East Taunton station

Last updated

East Taunton
East Taunton station construction aerial view 03.jpg
East Taunton station under construction in 2024
General information
LocationIndustrial Drive off Route 140
Taunton, Massachusetts
Coordinates 41°52′05″N71°03′41″W / 41.86799°N 71.06148°W / 41.86799; -71.06148
Line(s) New Bedford Secondary
Platforms1 island platform (under construction)
Tracks3 (2 station tracks, 1 freight bypass)
ConnectionsAiga bus trans.svg GATRA: 8 [1]
Construction
AccessibleYes
History
Opening2024 (planned)
Passengers
2030420 daily boardings (projected) [1] :66
Planned services
Preceding station MBTA.svg MBTA Following station
Middleborough
Phase 1 (2023)
South Coast Rail Freetown
toward Fall River
Taunton
Phase 2 (2030)
Church Street
toward New Bedford
Location
East Taunton station

East Taunton station is an under-construction MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street (Route 140). It is planned to open in 2024 as part of the first phase of the South Coast Rail project.

Contents

A former East Taunton station, located to the east on a different line, was served by the New York, New Haven and Hartford Railroad and several predecessors until 1927. In 2009, South Coast Rail planning identified Taunton Depot, just north of Middleborough Junction (Cotley Junction), as a preferred station site. A 2017 re-evaluation of the project recommended an interim route through Middleborough, with East Taunton station located just south of the junction. A construction contract was issued in 2020.

Station design

The station will be located in the southeast portion of Taunton along the New Bedford Secondary, slightly northwest of the Route 24 expressway. The station driveway (an extension of the existing Industrial Drive) will be reached from County Street (Route 140) just north of the Route 24/Route 140 interchange. [1] East Taunton will have a single full-length high-level island platform, 800 feet (240 m) long and 26.5 feet (8.1 m) wide. It will serve the two passenger tracks, with a freight bypass track to the west. [1] Two footbridges – one with stairs, the other with ramps – will connect the platform to the 363-space parking lot, which includes a turnout for Greater Attleboro Taunton Regional Transit Authority (GATRA) buses. [1]

History

Former service

Cotley Junction in the early 20th century Middleborough Junction postcard.jpg
Cotley Junction in the early 20th century

The Taunton Branch Railroad was extended to New Bedford as the New Bedford and Taunton Railroad in 1840. [2] :398 The Middleborough and Taunton Railroad opened from Middleborough to Cotley Junction (Middleborough Junction) – south of Taunton on the New Bedford and Taunton Railroad – in 1856. [2] :398 No station was located at the junction, which was in a relatively unpopulated area. East Taunton station on the Middleborough and Taunton was located 2 miles (3.2 km) east at Old Colony Avenue in East Taunton village. [3] The Middleborough and Taunton was acquired by the Old Colony Railroad in 1874, followed by the former New Bedford and Taunton (after several ownership and name changes) in 1879. [2] :398 The Old Colony was in turn acquired by the New York, New Haven and Hartford Railroad in 1893. [2]

Local passenger service between Middleborough and Taunton was operated as ProvidencePlymouth or Taunton–Plymouth trains; it was discontinued in 1927 when service on the Darby Branch ended. [4] [5] [6] East Taunton station was closed; the line was used by New York–Cape Cod trains until 1964, and commuter rail service to New Bedford via Taunton lasted until 1958. [2] :399 Freight service continued on the Middleboro Secondary and New Bedford Subdivision; the state purchased the former line from Conrail in December 1982. [7]

South Coast Rail

Aerial view of construction in August 2021 East Taunton Station Site 8-23-21.jpg
Aerial view of construction in August 2021

In September 2008, MassDOT released 18 potential station sites for the South Coast Rail project, including two potential East Taunton sites: one just west of Route 24 if trains were routed through Middleborough, and one to the north off Route 140 if trains were routed through Stoughton or Attleboro. [8] The 2009 selection of the Stoughton route included Taunton Depot at the northern site. It was to have an island platform flanked by two passenger tracks, with a freight passing track on the western side. [9] Potential transit-oriented development included new multi-family housing to the north, and eventual redevelopment of a nearby shopping center. [10] Station plans released as part of the Final Environmental Impact Report in 2013 were nearly identical to those from 2009. [11] On June 11, 2010, the state took ownership of the New Bedford Subdivision and several other CSX lines as part of a sale agreement. [12]

