MeyGen | |
---|---|
Country | Scotland |
Coordinates | 58°39′30″N3°7′30″W / 58.65833°N 3.12500°W |
Status | Operational |
Construction began | 2014 |
Commission date | 2016 |
Owner | SAE |
Tidal power station | |
Type | |
Type of TSG |
|
Power generation | |
Units operational | 4 |
Nameplate capacity | 6 MW (4 × 1.5 MW) |
Annual net output | 10.2 GWh (2023) |
MeyGen (full name MeyGen tidal energy project) is a tidal stream energy plant in the north of Scotland. [1] The project is located in the Pentland Firth, specifically the Inner Sound between the Island of Stroma and the Scottish mainland.
It is currently being constructed in a phased manner. [2] The first phase of the project uses four 1.5 MW turbines with 18 m (59 ft) rotor diameter which were installed submerged on the seabed in winter 2016/17. [3] Meygen has been claimed to be the "world’s largest tidal stream power project". There are plans for up to 400 MW to be installed at the site. [4]
The project is owned and run by SAE Renewables (formerly called SIMEC Atlantis Energy, and prior to 2017 Atlantis Resources), although previously it was owned and run by Tidal Power Scotland Limited and Scottish Enterprise.
The high speed of currents in the area, reaching up to 5 m/s (11 mph), made the chosen site in the Pentland Firth well suited to this type of energy generation. [5]
In October 2010, the newly named "MeyGen" tidal project from the nearby Castle of Mey and "Gen" for generation was created by a consortium of Atlantis Resources Limited, Morgan Stanley and received operational lease from the Crown Estate to a 400 MW project for 25 years. [6] In 2011 Norwegian partners Statkraft pulled out of the project. [7]
A consent was granted in 2013, under Section 36 of the Electricity Act, to construct up to 61 two or three-bladed turbines with a total installed capacity of 86 MW. [8] This was subject to construction in a phased manner so that potential environmental impacts could be understood. Each turbine was limited to 16-20 m in rotor diameter, rated at 1.0-2.4 MW, and connected to the grid by 6.6 kV cable.
Marine Scotland granted the project a license in January 2014. This initially only lasted until the end of 2020, but was extended in July 2016 to cover the period until 1 January 2041 or 25 years after completion of phase 1a. [9]
Construction work on the project started in January 2015, building an access road towards the sea where the onshore power conversion building would be located. [10]
In November 2016 the first turbine (TTG1) was installed, and in December it was announced that it had begun full power operations. [11] TTG1 was supplied by Andritz Hydro Hammerfest, and was joined by three further AR1500 turbines developed by Atlantis Resources with design support from Lockheed Martin. All four turbines were installed by February 2017, with the marine works undertaken by James Fisher Marine Services (previously Mojo Maritime). [12] Phase 1 (formerly called Phase 1a) began operations in April 2018. [13]
Some elements of the project were constructed outwith the licensed area, however after statutory consultation Marine Scotland varied the license in September 2017 to extend the consented site area. It was considered there were no additional impacts and that asking for full removal may have had adverse impacts. [9]
Phase 1b was initially planned to add a further 4 MW comprising two AR2000 turbines, with another 73.5 MW in Phase 1c. [14] Phase 1b was then revised to installing four turbines, bringing the total to eight. This required the Section 36 consent to be varied, to allow the additional two turbines above the six permitted in Phase 1. However, this phase did not proceed. [8]
In July 2022, MeyGen plc was awarded a contract to supply 28 MW of electricity to the GB grid in the Contracts for difference (CfD) Allocation Round 4 (AR4), [15] which will be used to support the construction of Phase 2 which is now due to be commissioned in 2027
Four further contracts totalling 21.94 MW were awarded in the CfD AR5 auction in September 2023. [16] An application was then submitted to vary the license conditions, to permit a smaller number of larger turbines to be used. These would be up to 24 m in diameter, remove the limit on the rated power per turbine, and increase the maximum voltage of the underwater cables to 33 kV. [8]
As of January 2024 [update] , the plan is to install the next 28 MW of turbines as Phase 2 to be commissioned by 2027, and a further 22 MW as Phase 3 by 2028. [17] Phase 2 is planned to consist of a further 10 turbines. [8]
In September 2024, the MeyGen project was awarded a further 9 MW in the CfD AR6 auction, to be delivered in 2028/29. [18]
The site has the potential for a further 312 MW to be deployed beyond that, subject to expanding the consent. [19] This would amount to 398 MW in total.
By 2018 the four turbines had produced 8 GWh. [20] In 2019, they produced 13.8 GWh. [21] Total cumulative production was 51 GWh by March 2023. [22]
The project received £1.5 million Scottish Government grant from the Saltire Tidal Energy Challenge Fund in 2020, to develop a sub-sea hub to connect multiple turbines. [23]
Phase 1 of the project comprises four 1.5 MW turbines, three Andritz Hydro Hammerfest AH1000 MK1 and one Atlantis Resources AR1500 developed in conjunction with Lockheed Martin. [14] [17] These are all three-bladed horizontal-axis turbines with an 18 m rotor diameter, that reach the 1.5 MW rated power at a current speed of 3 m/s. They are mounted on three-legged gravity foundations that sit on the seabed, each weighing around 350 tonnes with six 200 tonne ballast blocks. [14]
The turbines in phase 1 are connected to the onshore power conversion centre at Ness of Quoys by an individual cable per turbine. These are laid on the seabed, with landfall by 550 m long horizontal directional drilled conduits, installed in July 2015. [24] The cables were installed by James Fisher Marine Services by November 2015, with a total length of 11 km. This used the DP vessel Siem Daya 1, and was completed over a 2½ day neap tide window. [25] The onshore power conversion equipment was supplied by ABB. [14]
The Pentland Firth is a strait which separates the Orkney Islands from Caithness in the north of Scotland. Despite the name, it is not a firth.
