Cooke Dam | |
---|---|
Location | Oscoda Township, Iosco County, Michigan |
Coordinates | 44°28′22″N83°34′18″W / 44.472669°N 83.571677°W Coordinates: 44°28′22″N83°34′18″W / 44.472669°N 83.571677°W |
Construction began | 1911 |
Dam and spillways | |
Type of dam | Embankment dam |
Power Station | |
Installed capacity | 9 MW |
Cooke Hydroelectric Plant | |
Nearest city | Oscoda, Michigan |
Area | 4 acres (1.6 ha) |
Built | 1912 |
Architect | William Gilbert Fargo, James Berry Foote |
Architectural style | Classical Revival |
NRHP reference No. | 96000803 [1] |
Added to NRHP | August 2, 1996 |
Cooke Dam is a hydro-electric dam on the Au Sable River in Michigan. It was listed on the National Register of Historic Places in 1996 as the Cooke Hydroelectric Plant.
William Augustine Foote was an ambitious entrepreneur who established himself by developing a series of electric utility companies in Jackson, Battle Creek, Albion, and other cities in Michigan. In 1899, he introduced the concept of high-voltage transmission to Michigan, using a 22,000 volt line to send power from the Trowbridge Dam and Powerhouse to Kalamazoo, a distance of 22 miles. Foote soon became interested in using the steadily flowing Au Sable River to generate power, but was for a time unable to generate the financial backing necessary. However, Foote was involved in other electrical utility activities, including the establishment of the Croton Dam, where power was transmitted over a distance of 40 miles at 110,000 volts. In 1909, Foote consolidated his holdings and merged with other utilities to form Consumers Power Company. [2]
With the financial backing of Consumers Power, Foote returned to the Au Sable in 1909 and identified three sites on which to place hydroelectric dams. This site, the first to be developed, was suggested by banker Andrew Cooke, who helped secure financing for the project and became the dam's namesake. A large construction camp was established that same year for the workers on the dam. The river was diverted next, and by mid-1910 the dam foundation was in place. [2]
This dam began generating electricity in December 1911, with an original capacity of 9,000 kilowatts, [3] Transmission line ran 125 miles to Flint at a voltage of 140,000 volts, establishing a world record. Innovations included in the new project were three-legged, windmill-like towers that supported the transmission line and advances in insulator design. The Cooke plant was the first of six Au Sable River hydros completed over the next 12 years. [2]
The Cooke plant now generates power at a lower 46,000 volts. However, the plant, and its original generating equipment, is still in use. [2] Cooke Hydro is also part of the River Road Scenic Byway and listed in the National Scenic Byways Program. [4]
The Cooke Hydroelectric Plant consists of a series of structures located on the Au Sable River. The main dam is constructed with an embankment on each side connected by a spillway. Located near the spillway is the powerhouse and outdoor substation. Nearby are two separate structures: an attendant's house, and a storage shed. [2]
The two embankments form a V-shaped impediment across the river. The north embankment is a 572 feet long earthen dam, reinforced on the upstream side by a 12"-thick concrete wall. The south embankment is of similar construction but is only 90 feet long. The spillway is controlled by three steel Tainter gates, which are only opened to pass floodwaters. Normal river flow is directed through the powerhouse, which is situated adjacent to the spillway. [2]
The powerhouse is a red brick structure with a green tile roof measuring 116 feet by 67 feet. There are five windows in the main facade with flat arch brick window hoods. Personnel and cargo doors occupy the lower portion of one of the window openings. [2]
The interior of the powerhouse is largely open, and includes a basement and mezzanine. Most of the floorspace is occipied by generators and their governors. Generators in the powerhouse are connected to turbines in the adjacent penstock. [2]
At one corner of the powerhouse is the outdoor substation, where a small concrete pad supports transformers and other equipment, A chain link fence surrounds the substation. [2]
The attendant's house is a 2+1⁄2-story wood-frame building with a front gable. It was built around 1909 to provide onsite accommodations for plant operators, due to the isolated nature of the site at the turn of the century. Access to the plant at that time was either by an 18-mile wagon road or by a 160-mile, narrow gauge logging railroad. The house has a pedimented front porch and dormers and eave returns on the main gable which suggest a Classical Revival style. Round columns once supported the roof of the front porch, but have since been removed when the porch was enclosed. [2]
The storage shed is a single-story wood-frame structure sheathed in board-and-batten siding with double cargo doors on the main facade. The shed is likely a remnant of the original construction camp built to support the construction of the dam. [2]
Bonneville Lock and Dam consists of several run-of-the-river dam structures that together complete a span of the Columbia River between the U.S. states of Oregon and Washington at River Mile 146.1. The dam is located 40 miles (64 km) east of Portland, Oregon, in the Columbia River Gorge. The primary functions of Bonneville Lock and Dam are electrical power generation and river navigation. The dam was built and is managed by the United States Army Corps of Engineers. At the time of its construction in the 1930s it was the largest water impoundment project of its type in the nation, able to withstand flooding on an unprecedented scale. Electrical power generated at Bonneville is distributed by the Bonneville Power Administration. Bonneville Lock and Dam is named for Army Capt. Benjamin Bonneville, an early explorer credited with charting much of the Oregon Trail. The Bonneville Dam Historic District was designated a National Historic Landmark District in 1987.
