The Lake Blackshear Dam and Reservoir, constructed by the Crisp County Power Commission, serves approximately 23,000 people. The power-dam was the first in the United States to be owned, constructed and operated by a county. Blacksheardam.jpg
The Lake Blackshear Dam and Reservoir, constructed by the Crisp County Power Commission, serves approximately 23,000 people. The power-dam was the first in the United States to be owned, constructed and operated by a county.

In 1925, after an amendment was made to the Georgian constitution, the Crisp County Power Commission (CCPC) was established. The amendment was the result of a petition made by a group of residents from Crisp County to develop a hydroelectric power system along the Flint River. Georgia government officials decided to build a power-dam in order to satisfy the Crisp County resident's request. [1] The Crisp County Hydroelectric Power Dam, proposed by CCPC, was the first power-dam in the United States to be owned, built and operated by a county. [2]

Contents

History

Due to the suggestion made by several Crisp County citizens to build a hydroelectric power resource on the Flint River, the Crisp County Power Commission was established after an amendment to the Georgia State Constitution was completed. The Amendment of 1925 in the Georgia State Constitution stated that CCPC's primary purpose was to support "the agricultural, industrial and civic interests" of the inhabitants of Crisp County. The Georgia government decided that the Commission would be governed by a seven-member Board, comprising three County Commissioners and four members appointed by the Crisp County Grand Jury and has 300 staff to operate the Dam and Reservoir.

CCPC's first task was to issue $1.25 million in revenue bonds in order to finance the Lake Blackshear Dam and Reservoir. [1] The construction of the project was completed, and the power was first generated in August 1930. [3] Before the construction of the dam, like all rural areas of the South, residents of Crisp County did not have any type of electrical service. After the construction of the Lake Blackshear Dam and Reservoir, the Power Commissioners began supplying lines for county residents to receive the benefits of the newly generated electricity.

Electric Power

One of the most notable features of Crisp County is having the capability to provide reliable electric power. The community possesses one of the very few debt-free, county-owned hydroelectric generating plants in the country. The area of Cordele/Crisp County offers some of the most inexpensive electric power in the southeastern portion of the United States. [4] The demand for power surpassed the amount that was available over a period of time from the hydroelectric facility. In 1957, CCPC constructed one of the first combined-cycle facilities containing a 12.5 megawatt coal plant and a 5 megawatt natural gas combustion turbine. Yet more power was needed in 1975, and CCPC became one of the launching members of the Municipal Electric Authority of Georgia (MEAG). MEAG is a Joint Action Agency serving forty-nine public power units in Georgia and co-owns generating and transmission facilities with the other major wholesale suppliers in the state of Georgia. Being a member of MEAG affords Crisp County the ability to fund and construct any future generating or transmission facilities on a financial scale that may be required by Crisp County residents. Also, with MEAG's membership in Georgia's Integrated Transmission System (ITS), the county has access to power lines located throughout the state of Georgia for receipt or delivery of any needed level of power. [1]

Demographics

Serving an area of approximately 330 square miles (850 km2) including the Cordele and Arabi district, the Commission uses a network of around 850 miles (1,370 km) of circulation and transmission of power lines. CCPC also serves [ clarification needed ] approximately 12,000 meters with a peak load of 90MW. [1] The Lake Blackshear Dam and Reservoir, owned and generated by CCPC, has two earth dams, each standing at around 30 feet (9.1 m) high. The two dams on Lake Blackshear are referred to as the North and South dams. The North dam is 3,400 feet (1,000 m) long, and the smaller South dam is only 650 feet (200 m) long. [3]

Crisp County Power Commissioners

The current[ when? ] CCPC Board consists of four members appointed by the Crisp County Grand Jury and three County Commissioners. There are five total Commissioners; however, only three serve on the board at a time. The current[ when? ] members are:

Related Research Articles

<span class="mw-page-title-main">Lower Colorado River Authority</span> Public utility in Texas that manages the lower Colorado River

The Lower Colorado River Authority (LCRA) is a nonprofit public utility created in November 1934 by the Texas Legislature. LCRA's mission is to enhance the lives of the Texans it serves through water stewardship, energy and community service. LCRA provides public power, manages the lower Colorado River, builds and operates transmission lines, owns public parks, and offers community services.

