Contracts for Difference (CfD) are the main market support mechanism for low carbon generation in the UK. The scheme replaced the Renewables Obligation which closed to new generation in March 2017. It is administered by the Low Carbon Contracts Company (LCCC), which is owned by the UK Government.
The scheme offers a fixed "Strike Price" to generators over a 15-year contract, which provides financial certainty, unlike the wholesale electricity market which can fluctuate significantly. With the contract for difference, if the market price for electricity drops below the Strike Price, LCCC pays the generator the shortfall, however if the market price rises, the generator must pay back the difference. The costs of the scheme are passed onto consumers via their electricity bills. [1]
The contracts are awarded using a reverse auction in annual "Allocation Rounds" (AR) where companies submit sealed bids for a project capacity and cost. Contracts are awarded to the lowest cost projects first, until a predefined budget or capacity cap is reached. The budget is split into different 'Pots' which different technologies can bid into, [2] although these have varied by auction.
Bids cannot be above a maximum "Administrative Strike Price" set before the auction. [3] To make comparison between years easier, all Strike Prices are quoted in 2012 prices, but projects are paid an inflation-adjusted amount linked to the Consumer Price Index (CPI). The projects also set out a delivery year, when the projects is expected to be commissioned, however this may slip for various reasons. [1]
In December 2010, the Government introduced plans to reform the electricity market. [4] The Electricity Market Reform (EMR) introduced both a capacity market to incentivise reliable generation and Contracts for Difference to provide revenue certainty to developers investing in low carbon and renewable energy, but at a lower cost that the Renewables Obligation. [5]
Prior to the first Allocation Round, there was a mechanism called Final Investment Decision Enabling for Renewables. [6] This awarded CfDs to five offshore wind projects, two biomass conversion projects, and one dedicated biomass with combined heat and power, with a total capacity of almost 4.5 GW. [6] [7]
Separately, the Government also awarded a CfD to Hinkley Point C nuclear power station, set at £92.50/MWh for a 35 year period. [8] This is 20 years longer than other CfD contracts. See §Cost to consumers of the Hinkley Point C article for further discussion on the costs.
Results of the first two auctions were announced in February 2015 and September 2017. Since AR3 in 2019, subsequent auctions have been on an annual basis, .
The first Allocation Round auction started in October 2014, with results announced on 19 February 2015. [9] The maximum prices are given in the first table below. A total of 2.1 GW of contracts were awarded, primarily for two offshore wind projects, the 714 MW East Anglia 1 and the 448 MW Neart Na Gaoithe, plus 15 smaller onshore wind projects. [10]
Pot/Technology | 2014/15 | 2015/16 | 2016/17 | 2017/18 | 2018/19 |
---|---|---|---|---|---|
Pot 1 (established) | |||||
Onshore Wind (>5 MW) | 95 | 95 | 95 | 90 | 90 |
Solar photovoltaic (>5 MW) | 120 | 120 | 115 | 110 | 100 |
Energy from Waste (with CHP) | 80 | 80 | 80 | 80 | 80 |
Hydro (>5 MW and <50 MW) | 100 | 100 | 100 | 100 | 100 |
Landfill gas | 55 | 55 | 55 | 55 | 55 |
Sewage gas | 75 | 75 | 75 | 75 | 75 |
