East Taunton | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||
Location | Industrial Drive off Route 140 Taunton, Massachusetts | |||||||||||||
Coordinates | 41°52′05″N71°03′41″W / 41.86799°N 71.06148°W | |||||||||||||
Line(s) | New Bedford Secondary | |||||||||||||
Platforms | 1 island platform | |||||||||||||
Tracks | 3 (2 station tracks, 1 freight bypass) | |||||||||||||
Connections | GATRA: 8 [1] | |||||||||||||
Construction | ||||||||||||||
Accessible | Yes | |||||||||||||
Other information | ||||||||||||||
Fare zone | 8 [2] | |||||||||||||
History | ||||||||||||||
Opening | May 2025 (planned) | |||||||||||||
Passengers | ||||||||||||||
2030 | 420 daily boardings (projected) [1] : 66 | |||||||||||||
Planned services | ||||||||||||||
| ||||||||||||||
| ||||||||||||||
|
East Taunton station is a not-yet-opened MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street (Route 140). It is planned to open in 2025 as part of the first phase of the South Coast Rail project.
A former East Taunton station, located to the east on a different line, was served by the New York, New Haven and Hartford Railroad and several predecessors until 1927. In 2009, South Coast Rail planning identified Taunton Depot, just north of Middleborough Junction (Cotley Junction), as a preferred station site. A 2017 re-evaluation of the project recommended an interim route through Middleborough, with East Taunton station located just south of the junction. A construction contract was issued in 2020; the station was completed in October 2024.
The station will be located in the southeast portion of Taunton along the New Bedford Secondary, slightly northwest of the Route 24 expressway. The station driveway (an extension of the existing Industrial Drive) will be reached from County Street (Route 140) just north of the Route 24/Route 140 interchange. [1] East Taunton will have a single full-length high-level island platform, 800 feet (240 m) long and 26.5 feet (8.1 m) wide. It will serve the two passenger tracks, with a freight bypass track to the west. [1] Two footbridges – one with stairs, the other with ramps – will connect the platform to the 363-space parking lot, which includes a turnout for Greater Attleboro Taunton Regional Transit Authority (GATRA) buses. [1]
The Taunton Branch Railroad was extended to New Bedford as the New Bedford and Taunton Railroad in 1840. [3] : 398 The Middleborough and Taunton Railroad opened from Middleborough to Cotley Junction (Middleborough Junction) – south of Taunton on the New Bedford and Taunton Railroad – in 1856. [3] : 398 No station was located at the junction, which was in a relatively unpopulated area. East Taunton station on the Middleborough and Taunton was located 2 miles (3.2 km) east at Old Colony Avenue in East Taunton village. [4] The Middleborough and Taunton was acquired by the Old Colony Railroad in 1874, followed by the former New Bedford and Taunton (after several ownership and name changes) in 1879. [3] : 398 The Old Colony was in turn acquired by the New York, New Haven and Hartford Railroad in 1893. [3]
Local passenger service between Middleborough and Taunton was operated as Providence–Plymouth or Taunton–Plymouth trains; it was discontinued in 1927 when service on the Darby Branch ended. [5] [6] [7] East Taunton station was closed; the line was used by New York–Cape Cod trains until 1964, and commuter rail service to New Bedford via Taunton lasted until 1958. [3] : 399 Freight service continued on the Middleboro Secondary and New Bedford Subdivision; the state purchased the former line from Conrail in December 1982. [8]
In September 2008, MassDOT released 18 potential station sites for the South Coast Rail project, including two potential East Taunton sites: one just west of Route 24 if trains were routed through Middleborough, and one to the north off Route 140 if trains were routed through Stoughton or Attleboro. [9] The 2009 selection of the Stoughton route included Taunton Depot at the northern site. It was to have an island platform flanked by two passenger tracks, with a freight passing track on the western side. [10] Potential transit-oriented development included new multi-family housing to the north, and eventual redevelopment of a nearby shopping center. [11] Station plans released as part of the Final Environmental Impact Report in 2013 were nearly identical to those from 2009. [12] On June 11, 2010, the state took ownership of the New Bedford Subdivision and several other CSX lines as part of a sale agreement. [13]
In 2017, the project was re-evaluated due to cost issues. The new proposal called for early service via Middleborough by 2022, followed by full service via Stoughton by 2030. [14] The 2017 proposal attracted criticism from local officials across the route, including Taunton officials unhappy that the downtown Taunton station would be delayed until 2030. [15] The January 2018 Draft Supplemental Environmental Impact Report considered several service patterns: serving Taunton Depot and/or Taunton stations with a reverse move on some or all trains, or a new East Taunton station near the previously proposed southern site. The latter option was chosen for lower costs and shorter travel times. [1] : 28
Two sites just south of Cotley Junction, and one site at Old Colony Avenue (the former East Taunton station location) were considered. The previously-considered southern site (a former sports complex on Industrial Drive at 1141 County Street) was chosen. The site is adjacent to the interchange between the Route 24 expressway and County Street (Route 140). [1] : 41 As with the former Taunton Depot plans, the station will have a single island platform with two passenger tracks and a freight passing track. [1] : 41
The sports complex was demolished in 2020 to make room for the station and its parking lot. [16] The MBTA awarded a $403.5 million contract for the Middleborough Secondary and New Bedford Secondary portions of the project, including East Taunton station, on August 24, 2020. Construction was expected to begin later in 2020 and take 37 months, with a late 2023 opening. [17] The contract was 18% complete by November 2021, with station construction underway, and 53% complete by August 2022. [18] [19] In December 2022, the city council approved a zoning change allowing transit oriented development near the station. [20] Opening was delayed to mid-2024 in September 2023; at that point, the station was 69% complete and expected to be finished in January 2024. [21] [22] In June 2024, planned opening was further delayed to May 2025. East Taunton station was 75% complete at that point and expected to be completed in August 2024. The complex construction of East Taunton station, including the elevators, was one of the reasons given for the delay. [23] [2] The station was ultimately completed in October 2024. [24]
Porter station is a Massachusetts Bay Transportation Authority (MBTA) transit station in Cambridge, Massachusetts. It serves the Red Line rapid transit line, the MBTA Commuter Rail Fitchburg Line, and several MBTA bus lines. Located at Porter Square at the intersection of Massachusetts and Somerville Avenues, the station provides rapid transit access to northern Cambridge and the western portions of Somerville. Porter is 14 minutes from Park Street on the Red Line, and about 10 minutes from North Station on commuter rail trains. Several local MBTA bus routes also stop at the station.