In 2017, the project was re-evaluated due to cost issues. The new proposal called for early service via Middleborough by 2022, followed by full service via Stoughton by 2030. [13] The 2017 proposal attracted criticism from local officials across the route, including Taunton officials unhappy that the downtown Taunton station would be delayed until 2030. [14] The January 2018 Draft Supplemental Environmental Impact Report considered several service patterns: serving Taunton Depot and/or Taunton stations with a reverse move on some or all trains, or a new East Taunton station near the previously proposed southern site. The latter option was chosen for lower costs and shorter travel times. [1] :28

Two sites just south of Cotley Junction, and one site at Old Colony Avenue (the former East Taunton station location) were considered. The previously-considered southern site (a former sports complex on Industrial Drive at 1141 County Street) was chosen. The site is adjacent to the interchange between the Route 24 expressway and County Street (Route 140). [1] :41 As with the former Taunton Depot plans, the station will have a single island platform with two passenger tracks and a freight passing track. [1] :41

The sports complex was demolished in 2020 to make room for the station and its parking lot. [15] The MBTA awarded a $403.5 million contract for the Middleborough Secondary and New Bedford Secondary portions of the project, including East Taunton station, on August 24, 2020. Construction was expected to begin later in 2020 and take 37 months, with a late 2023 opening. [16] The contract was 18% complete by November 2021, with station construction underway, and 53% complete by August 2022. [17] [18] In December 2022, the city council approved a zoning change allowing transit oriented development near the station. [19] Opening was delayed to mid-2024 in September 2023; at that point, the station was 69% complete and expected to be finished in January 2024. [20] [21] Opening was further delayed in April 2024, with the complex construction of East Taunton station one of the reasons given for the delay. [22]

Related Research Articles

<span class="mw-page-title-main">Middleborough, Massachusetts</span> Town in Massachusetts, United States

Middleborough is a town in Plymouth County, Massachusetts, United States. The population was 24,245 at the 2020 census. The census-designated place of Middleborough Center corresponds to the main village and commercial center of the town. It is the second largest municipality by land area in Massachusetts and nineteenth largest in New England. Middleborough proclaims itself to be the "Cranberry Capital of the World". Cranberry production remains a significant part of the local economy. In 2015, approximately 1,400 acres of the town were used to grow the crop, accounting for 3% of all land used to harvest cranberry bogs in the United States.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Old Colony Railroad</span> Former railroad system in Massachusetts and Rhode Island

The Old Colony Railroad (OC) was a major railroad system, mainly covering southeastern Massachusetts and parts of Rhode Island, which operated from 1845 to 1893. Old Colony trains ran from Boston to points such as Plymouth, Fall River, New Bedford, Newport, Providence, Fitchburg, Lowell and Cape Cod. For many years the Old Colony Railroad Company also operated steamboat and ferry lines, including those of the Fall River Line with express train service from Boston to its wharf in Fall River where passengers boarded luxury liners to New York City. The company also briefly operated a railroad line on Martha's Vineyard, as well as the freight-only Union Freight Railroad in Boston. The OC was named after the "Old Colony", the nickname for the Plymouth Colony.

The Lexington and West Cambridge Railroad was a railroad company chartered in 1845 and opened in 1846 that operated in eastern Massachusetts. It and its successors provided passenger service until 1977 and freight service until 1980 or early 1981.

<span class="mw-page-title-main">New Bedford Main Line</span>

The New Bedford Main Line, also known as the New Bedford Subdivision, is a freight railroad line in the U.S. state of Massachusetts owned by the Massachusetts Bay Transit Authority, with freight operations handled by the Massachusetts Coastal Railroad. The line runs from Cotley Junction where it meets the Middleboro Secondary near Weir Village south to New Bedford along a former New York, New Haven and Hartford Railroad line. The Fall River Secondary branches off at Myricks Junction.

<span class="mw-page-title-main">Middleboro Secondary</span>

The Middleboro Secondary is a railroad line owned by MassDOT in the U.S. state of Massachusetts. The line runs from Attleboro to Middleborough via Taunton.

<span class="mw-page-title-main">Mansfield station (MBTA)</span> Rail station in Mansfield, Massachusetts, US

Mansfield station is an MBTA Commuter Rail station in Mansfield, Massachusetts. Located in downtown Mansfield, it serves the Providence/Stoughton Line. With 1,966 weekday boardings in a 2018 count, Mansfield is the third-busiest station on the system outside Boston.