<span class="mw-page-title-main">Cordele, Georgia</span> City in Georgia, United States

Cordele is a city in and the county seat of Crisp County, Georgia. The population was 11,165 at the 2010 census.

<span class="mw-page-title-main">Ludington Pumped Storage Power Plant</span> Dam in Ludington, Michigan

The Ludington Pumped Storage Plant is a hydroelectric plant and reservoir in Ludington, Michigan. It was built between 1969 and 1973 at a cost of $315 million and is owned jointly by Consumers Energy and DTE Energy and operated by Consumers Energy. At the time of its construction, it was the largest pumped storage hydroelectric facility in the world.

<span class="mw-page-title-main">Manitoba Hydro</span> Electric power and natural gas utility company in Manitoba, Canada

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.

The Chelan County Public Utility District, or Chelan County PUD, provides electric, water, wastewater public utility and telecommunications services in Chelan County, in north-central Washington, USA.

The Sacramento Municipal Utility District (SMUD) is a community-owned electric utility serving Sacramento County and parts of Placer County. It is one of the ten largest publicly owned utilities in the United States, generating the bulk of its power through natural gas and large hydroelectric generation plants. SMUD's green power (renewable) energy output was estimated as 33.8% in 2020.

The Upper Peninsula Power Company (UPPCO) is an electrical power utility provider headquartered in Marquette, Michigan with service centers in Escanaba, Houghton, Iron River, Ishpeming, Munising and Ontonagon.

The Shoalhaven Scheme is a dual-purpose water supply and Pumped-storage Hydroelectricity scheme located on the South Coast region of New South Wales, Australia.

<span class="mw-page-title-main">Lake Sinclair</span> Reservoir in Georgia, US

Lake Sinclair is a man-made lake in central Georgia near Eatonton. It is operated by Georgia Power.

<span class="mw-page-title-main">Nelson River Hydroelectric Project</span>

The Nelson River Hydroelectric Project refers to the construction of a series of dams and hydroelectric power plants on the Nelson River in Northern Manitoba, Canada. The project began to take shape in the late 1950s, with the planning and construction of the Kelsey dam and hydroelectric power station, and later was expanded to include the diversion of the upper Churchill River into the Nelson River and the transformation of Lake Winnipeg, the world's 11th largest freshwater lake, into a hydroelectric reservoir. The project is owned and operated by Manitoba Hydro, the electrical utility in the province.

The Tinker Dam is a hydroelectric dam built in Tinker on the Aroostook River in the Canadian province of New Brunswick, and operated jointly by WPS Energy and NB Power. Its power house has a capacity of 34 megawatts.

<span class="mw-page-title-main">Lake Blackshear</span> Reservoir in Georgia

Lake Blackshear is a man-made lake on the Flint River in Georgia created by a dam that was constructed from 1925 to 1930. The lake was named after General David Blackshear.

The Municipal Electric Authority of Georgia is an organization that provides electricity generation and power transmission to municipal electric utilities in the U.S. State of Georgia. MEAG is a nonprofit entity established in 1975, and 49 member communities distribute power produced by MEAG or procured on wholesale markets.

<span class="mw-page-title-main">Blue Ridge Dam</span> Dam in Georgia, United States

Blue Ridge Dam is a hydroelectric dam on the Toccoa River in Fannin County, in the U.S. state of Georgia. It is the uppermost of four dams on the Toccoa/Ocoee River owned and operated by the Tennessee Valley Authority. The dam impounds the 3,300-acre (1,300 ha) Blue Ridge Lake on the southwestern fringe of the Blue Ridge Mountains.