Pot 2 (less established) | |||||
Offshore wind | 155 | 155 | 1560 | 140 | 140 |
Tidal stream | 305 | 305 | 305 | 305 | 305 |
Wave | 305 | 305 | 305 | 305 | 305 |
Advanced Conversion Technologies (with or without CHP) | 155 | 155 | 150 | 140 | 140 |
Anaerobic digestion (with or without CHP) (>5 MW) | 150 | 150 | 150 | 140 | 140 |
Dedicated biomass (with CHP) | 125 | 125 | 125 | 125 | 125 |
Geothermal (with or without CHP) | 145 | 145 | 145 | 140 | 140 |
Pot 3 | |||||
Biomass conversion | 105 | 105 | 105 | 105 | 105 |
Pot/Technology | Capacity (MW) | № of projects | Strike Price (£2012/MWh) | ||||||
---|---|---|---|---|---|---|---|---|---|
2015/16 | 2016/17 | 2017/18 | 2018/19 | 2015/16 | 2016/17 | 2017/18 | 2018/19 | ||
Pot 1 (established) | |||||||||
Onshore Wind (>5 MW) | — | 45 | 77.5 | 626.05 | 15 | — | 79.23 | 79.99 | 82.50 |
Solar photovoltaic (>5 MW) | 32.88 | 38.67 | — | — | 5 | 50.00 | 79.23 | — | — |
Energy from Waste (with CHP) | — | — | — | 94.75 | 2 | — | — | — | 80.00 |
Pot 2 (less established) | |||||||||
Offshore wind | — | — | 714 | 448 | 2 | — | — | 119.89 | 114.39 |
Advanced Conversion Technologies | — | — | 36 | 26 | 3 | — | — | 119.89 | 114.39 |
Total | 32.88 | 83.67 | 827.50 | 1194.80 | 27 | — | — | — | — |
The second round ran from April to September 2017. [11] As announced in the 2016 budget, no funding was allocated in Pot 1 for the more established technologies of onshore wind, solar PV, hydro, energy from waste with CHP, landfill gas, and sewage gas. Instead, a Pot 2 budget of £290m for less established technologies, of which offshore wind was expected to form the majority. [12] Nearly 3.2 GW of contracts were awarded for three offshore wind farms: Triton Knoll (860 MW), Hornsea Project 2 (1386 MW), and Moray Offshore Windfarm (East) (950 MW). Several smaller projects for advanced conversion technologies and dedicated biomass with CHP were also funded. [13]
Pot/Technology | ASP (£2012/MWh) | Capacity (MW) | № of projects | SP (£2012/MWh) | |||
---|---|---|---|---|---|---|---|
2021/22 | 2022/23 | 2021/22 | 2022/23 | 2021/22 | 2022/23 | ||
Pot 2 (less established) | |||||||
Offshore wind | 105 | 100 | 860 | 2336 | 3 | 74.75 | 57.50 |
ACT (standard or advanced; with or without CHP) | 125 | 115 | 56.31 | 8 | 6 | 74.75 | 40.00 |
Anaerobic digestion (with or without CHP; >5MW) | 140 | 135 | — | — | — | — | — |
Dedicated biomass (with CHP) | 115 | 115 | 85.64 | — | 2 | 74.75 | — |
Wave | 310 | 300 | — | — | — | — | — |
Tidal stream | 300 | 295 | — | — | — | — | — |
Total | — | — | 1001.95 | 2344 | 11 | — | — |
The auction process for AR3 took place between May and September 2021. Of the £265m annual budget, £200m was for offshore wind, £24m for floating offshore wind, and £10m for onshore wind, with the remaining £31m for other less established technologies including (onshore) remote island wind. [15] AR3 delivered record low prices for offshore wind, with contracts to deliver in 2023/24 came in at £39.650/MWh and those delivering in 2024/25 at £41.611/MWh. [16]
Pot/Technology | ASP (£2012/MWh) | Capacity (MW) | № of projects | SP (£2012/MWh) | |||
---|---|---|---|---|---|---|---|
2023/24 | 2024/25 | 2023/24 | 2024/25 | 2023/24 | 2024/25 | ||
Pot 2 (less established) | |||||||
Advanced Conversion Technologies | 113 | 111 | 27.5 | 6.1 | 2 | 39.65 | 41.611 |
Anaerobic digestion (>5 MW) | 122 | 121 | — | — | — | — | — |
Dedicated biomass with CHP | 121 | 121 | — | — | — | — | — |