The Bonneville Power Administration (BPA) is an American federal agency operating in the Pacific Northwest. BPA was created by an act of Congress in 1937 to market electric power from the Bonneville Dam located on the Columbia River and to construct facilities necessary to transmit that power. Congress has since designated Bonneville to be the marketing agent for power from all of the federally owned hydroelectric projects in the Pacific Northwest. Bonneville is one of four regional Federal power marketing agencies within the U.S. Department of Energy (DOE).
Garrison Dam is an earth-fill embankment dam on the Missouri River in central North Dakota, U.S.. Constructed by the U.S. Army Corps of Engineers from 1947 to 1953, at over 2 miles (3.2 km) in length, the dam is the fifth-largest earthen dam in the world. The reservoir impounded by the dam is Lake Sakakawea, which extends to Williston and the confluence with the Yellowstone River, near the Montana border.
Bagnell Dam impounds the Osage River in the U.S. state of Missouri, creating the Lake of the Ozarks. The dam is located in the city of Lakeside in Miller County, near the Camden-Miller County line. The 148-foot (45 m) tall concrete gravity dam was built by the Union Electric Company to generate hydroelectric power at its Osage Powerplant. It is 2,543 feet (775 m) long, including a 520-foot (160 m) long spillway and a 511-foot (156 m) long power station. The facility with eight generators has a maximum capacity of 215 megawatts. The dam provides power to 42,000 homes.
The Crotty Dam, also known during construction as the King Dam, or the King River Dam on initial approval, is a rockfill embankment dam with a controlled and uncontrolled spillway across the King River, between Mount Jukes and Mount Huxley, located in Western Tasmania, Australia.
Guthega Power Station is located in the Snowy Mountains region of New South Wales, Australia. The power station's purpose is for the generation of electricity. It is the first to be completed and smallest of the initial seven hydroelectric power stations that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Cochrane Dam is a minor earthfill embankment dam with concrete spillway across Georges Creek, located in the South Coast region of New South Wales, Australia. The main purpose of the dam is to supply water for hydro-power at the downstream Brown Mountain Power Station and for irrigation purposes. The impounded reservoir is called Cochrane Lake.
The Ames Hydroelectric Generating Plant, constructed in 1890 near Ophir, Colorado, was one of the first commercial system to produce and transmit alternating current (AC) electricity for industrial use and one of the first AC hydro-electric plants ever constructed. It became operational in 1891 and was built by Westinghouse Electric around two of their large alternators. One was set up in the valley as a generator and driven by water. It was connected by a 2.6-mile (4.2 km) transmission line to the second alternator used as a motor up at the Gold King Mine to drive the mining operation. The facility has been changed and upgraded over the years but is still in operation. It is now on the List of IEEE Milestones.
Croton Dam is an earth-filled embankment dam and powerplant complex on the Muskegon River in Croton Township, Newaygo County, Michigan. It was built in 1907 under the direction of William D. Fargo by the Grand Rapids - Muskegon Power Company, a predecessor of Consumers Energy. The 40-foot-high (12 m) dam impounds 7.2 billion U.S. gallons (6 billion imp. gal/27 billion L) of water in its 1,209-acre (489 ha) reservoir and is capable of producing 8,850 kilowatts at peak outflow. It was listed on the National Register of Historic Places in 1979.