Tidal power or tidal energy is harnessed by converting energy from tides into useful forms of power, mainly electricity using various methods.
The Pelamis Wave Energy Converter was a technology that used the motion of ocean surface waves to create electricity. The machine was made up of connected sections which flex and bend as waves pass; it is this motion which is used to generate electricity.
The production of renewable energy in Scotland is a topic that came to the fore in technical, economic, and political terms during the opening years of the 21st century. The natural resource base for renewable energy is high by European, and even global standards, with the most important potential sources being wind, wave, and tide. Renewables generate almost all of Scotland's electricity, mostly from the country's wind power.
Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.
The European Marine Energy Centre (EMEC) Ltd. is a UKAS accredited test and research centre focused on wave and tidal power development, based in the Orkney Islands, UK. The centre provides developers with the opportunity to test full-scale grid-connected prototype devices in wave and tidal conditions, at pre-consented test sites. EMEC also has sites for testing smaller-scale prototypes in more sheltered conditions.
SeaGen was the world's first large scale commercial tidal stream generator. It was four times more powerful than any other tidal stream generator in the world at the time of installation. It was decommissioned by SIMEC Atlantis Energy Limited in summer 2019, having exported 11.6 GWh to the grid since 2008.
Marine Current Turbines Ltd (MCT), was a United Kingdom-based company that developed tidal stream generators, most notably the 1.2 MW SeaGen turbine. The company was bought by the German automation company, Siemens in 2012, who later sold the company to Atlantis Resources in 2015.
A tidal stream generator, often referred to as a tidal energy converter (TEC), is a machine that extracts energy from moving masses of water, in particular tides, although the term is often used in reference to machines designed to extract energy from the run of a river or tidal estuarine sites. Certain types of these machines function very much like underwater wind turbines and are thus often referred to as tidal turbines. They were first conceived in the 1970s during the oil crisis.
Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, England, in the Irish Sea. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW and it was the world's second largest offshore wind farm in 2018.
The Saltire Prize, named after the flag of Scotland, was a national award for advances in the commercial development of marine energy.
Wind power is a major industry in Taiwan. Taiwan has abundant wind resources however a lack of space on land means that most major developments are offshore.
SAE is a renewable energy company. It is incorporated in Singapore, but its operational headquarters are in Edinburgh, Scotland, United Kingdom. Initially, it was a developer of the tidal power turbines and projects, but after becoming a part of GFG Alliance it has expanded its business also to the waste-to-energy and hydropower.
Orbital Marine Power is a Scottish renewable energy company focused on the development and global deployment of its pioneering floating turbine technology. The O2 is Orbital's first commercial turbine and represents the culmination of more than 15 years of world leading product development in the UK. The 74 m long turbine is expected to operate in the waters off Orkney for the next 15–20 years with the capacity to meet the annual electricity demand of around 2,000 UK homes with clean, predictable power from the fast-flowing waters while offsetting approximately 2,200 tonnes of CO2 production per year. In a further ground-breaking element of the project, the O2 will provide power to the European Marine Energy Centre's onshore electrolyser to generate green hydrogen that will be used to demonstrate decarbonisation of wider energy requirements.
In 2019, Wales generated 27% of its electricity consumption as renewable electricity, an increase from 19% in 2014. The Welsh Government set a target of 70% by 2030. In 2019, Wales was a net exporter of electricity. It produced 27.9 TWh of electricity while only consuming 14.7 TWh. The natural resource base for renewable energy is high by European standards, with the core sources being wind, wave, and tidal. Wales has a long history of renewable energy: in the 1880s, the first house in Wales with electric lighting powered from its own hydro-electric power station was in Plas Tan y Bwlch, Gwynedd. In 1963, the Ffestiniog Power Station was constructed, providing a large scale generation of hydroelectricity, and in November 1973, the Centre for Alternative Technology was opened in Machynlleth.
Nova Innovation Ltd is a Scottish developer of tidal stream turbines, based in Leith, Edinburgh. They deployed their first 30 kW turbine in 2014. Since then, they have developed and tested a 100 kW seabed mounded two-bladed horizontal-axis tidal stream turbine, and plan to scale this up in future. Up to six of these turbines have been deployed simultaneously in the Bluemull Sound, Shetland since 2016.
Many tidal stream generators have been developed over the years to harness the power of tidal currents flowing around coastlines. These are also called tidal stream turbines (TST), tidal energy converters (TEC), or marine hydro-kinetic (MHK) generation. These turbines operate on a similar principle to wind turbines, but are designed to work in a fluid approximately 800 times more dense than air which is moving at a slower velocity. Note that tidal barrages or lagoons operate on a different principle, generating power by impounding the rising and falling tide.
The Kincardine floating offshore wind farm is located off the east coast of Scotland, about 15 km (9 mi) south-east of Aberdeen. It has an installed capacity of nearly 50 MW, and when commissioned in 2021 it was the world's largest wind farm with floating turbines.