Geothermal | 129 | 127 | — | — | — | — | — |
Offshore wind | 56 | 53 | 1212 | 2854 | 6 | 39.65 | 41.611 |
Remote island wind (>5 MW) | 82 | 82 | 225.72 | 49.5 | 4 | 39.65 | 41.611 |
Tidal stream | 225 | 217 | — | — | — | — | — |
Wave | 281 | 268 | — | — | — | — | — |
Total | — | — | 2865.22 | 2909.6 | 12 | — | — |
The auction for AR4 took place between December 2021 and July 2022, and re-introduced Pot 1 for established technologies. Of the total £285m budget, a £20m ringfence was set aside for tidal stream projects in Pot 2, [19] and for the first time four contracts totalling just over 40 MW were awarded CfDs, MeyGen, Magallanes Renovables, and two for Orbital Marine Power. [20] The first contract for a floating offshore wind turbine was also awarded, to Hexicon AB for their 32 MW TwinHub project. [21]
Pot/Technology | ASP (£2012/MWh) | Capacity (MW) | № of projects | SP (£2012/MWh) | ||||||
---|---|---|---|---|---|---|---|---|---|---|
All delivery years | 2023/24 | 2024/25 | 2025/26 | 2026/27 | 2023/24 | 2024/25 | 2025/26 | 2026/27 | ||
Pot 1 (established) | ||||||||||
Solar PV (>5 MW) | 47 | 251.38 | 1958.03 | — | — | 66 | 45.99 | 45.99 | — | — |
Onshore Wind (>5 MW) | 53 | — | 887.96 | — | — | 10 | — | 42.47 | — | — |
Energy from waste (with CHP) | 121 | — | 30 | — | — | 1 | — | 45.99 | — | — |
Pot 2 (less established) | ||||||||||
Tidal stream | 211 | — | — | 5.62 | 35.2 | 4 | — | — | 178.54 | 178.54 |
Floating offshore wind | 122 | — | — | — | 32 | 1 | — | — | — | 87.30 |
Remote Island Wind (RIW) | 62 | — | — | — | 597.6 | 6 | — | — | — | 46.39 |
Offshore Wind | 46 | — | — | — | 6994.34 | 5 | — | — | — | 37.35 |
Total | — | 251.38 | 2875.99 | 5.62 | 7659.14 | 93 | — | — | — | — |
The auction for AR5 took place between March and September 2023. The available budget was £170 million for Pot 1 (established technologies) and £35 million for Pot 2 (emerging technologies) including a minimum £10m ringfence for tidal stream. [23] Despite warnings from industry before the auction, there were no bids from offshore wind projects as the Administrative Strike Price was seen to be to low to cover the increases in supply chain and cost of capital. [24]
Pot/Technology | ASP (£2012/MWh) | Capacity (MW) | № of projects | SP (£2012/MWh) | ||
---|---|---|---|---|---|---|
All delivery years | 2025/26 | 2026/27 | 2027/28 | All delivery years | ||
Pot 1 (established) | ||||||
Energy from waste (with CHP) | 116 | — | — | — | — | — |
Hydro (>5MW and <50MW) | 89 | — | — | — | — | — |
Landfill gas | 62 | — | — | — | — | — |
Offshore wind | 44 | — | — | — | — | — |
Onshore wind (>5 MW) | 53 | 31.1 | 204.4 | 1245.24 | 24 | 52.29 |
Remote island wind (>5 MW)) | 53 | — | — | 223.6 | 1 | 52.29 |
Sewage gas | 148 | — | — | — | — | — |
Solar PV (>5 MW) | 47 | 393.96 | 150.74 | 1382.98 | 56 | 47.00 |
Pot 2 (less established) | ||||||
Advanced Conversion Technologies | 182 | — | — | — | — | — |
Anaerobic digestion (>5 MW) | 136 | — | — | — | — | — |
Dedicated biomass with CHP | 162 | — | — | — | — | — |
Floating offshore wind | 116 | — | — | — | — | — |
Geothermal | 119 | — | 7 | 5 | 3 | 119.00 |
Tidal stream | 202 | — | 4.5 | 48.54 | 11 | 198.00 |
Wave | 245 | — | — | — | — | — |
Total | — | 425.06 | 366.64 | 2905.36 | 95 | — |
The budget for AR6 was set at just over £1bn, split into three pots: [27] [28] Following the election, at the end of July, the budget for AR6 was increased by 50% to £1.555bn. [29] [30]