<span class="mw-page-title-main">Middleborough/Lakeville station</span> Commuter rail station in Lakeville, Massachusetts, US

Middleborough/Lakeville station is an MBTA Commuter Rail station in Lakeville, Massachusetts, just south of the Middleborough border. It is the southern terminus of the Middleborough/Lakeville Line; it is also an intermediate stop for seasonal CapeFlyer service to Cape Cod. Middleborough/Lakeville has a single full-length high-level side platform serving the line's single track.

<span class="mw-page-title-main">Massachusetts Coastal Railroad</span> Railroad in Massachusetts

The Massachusetts Coastal Railroad is a Class III railroad serving south-eastern Massachusetts. The railroad maintains track from Hyannis to Framingham, operating over 135 miles of track between Hyannis and Fall River/New Bedford. The railroad is the successor operator of portions of the Bay Colony Railroad.

<span class="mw-page-title-main">Taunton station (Old Colony Railroad)</span>

Old Colony Railroad Station is an historic Italianate train station located off Dean Street in Taunton, Massachusetts. The historic station, also known as Dean Street, is proposed to be joined by the modern Taunton station around 2030 as part of Phase 2 of the South Coast Rail project.

<span class="mw-page-title-main">South Coast Rail</span> Railway construction project in Massachusetts

South Coast Rail is a project to build a new southern line of the MBTA Commuter Rail system along several abandoned and freight-only rail lines. The line has been planned to restore passenger rail service between Boston and the cities of Taunton, Fall River, and New Bedford, via the towns of Berkley, and Freetown, on the south coast of Massachusetts. It would restore passenger service to some of the southern lines of the former Old Colony Railroad and the New York, New Haven and Hartford Railroad.

<span class="mw-page-title-main">Freetown station</span> Future railway station in Freetown, Massachusetts, US

Freetown station is a future MBTA Commuter Rail station located in the Assonet village of Freetown, Massachusetts. It is planned to open in 2024 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the west side of the Fall River Secondary, along with a park and ride lot.

<span class="mw-page-title-main">Fall River station</span> Railway station in Fall River, MA

Fall River station is an under-construction MBTA Commuter Rail station in Fall River, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in 2024.

<span class="mw-page-title-main">Church Street station (MBTA)</span> Under-construction railway station in New Bedford, Massachusetts, US

Church Street station is an under-construction MBTA Commuter Rail station located in northern New Bedford, Massachusetts, United States. It is planned to open in 2024 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the east side of the New Bedford Subdivision, along with a park and ride lot.

<span class="mw-page-title-main">New Bedford station</span>

New Bedford station is an under-construction MBTA Commuter Rail station in New Bedford, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in 2024.

The Dighton and Somerset Railroad, currently referred to as the Dean Street Industrial Track, is a railroad that ran between Fall River and Braintree, Massachusetts. It opened in 1866; from the 1890s to the 1930s and again in the late 1950s, it was the primary rail route from Boston to the South Coast. Passenger service ended in stages with the final regular service in 1958, though freight service on two short segments continues into the 21st century. MBTA Commuter Rail service is proposed to be extended onto the northern part of the line around 2030 as part of the South Coast Rail project.

<span class="mw-page-title-main">Taunton station (Amtrak)</span>

Taunton station was a passenger rail station located south of Oak Street in downtown Taunton, Massachusetts. As Taunton Central station, it served local and Boston-focused routes from 1836 to 1964. A later station at the same site served Amtrak's Cape Codder from 1986 to 1996, and Cape Cod and Hyannis Railroad commuter trains in 1988.

<span class="mw-page-title-main">Track 61 (Boston)</span> Industrial rail terminal track in South Boston, Massachusetts

Track 61 is an industrial rail terminal track in South Boston, Massachusetts, also known as the Boston Terminal Running Track. Track 61 is the last remnant of the vast rail yards that once covered much of the South Boston waterfront. Track 61 legally begins at Summer Street, while the line from Bay Junction to Summer Street is the Boston Terminal Running Track and Terminal Yard. However, the names are frequently used interchangeably.

<span class="mw-page-title-main">Middleborough station</span> Rail station in Middleborough, Massachusetts, US

Middleborough station is an under-construction MBTA Commuter Rail station in Middleborough, Massachusetts. It is expected to open in 2024 as part of the South Coast Rail project, replacing Middleborough/Lakeville station for regular service. The station will have a single side platform located inside the wye between the Middleborough Main Line and the Middleboro Secondary.