The Caruachi Dam is a concrete gravity dam on the Caroní River in Bolivar state, Venezuela. The dam supports a hydroelectric power facility with a 2,160 megawatts (2,900,000 hp) capacity. The facility is located about 59 kilometres (37 mi) downstream from the Guri Dam belonging to the "Central Hidroeléctrica Simón Bolívar" and about 35 kilometres (22 mi) from where the Caroni and Orinoco rivers meet at Ciudad Guayana.
The Holt Lock and Dam is a lock built on the Black Warrior River near Holt, Alabama in Tuscaloosa County. Opening for navigation in 1966, it served as a replacement for a series locks and dams built in the early 20th century. The lock and dam impounds Holt Lake 19 miles (31 km) upstream to the John Hollis Bankhead Lock and Dam.
Hardy Dam is an earth-filled embankment dam and powerplant complex on the Muskegon River in Big Prairie Township, Newaygo County, Michigan. At the time of its completion, it was the largest earthen dam in North America east of the Mississippi. Its impoundment forms a lake with over 50 miles of shoreline. The dam impounds a reservoir with a surface area of 4,000 acres and its power plant has an installed capacity of 31.5 MW.
The Karapiro Power Station is a hydroelectric power station at Karapiro on the Waikato River, in the North Island of New Zealand. The power station lies on Lake Karapiro, a major rowing regatta venue. Karapiro is 30 kilometres (19 mi) south-east and upstream from the city of Hamilton and several kilometres from Cambridge. It is the last of the eight hydroelectric power stations on the Waikato River.
Atiamuri Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the third of eight hydroelectric power stations on the Waikato River. The station can easily be seen from State Highway 1 between Taupo and Tokoroa.
Arapuni Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is owned and operated by Mercury Energy, and is the seventh and penultimate hydroelectric power station on the Waikato River. It is also the oldest currently generating, the first government-built, and the largest capacity single hydroelectric power station on the Waikato River. The two power houses that make up the Maraetai Power Station have a larger combined capacity however.
Richard B. Russell Dam is a concrete-gravity and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Richard B. Russell Lake. The dam was built by the U.S. Army Corps of Engineers between 1974 and 1985 for the purposes of flood control, hydroelectricity, recreation, additional stream flow regulation, water supply, and fish and wildlife management. The concrete structure of the dam spans 1,904 feet (580 m) and rises 210 feet (64 m) above the riverbed, housing a hydro-power plant with an installed 600 megawatts (800,000 hp) capacity. The Richard B. Russell Dam is the final large dam completed by the U.S. Army Corps in the Savannah River Basin and lies 30 miles downstream from the Hartwell Dam (1962) and 37 miles (60 km) upstream from the J. Strom Thurmond Dam (1954).
The Yeywa Hydropower Station, located on the Myitnge River, 52 kilometres (32 mi) southeast of Mandalay city, at Yeywa village in Kyaukse Township, Mandalay Region in central Myanmar, is the country's first roller-compacted concrete (RCC) dam, and the site of a 790-megawatt (1,060,000 hp) hydroelectric power plant, the largest in the country.
Mechanicville Hydroelectric Plant is a 18.3-acre (7.4 ha) national historic district located at Mechanicville in Saratoga County, New York. The listing included one contributing building and three contributing structures. The district dates to 1897 and includes notable Queen Anne architecture.
Loud Dam is a hydro-electric dam on the Au Sable River in Michigan and is located along the National Register of Historic Places River Road Scenic Byway in Northern Michigan. Loud Dam is also part of the River Road Scenic Byway and listed in the National Scenic Byways Program.
Mio Dam is a hydro-electric dam located on the Au Sable River in Michigan capable of generating 4.96 MW of electric power. It was the 4th of 6 dams built by Consumers Power between 1906 and 1924 along the Au Sable River and is the furthest upstream of the six. The dam was completed in 1916. The Mio Hydroelectric Plant consists of an embankment on each side connected by a spillway. Located North of the spillway is the powerhouse and outdoor substation. Public access to Mio Pond is provided via a boat ramp maintained by Consumers Energy, and portage facilities are also provided allowing canoes and kayaks access to bypass the dam. Portage the dam on the right using the cement stairs then carry down a gravel road with a canoe slide on the down river side of the dam. The Mio Dam powerhouse continues to operate with the same turbines and generators that were installed over a century ago.