The Administrative Strike Prices were significantly increased from AR5. The Contracts for Difference Allocation 6 results were announced on 3 September 2024, with 131 projects being awarded contracts. [31] [32]
Pot/Technology | ASP (£2012/MWh) | Capacity (MW) | № of projects | SP (£2012/MWh) | ||
---|---|---|---|---|---|---|
All delivery years | 2026/27 | 2027/28 | 2018/29 | All delivery years | ||
Pot 1 (established) | ||||||
Energy from waste (with CHP) | 181 | — | — | — | — | — |
Hydro (>5MW and <50MW) | 102 | — | — | — | — | — |
Landfill gas | 69 | — | — | — | — | — |
Onshore wind (>5 MW) | 64 | 272.58 | 717.79 | — | 22 | 50.90 |
Remote island wind (>5 MW)) | 64 | — | — | — | — | — |
Sewage gas | 162 | — | — | — | — | — |
Solar PV (>5 MW) | 61 | 1091.54 | 2196.77 | — | 93 | 50.07 |
Pot 2 (less established) | ||||||
Advanced Conversion Technologies | 210 | — | — | — | — | — |
Anaerobic digestion (>5 MW) | 144 | — | — | — | — | — |
Dedicated biomass with CHP | 179 | — | — | — | — | — |
Floating offshore wind | 176 | — | — | 400 | 1 | 139.93 |
Geothermal | 157 | — | — | — | — | — |
Tidal stream | 261 | — | 10 | 18 | 6 | 172.00 |
Wave | 257 | — | — | — | — | — |
Pot 3' | ||||||
Offshore wind | 73 | — | — | 3363.07 | 2 | 58.87 |
Offshore wind permitted reduction* | n/a | — | 1578.51 | — | 7 | 54.23 |
Total | — | 1364.12 | 4503.07 | 3781.07 | 131 | — |
* offshore wind permitted reduction refers to projects that had a previously secured CfD, but have now been awarded a CfD at a higher price. The original contract allowed for up to 25% of the capacity to be withdrawn. [32]
Round | Nuclear | Solar PV | Onshore wind | Remote island wind | Offshore wind | Floating offshore wind | Tidal Stream | Biomass conversion | Dedicated biomass with CHP | Energy from waste with CHP | Advanced Conversion Technology | Geothermal | Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Pre-AR1 | 3277 | — | — | n/a | 3101 | — | — | 1052 | 299 | — | — | — | 7729 |
AR1 | n/a | 72 | 749 | n/a | 1162 | — | — | n/a | — | 95 | 62 | — | 2140 |
AR2 | n/a | n/a | n/a | n/a | 3196 | — | — | n/a | 86 | — | 64 | — | 3346 |
AR3 | n/a | — | — | 275 | 5466 | — | — | n/a | — | — | 34 | — | 5775 |
AR4 | n/a | 2209 | 888 | 598 | 6994 | 32 | 41 | n/a | — | 30 | — | — | 10792 |
AR5 | n/a | 1928 | 1481 | 224 | — | — | 53 | n/a | — | — | — | 12 | 3698 |
AR6 | n/a | 3288 | 990 | — | 3363 | 400 | 28 | — | — | — | — | — | 9648 |
Total | 3277 | 7497 | 4108 | 1096 | 23282 | 432 | 122 | 1052 | 385 | 125 | 160 | 12 | 43127 |
The Renewables Obligation (RO) was designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. It was introduced in April 2002, both in England and Wales and in Scotland albeit in a slightly different form: the Renewables Obligation (Scotland). The RO was later introduced in Northern Ireland in April 2005. In all cases, replacing the Non-Fossil Fuel Obligation which operated from 1990.
In finance, a contract for difference (CFD) is a financial agreement between two parties, commonly referred to as the "buyer" and the "seller." The contract stipulates that the buyer will pay the seller the difference between the current value of an asset and its value at the time the contract was initiated. If the asset's price increases from the opening to the closing of the contract, the seller compensates the buyer for the increase, which constitutes the buyer's profit. Conversely, if the asset's price decreases, the buyer compensates the seller, resulting in a profit for the seller.