<span class="mw-page-title-main">Whittenton Branch</span> Defunct railroad branch in Massachusetts

The Whittenton Branch was a short railroad branch in the state of Massachusetts that formerly connected the city of Taunton and Raynham. The 3-mile (4.8 km) branch initially opened in 1881 and was later extended to connect the New Bedford and Taunton Railroad and the Dighton and Somerset Railroad.

References

  1. 1 2 3 4 5 6 7 8 VHB/HNTB (January 31, 2018). "Chapter 2 – Alternatives Analysis". South Coast Rail Draft Supplemental Environmental Impact Report. Massachusetts Department of Transportation.
  2. 1 2 3 4 5 Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. ISBN   9780942147124.
  3. "City of Taunton: Easterly Part". New Topographical Atlas of Surveys, Bristol County, Massachusetts. Publisher: Everts & Richards. 1895. pp. 68–69 via Wikimedia Commons.
  4. "New Haven Announces New Cuts in Train Service". Boston Globe. August 12, 1919. p. 5 via Newspapers.com. Open Access logo PLoS transparent.svg
  5. "New Train Schedules on Railroads Sunday". Boston Globe. April 23, 1925. p. 6 via Newspapers.com. Open Access logo PLoS transparent.svg
  6. "Bus May Be Only Taunton–Middleboro Connection". Boston Globe. November 29, 1927. p. 5 via Newspapers.com. Open Access logo PLoS transparent.svg
  7. "Bay State gets Conrail lines". Boston Globe. December 31, 1982. p. 16 via Newspapers.com. Open Access logo PLoS transparent.svg
  8. "South Coast Rail Fact Sheet" (PDF). Massachusetts Department of Transportation. October 2008. Archived from the original (PDF) on September 5, 2015.
  9. "Taunton Depot Rail Alternative" (PDF). Massachusetts Department of Transportation. September 11, 2009. Archived from the original (PDF) on January 4, 2014.
  10. South Coast Rail Economic Development and Land Use Corridor Plan (PDF). Massachusetts Executive Office of Transportation and Executive Office of Housing and Economic Development. June 2009. p. 81. Archived from the original (PDF) on December 7, 2013.
  11. "Figure 3.2-26 Taunton Depot Station Conceptual Station Design" (PDF). Volume II: FEIS/FEIR Figures Final Environmental Impact Statement/Final Environmental Impact Report on the South Coast Rail Project proposed by the Massachusetts Department of Transportation. U.S. Army Corps of Engineers New England District. August 2013. Retrieved 23 July 2014.
  12. "The Massachusetts Rail Program" (PDF). Massachusetts Department of Transportation. June 2010. p. 7. Archived from the original (PDF) on May 24, 2012.
  13. "Notice of Project Change" (PDF). Massachusetts Department of Transportation. March 15, 2017. Archived from the original (PDF) on April 18, 2017.
  14. Laidler, John (June 16, 2017). "Sharp differences over latest plan for South Coast Rail". Boston Globe. Retrieved June 18, 2017.
  15. Roy, Linda (August 6, 2020). "North End industrial site demolished for commuter rail station". South Coast Today.
  16. "FMCB Approves $403.5 Million Contract for South Coast Rail Main Line Construction" (Press release). Massachusetts Bay Transportation Authority. August 24, 2020.
  17. "South Coast Rail Fall Update" (Press release). Massachusetts Bay Transportation Authority. November 19, 2021.
  18. "South Coast Rail Fall River Construction Update" (PDF). Massachusetts Bay Transportation Authority. October 13, 2022.
  19. Baker, Ed (December 19, 2022). "'A village environment': Shops, apartments can be built near a new Taunton station". Taunton Gazette. Retrieved December 19, 2022.
  20. Medeiros, Dan (September 29, 2023). "South Coast Rail passenger service is being delayed. Here's why, explained in 60 seconds". The Herald News. Archived from the original on September 30, 2023.
  21. "South Coast Rail Shows Visible Progress" (PDF). South Coast Rail Fall 2023 Fact Sheet. Massachusetts Bay Transportation Authority. Fall 2023. p. 1.
  22. Medeiros, Dan (April 11, 2024). "Summer start to South Coast Rail looks 'unlikely' — but there's one bright spot for riders". The Herald News. Archived from the original on April 11, 2024.

Commons-logo.svg Media related to East Taunton station at Wikimedia Commons