Founded | 1936 |
---|---|
Headquarters | |
Products | Electric utility |
Production output | 840 megawatts (rated, Wells Dam) |
The Douglas County Public Utility District, or Douglas County PUD, is a public co-operative energy district providing service to Douglas County, Washington. It is owned by its customers and governed by a Board of Commissioners elected by the customer-owners. Though it is not regulated by another governmental unit, a PUD is, by state statute, a nonprofit corporation. PUDs must comply with state regulations for municipal corporations. The local customer-owner of the PUD receives dividends in the form of reduced rates for service.
Although being organized in 1936, Douglas County Public Utility District did not begin operations until 1945, nearly 10 years later. After acquiring components of the existing electrical grid, Douglas County PUD began extending service into the more rural areas of the county. At that time, Douglas County PUD received electrical current from the Bonneville Power Administration.
In the 1950s and 1960s, Douglas County PUD began the necessary steps to build and license Wells Dam on the Columbia River. In 1967, Douglas County PUD began generating operations at Wells Dam. At the time, Douglas County PUD did not put that electricity into its own grid due to the high cost, instead sold it to four other utilities who financed the project by purchasing the power.
Today, Wells Dam generates most of the power used by Douglas County residents. The dam produces much more electricity than is used by consumers in Douglas County, which allows the PUD to sell excess power to other utility districts. As a result, Douglas County has some of the cheapest electricity rates in the country. [1]
Douglas County PUD also owns and operates a High Speed Fiber Optic Broadband Internet Network, called the Douglas County Community Network (DCCN), which allows customers in rural parts of the county to connect to Broadband Internet through several different local providers.
A public utility company is an organization that maintains the infrastructure for a public service. Public utilities are subject to forms of public control and regulation ranging from local community-based groups to statewide government monopolies.
Electric power distribution is the final stage in the delivery of electricity. Electricity is carried from the transmission system to individual consumers. Distribution substations connect to the transmission system and lower the transmission voltage to medium voltage ranging between 2 kV and 33 kV with the use of transformers. Primary distribution lines carry this medium voltage power to distribution transformers located near the customer's premises. Distribution transformers again lower the voltage to the utilization voltage used by lighting, industrial equipment and household appliances. Often several customers are supplied from one transformer through secondary distribution lines. Commercial and residential customers are connected to the secondary distribution lines through service drops. Customers demanding a much larger amount of power may be connected directly to the primary distribution level or the subtransmission level.
Portland General Electric (PGE) is a Fortune 1000 public utility based in Portland, Oregon. It distributes electricity to customers in parts of Multnomah, Clackamas, Marion, Yamhill, Washington, and Polk counties - 44% of the inhabitants of Oregon. Founded in 1888 as the Willamette Falls Electric Company, the company has been an independent company for most of its existence, though was briefly owned by the Houston-based Enron Corporation from 1997 until 2006 when Enron divested itself of PGE during its bankruptcy.
A utility cooperative is a type of cooperative that is tasked with the delivery of a public utility such as electricity, water or telecommunications to its members. Profits are either reinvested for infrastructure or distributed to members in the form of "patronage" or "capital credits", which are dividends paid on a member's investment in the cooperative.
Puget Sound Energy (PSE) is an energy utility company based in the U.S. state of Washington that provides electrical power and natural gas to the Puget Sound region. The utility serves electricity to more than 1.1 million customers in Island, King, Kitsap, Kittitas, Pierce, Skagit, Thurston, and Whatcom counties, and provides natural gas to 750,000 customers in King, Kittitas, Lewis, Pierce, Snohomish and Thurston counties. The company's electric and natural gas service area spans 6,000 square miles (16,000 km2).
Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario. In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.
The Chelan County Public Utility District, or Chelan County PUD, provides electric, water, wastewater public utility and telecommunications services in Chelan County, in north-central Washington, USA.
Saskatchewan Power Corporation, operating as SaskPower, is the principal electric utility in Saskatchewan, Canada. Established in 1929 by the provincial government, it serves more than 538,000 customers and manages over $11.8 billion in assets. SaskPower is a major employer in the province with over 3,100 permanent full-time staff located in approximately 70 communities.
The Upper Peninsula Power Company (UPPCO) is an electrical power utility provider headquartered in Marquette, Michigan with service centers in Escanaba, Houghton, Iron River, Ishpeming, Munising and Ontonagon.