Energy in the United Kingdom came mostly from fossil fuels in 2021. Total energy consumption in the United Kingdom was 142.0 million tonnes of oil equivalent in 2019. In 2014, the UK had an energy consumption per capita of 2.78 tonnes of oil equivalent compared to a world average of 1.92 tonnes of oil equivalent. Demand for electricity in 2023 was 29.6 GW on average, supplied through 235 TWh of UK-based generation and 24 TWh of energy imports.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.
Wind power generation capacity in India has significantly increased in recent years. As of 31 March 2024, the total installed wind power capacity was 45.887 gigawatts (GW). India has the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the southern, western, and northwestern states. The onshore wind power potential of India was assessed at 132 GW with minimum 32% CUF at 120 m above the local ground level (agl). Whereas, the estimated potential at minimum 25% CUF is 695 GW at 120 agl.
Solar power has a small but growing role in electricity production in the United Kingdom.
Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.
In 2021 France reached a total of 18,676 megawatts (MW) installed wind power capacity placing France at that time as the world's seventh largest wind power nation by installed capacity, behind the United Kingdom and Brazil and ahead of Canada and Italy. According to the IEA the yearly wind production was 20.2 TWh in 2015, representing almost 23% of the 88.4 TWh from renewable sources in France during that year. Wind provided 4.3% of the country's electricity demand in 2015.
Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.
EDF Renewables is a wholly owned subsidiary of the French utility EDF Group, specializing in renewable energy production. As an integrated operator, the Group develops and finances the construction of renewable energy facilities, and manages operations and maintenance for its own account and for third parties.
The U.S. state of Massachusetts has vast wind energy resources offshore, as well as significant resources onshore. The 2016 update to the states's Clean Energy and Climate Plan had a goal of reducing 1990 baseline greenhouse gas emissions levels by 25% by 2020. Current goals include installing 3,500 megawatts (MW) of offshore wind power in the state by 2035. However, as of Q4 2021 the state had only 120 MW of wind powered electricity generating capacity, responsible for generating 0.9% of in-state electricity production. The state has awarded contracts to two offshore projects, the 800 MW Vineyard Wind project and 804 MW Mayflower Wind project. Construction began on the Vineyard Wind 1 project on November 18, 2021, after a long fight for approval. Commonwealth Wind was selected for development in 2021, but the developer has attempted to cancel the project due to increased costs. There are eight projects planned for off the southern coast of Massachusetts, though some will deliver power to Rhode Island, Connecticut, and New York.
Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2024, a total of 8.1 GW generating capacity is expected to be installed on Dogger Bank.
Hornsea Wind Farm is a Round 3 wind farm which began construction in 2018. Sited in the North Sea 120 km (75 mi) off the east coast of England, the eventual wind farm group is planned to have a total capacity of up to 6 gigawatt (GW).
MeyGen is a tidal stream energy plant in the north of Scotland. The project is located in the Pentland Firth, specifically the Inner Sound between the Island of Stroma and the Scottish mainland.
Orbital Marine Power is a Scottish renewable energy company focused on the development and global deployment of its pioneering floating turbine technology. The O2 is Orbital's first commercial turbine and represents the culmination of more than 15 years of world leading product development in the UK. The 74 m long turbine is expected to operate in the waters off Orkney for the next 15–20 years with the capacity to meet the annual electricity demand of around 2,000 UK homes with clean, predictable power from the fast-flowing waters while offsetting approximately 2,200 tonnes of CO2 production per year. In a further ground-breaking element of the project, the O2 will provide power to the European Marine Energy Centre's onshore electrolyser to generate green hydrogen that will be used to demonstrate decarbonisation of wider energy requirements.
The United Kingdom became the world leader of offshore wind power generation in October 2008 when it overtook Denmark.
Morlais is a grid connected tidal stream energy project located in the Irish Sea just off the west coast of Holy Island, Anglesey, Wales. It is being developed by the social enterprise agency Menter Môn. The site has the potential for up to 240 MW of renewable energy to be harnessed from the tides, using a mixture of seabed mounted and floating tidal energy devices from different companies.