Edmonton-Strathcona County Footbridge is a pedestrian bridge spanning the North Saskatchewan River between Edmonton and Strathcona County, Alberta.
Construction started in June 2023. [1] It was opened to the public in August 2025. An official grand opening and a revealing of the name is expected in September 2025. [2]
Gathering areas at both ends of the bridge, multi-use pathways connecting to existing trails and a public washroom will be added later. Cost of the project is $41.4 million, which was split between the River Valley Alliance, the City of Edmonton, and Strathcona County. [3]