Edmonton-Strathcona County Footbridge

Last updated

Edmonton-Strathcona County Footbridge is a pedestrian bridge spanning the North Saskatchewan River between Edmonton and Strathcona County, Alberta.

Construction started in June 2023. [1] It was opened to the public in August 2025. An official grand opening and a revealing of the name is expected in September 2025. [2]

Gathering areas at both ends of the bridge, multi-use pathways connecting to existing trails and a public washroom will be added later. Cost of the project is $41.4 million, which was split between the River Valley Alliance, the City of Edmonton, and Strathcona County. [3]

References

  1. "Edmonton-Strathcona County Footbridge Project celebrates sod turning". Renew Canada. 8 June 2023. Retrieved 22 August 2025.
  2. Knopp, Elliott (5 August 2025). "New river valley footbridge connecting Edmonton to Sherwood Park opens to the public". CityNews. Retrieved 22 August 2025.
  3. Gordon, Lucy (21 August 2025). "Edmonton-Strathcona Footbridge delights nature enthusiasts, connects River Valley trails". Sherwood Park News. Retrieved 22 August 2025.

53°37′42″N113°19′21″W / 53.62842°N 113.32241°W / 53.62842; -113.32241