Japan, the alliance is Hitachi-GE Nuclear Energy. In November 2015, Jay Wileman was appointed CEO.

References

  1. NUREG/BR-0298 (July 2004). "Nuclear Power Plant Licensing Process" (PDF). NRC.gov. Retrieved 20 July 2017.
  2. "NRC: Combined License Holders for New Reactors". NRC.Gov. Retrieved 20 July 2017.
  3. "NRC: Combined License Applications for New Reactors". NRC.gov. Retrieved 20 July 2017.
  4. "Early Site Permit Applications for New Reactors". NRC.gov. Retrieved 20 July 2017.
  5. "Design Certification Applications for New Reactors". NRC.gov. Retrieved 20 July 2017.

Bibliography