<span class="mw-page-title-main">North Fork Kings River</span> River in California, United States

The North Fork Kings River is a 40.3-mile (64.9 km) tributary of the Kings River, in the U.S. state of California. The river's main stem is entirely within Fresno County, and its watershed drains about 387 square miles (1,000 km2) of the southern Sierra Nevada mountain range.

<span class="mw-page-title-main">Pelton Dam</span> Dam on the Deschutes River in Jefferson County, Oregon, U.S.

Pelton Dam is a major dam on the Deschutes River in Jefferson County, Oregon, owned and operated as a hydroelectric facility by Portland General Electric, one element of its Pelton Round Butte Project on the Deschutes.

<span class="mw-page-title-main">Big Creek Hydroelectric Project</span> Hydroelectric Power Scheme on upper San Joaquin River System, Sierra Nevada, Central California

The Big Creek Hydroelectric Project is an extensive hydroelectric power scheme on the upper San Joaquin River system, in the Sierra Nevada of central California. The project is owned and operated by Southern California Edison (SCE). The use and reuse of the waters of the San Joaquin River, its South Fork, and the namesake of the project, Big Creek – over a vertical drop of 6,200 ft (1,900 m) – have over the years inspired a nickname, "The Hardest Working Water in the World".

<span class="mw-page-title-main">Terror Lake Hydroelectric Generating Station</span> Principal power plant for Kodiak Island, Alaska

The Terror Lake Hydroelectric Generating Station is the principal power plant for Kodiak Island, Alaska. The Hydroelectricity station consists of three Pelton runner vertical shaft turbine units rated 11 megawatts each at 1200 feet head. Two units were installed when the station was constructed in 1985, and the third unit rated 11.5 MW was installed in the fall of 2013. The station is owned and operated by the Kodiak Electric Association, Inc., an electrical cooperative owned by its customers. The station is located about 25 miles from the city of Kodiak and is accessible only by air or boat.

<span class="mw-page-title-main">Yuba–Bear Hydroelectric Project</span>

The Yuba–Bear Hydroelectric Project is a complex hydroelectric scheme in the northern Sierra Nevada in California, tapping the upper Yuba River and Bear River drainage basins. The project area encompasses approximately 400 square miles (1,000 km2) in Nevada, Placer, and Sierra Counties. Owned by the Nevada Irrigation District, it consists of 16 storage dams plus numerous diversion and regulating dams, and four generating stations producing 425 million kilowatt hours of electricity each year. The Yuba–Bear Hydroelectric Project consists of the Bowman development, Dutch Flat No. 2 development, Chicago Park development, and Rollins development.

<span class="mw-page-title-main">Jackson Hydroelectric Project</span>

The Henry M. Jackson Hydroelectric Project, or Jackson Hydro Project, is an electric power generating project on the Sultan River operated and maintained by the Snohomish County Public Utility District in Washington, co-licensed by the city of Everett, Washington. Beginning operations in 1984, the project aims to bring clean and renewable hydropower to Snohomish county. The facility consists of a single powerhouse, two main generating units, a switch-yard, and transmission lines—all of which are directly connected to the county's local 115 kV power-transmission network. The largest generating station operated by the Snohomish county PUD, the Jackson Hydro powerhouse has a total nameplate capacity of 112 megawatts, enough to power 53,200 homes, and accounts for 7 percent of the Snohomish county PUD's total power needs. The vast remainder of the Snohomish county PUD's power comes from the Chief Joseph Dam, located in eastern Washington, through long-term contracts with the Bonneville Power Administration.

References

  1. 1 2 3 4 5 "History". Archived from the original on 2012-07-11. Retrieved 2011-03-04.
  2. "New Georgia Encyclopedia: Crisp County". Archived from the original on 2011-07-14. Retrieved 2011-03-04.
  3. 1 2 hydro-usa-fl-ga
  4. Crisp IDC -Utilities Archived 2011-03-02 at the Wayback Machine