Energy Northwest is a public power joint operating agency in the northwest United States, formed 66 years ago in 1957 by Washington state law to produce at-cost power for Northwest utilities. Headquartered in the Tri-Cities at Richland, Washington, the WPPSS became commonly known as "Whoops!", due to over-commitment to nuclear power in the 1970s which brought about financial collapse and the second largest municipal bond default in U.S. history. WPPSS was renamed Energy Northwest in November 1998, and agency membership includes 28 public power utilities, including 23 of the state's 29 public utility districts.
Public Utility District No. 2 of Grant County, or Grant County PUD, is a public utility district in north central Washington state. It is owned by its customers and governed by a Board of Commissioners elected by the customer-owners. Though it is not regulated by another governmental unit, a PUD is, by state statute, a nonprofit corporation. PUDs must comply with state regulations for municipal corporations. The local customer-owner of the PUD receives benefits in the form of reduced rates for service. Grant County PUD operates two hydroelectric projects, Priest Rapids Dam and Wanapum Dam. In addition to these, the PUD also operates the Quincy Chute Hydroelectric Project, Potholes East Canal Headworks Project and part of the Nine Canyon Wind Project.
The Snohomish County Public Utility District is a public utility agency providing power to over 367,000 customers in Snohomish County and on Camano Island, Washington. It provides water service to about 23,000 customers in the northeast section of the Snohomish County.
This is a list of Electricity distribution companies by country.
There is a large array of stakeholders that provide services through electricity generation, transmission, distribution and marketing for industrial, commercial, public and residential customers in the United States. It also includes many public institutions that regulate the sector. In 1996, there were 3,195 electric utilities in the United States, of which fewer than 1,000 were engaged in power generation. This leaves a large number of mostly smaller utilities engaged only in power distribution. There were also 65 power marketers. Of all utilities, 2,020 were publicly owned, 932 were rural electric cooperatives, and 243 were investor-owned utilities. The electricity transmission network is controlled by Independent System Operators or Regional Transmission Organizations, which are not-for-profit organizations that are obliged to provide indiscriminate access to various suppliers to promote competition.
EPB of Chattanooga, formerly known as the Electric Power Board of Chattanooga, is an American electric power distribution and telecommunications company owned by the city of Chattanooga, Tennessee. EPB serves nearly 180,000 homes and businesses in a 600-square mile area in the greater Chattanooga area and Hamilton County. In 2010, EPB was the first company in the United States to offer 1 Gbit/s high-speed internet over a fiber optic network, over 200 times faster than the national average. As a result, Chattanooga has been called "Gig City" and held up as a national model for deploying the world's fastest internet and the most advanced Smart Grid electric distribution system in the United States. On October 15, 2015, Chattanooga implemented the world's first community-wide 10-gig Internet service.
Vermont electric power needs are served by over twenty utilities. The largest is Green Mountain Power, a subsidiary of Énergir which recently also took over Central Vermont Public Service. Together this single company represents 70% of the retail customers in Vermont. The state is a small electricity consumer compared with other states. Therefore, its electricity sector has the lowest carbon footprint in the country. As of 2010, the state had the lowest wholesale electricity costs in New England. Efficiency Vermont engages in aggressive initiatives to cut residential electricity waste, which often identifies other problems that it claims can save hundreds per household per year. Accordingly, Vermont's overall energy bills are also relatively lower than in the rest of the New England states.
Public Utility District No. 1 of Clark County, doing business as Clark Public Utilities and commonly referred to as Clark PUD, is a public utility district in Clark County, Washington. Clark PUD provides electric service to all of Clark County except for the Georgia-Pacific Camas Paper Mill in the City of Camas, and its water service area covers the majority of the county, except the Cities of Battle Ground, Camas, Ridgefield, Washougal, and Vancouver, which have their own municipal water systems.
Electricity in the Puget Sound region is a significant factor in people's lives, an enabler for the modern economy, and has a unique relationship with the region's environment.
Northwest Open Access Network (NoaNet) is an open-access network in the United States Pacific Northwest region. NoaNet is a public-benefit wholesale telecommunications organization that supplies solutions and resources for all aspects of broadband and telecom projects to serve Washington State including wholesale wide-area and last-mile bandwidth on optic fiber and other means from pooled public utility district (PUD) assets, as well as over 30 colocation centers. It was formed c. 1999 and began operating in 2000 on Bonneville Power Administration-owned fiber. By 2015, it had over 3,000 miles (4,800 km) of fiber.