North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
The Old Colony Railroad (OC) was a major railroad system, mainly covering southeastern Massachusetts and parts of Rhode Island, which operated from 1845 to 1893. Old Colony trains ran from Boston to points such as Plymouth, Fall River, New Bedford, Newport, Providence, Fitchburg, Lowell and Cape Cod. For many years the Old Colony Railroad Company also operated steamboat and ferry lines, including those of the Fall River Line with express train service from Boston to its wharf in Fall River where passengers boarded luxury liners to New York City. The company also briefly operated a railroad line on Martha's Vineyard, as well as the freight-only Union Freight Railroad in Boston. The OC was named after the "Old Colony", the nickname for the Plymouth Colony.
The Old Colony Lines are a pair of branches of the MBTA Commuter Rail system, connecting downtown Boston, Massachusetts with the South Shore and cranberry-farming country to the south and southeast. The two branches operate concurrently for 10 miles (16 km) via the Old Colony Mainline from South Station to Braintree station. The Middleborough/Lakeville Line then winds south through Holbrook, Brockton, Bridgewater, Middleborough, and Lakeville via the Middleborough Main Line and Cape Main Line. The Kingston Line heads southeast to serve Weymouth, Abington, Whitman, Hanson, Halifax, and Kingston by way of the Plymouth branch. Limited service to Plymouth was provided prior to April 2021 but was cut due to low ridership and budget constraints. The Greenbush Line, which was also part of the Old Colony Division, was reactivated in 2007 as a separate project.
The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.
The Middleboro Secondary is a railroad line owned by MassDOT in the U.S. state of Massachusetts. The line runs from Attleboro to Middleborough via Taunton.
Mansfield station is an MBTA Commuter Rail station in Mansfield, Massachusetts. Located in downtown Mansfield, it serves the Providence/Stoughton Line. With 1,966 weekday boardings in a 2018 count, Mansfield is the third-busiest station on the system outside Boston.
Middleborough/Lakeville station is an MBTA Commuter Rail station in Lakeville, Massachusetts, just south of the Middleborough border. It is the southern terminus of the Middleborough/Lakeville Line; it is also an intermediate stop for seasonal CapeFlyer service to Cape Cod. Middleborough/Lakeville has a single full-length high-level side platform serving the line's single track.
Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system.
The Massachusetts Coastal Railroad is a Class III railroad serving south-eastern Massachusetts. The railroad maintains track from Hyannis to Framingham, operating over 135 miles of track between Hyannis and Fall River/New Bedford. The railroad is the successor operator of portions of the Bay Colony Railroad.
South Coast Rail is a project to build a new southern line of the MBTA Commuter Rail system along several abandoned and freight-only rail lines. The line will restore passenger rail service between Boston and the cities of Taunton, Fall River, and New Bedford, via the towns of Berkley, and Freetown, on the south coast of Massachusetts. It includes passenger service to some of the southern lines of the former Old Colony Railroad and the New York, New Haven and Hartford Railroad.
Freetown station is a future MBTA Commuter Rail station located in the Assonet village of Freetown, Massachusetts. It is planned to open in May 2025 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the west side of the Fall River Secondary, along with a park and ride lot.
Fall River station is an under-construction MBTA Commuter Rail station in Fall River, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in May 2025.
Church Street station is an under-construction MBTA Commuter Rail station located in northern New Bedford, Massachusetts, United States. It is planned to open in May 2025 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the east side of the New Bedford Subdivision, along with a park and ride lot.
New Bedford station is an under-construction MBTA Commuter Rail station in New Bedford, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in May 2025.
The Dighton and Somerset Railroad, currently referred to as the Dean Street Industrial Track, is a railroad that ran between Fall River and Braintree, Massachusetts. It opened in 1866; from the 1890s to the 1930s and again in the late 1950s, it was the primary rail route from Boston to the South Coast. Passenger service ended in stages with the final regular service in 1958, though freight service on two short segments continues into the 21st century. MBTA Commuter Rail service is proposed to be extended onto the northern part of the line around 2030 as part of the South Coast Rail project.
Taunton station was a passenger rail station located south of Oak Street in downtown Taunton, Massachusetts. As Taunton Central station, it served local and Boston-focused routes from 1836 to 1964. A later station at the same site served Amtrak's Cape Codder from 1986 to 1996, and Cape Cod and Hyannis Railroad commuter trains in 1988.
Middleborough station is an under-construction MBTA Commuter Rail station in Middleborough, Massachusetts. It is expected to open in May 2025 as part of the South Coast Rail project, replacing Middleborough/Lakeville station for regular service. The station will have a single side platform located inside the wye between the Middleborough Main Line and the Middleboro Secondary.
Media related to East Taunton station at Wikimedia Commons