Type | Public |
---|---|
Industry | Energy |
Predecessor | Electric Utility Company of BiH "Elektrobih" |
Founded | 30 August 1945 |
Headquarters | Vilsonovo Šetalište 15, , |
Key people | v.d. Sanel Buljubašić, GM |
Products | Electricity |
Production output | 7.009 GWh (2017) |
Services | generation, transmission and distribution |
Revenue | €583.35 million (2017 [1] ) |
€0.32 million (2017 [1] ) | |
Total equity | €1.721 billion (2017 [1] ) |
Number of employees | 4,566 (2017 [1] ) |
Parent | EPBiH Concern |
Website | elektroprivreda |
Elektroprivreda BiH or JP Elektroprivreda Bosne i Hercegovine d.d. (English: Public Enterprise Electric Utility of Bosnia and Herzegovina; abbr. EPBiH) is a Bosnian public electric utility company with headquarters in Sarajevo, Bosnia and Herzegovina.
Elektroprivreda BiH was established on 30 August 1945 as the Electric Utility Company of Bosnia and Herzegovina "Elektrobih". [2] On 20 May 2004, it became an entity government-owned publicly traded company. The company celebrates 7 September as the day of its establishment.[ citation needed ]
The company is the largest electric utility company in Bosnia and Herzegovina, and as such part of the largest country's energy concern EPBiH Concern. [3] Elektroprivreda BiH is a joint stock company in which 90% of the capital is owned by the Federation of BiH entity government, and 10% is owned by minority shareholders. [4]
Electric utility activities for the company are:
As the largest electric utility company in Bosnia and Herzegovina, it has 756,599 customers and 4,434 employees. [2] As of 2017, the company has an installed generating capacities of 1,682 MW, of which in lignite-fired thermal power plants 1,165 MW, and hydro power plants 517 MW. It has a transmission and distribution lines of 27.405 km in a network of 31,757 kilometres (19,733 mi), with 2.825 MVA distribution substations. [2]
Also, it generates 7.009 TWh of electricity annually. [5]
Electricity distribution is organized through five distribution regional offices:
The economy of Bosnia and Herzegovina is a transitional, upper middle income economy. Bosnia and Herzegovina declared independence from socialist Yugoslavia on 1 March 1992. The main trading partners are Germany, Italy, Austria, Turkey and other neighboring Balkan countries.
The Herzegovina-Neretva Canton is one of 10 cantons of the Federation of Bosnia and Herzegovina in Bosnia and Herzegovina.
The Federation of Bosnia and Herzegovina is one of the two entities composing Bosnia and Herzegovina, the other being Republika Srpska. The Federation of Bosnia and Herzegovina consists of ten autonomous cantons with their own governments and legislatures.
The economy of Sarajevo is based largely on industries such as manufacturing and tourism. Sarajevo is economically one of the strongest regions of Bosnia and Herzegovina. As the center of various levels of area politics, many Sarajevo citizens also work in government. A number of local and international companies are present in the city and contribute to its economic health.
The Ugljevik Power Plant is a coal-fired power plant in Ugljevik, Bosnia and Herzegovina. It is owned and operated by Rudnik i termoelektrana Ugljevik, a subsidiary of Elektroprivreda Republike Srpske. RiTE Ugljevik is an integrated coal mining and power generating company.
JP Elektroprivreda HZHB d.d. is a public power utility company based in Mostar, Bosnia and Herzegovina.
The mass media of Bosnia and Herzegovina refers to mass media outlets based in Bosnia and Herzegovina (BiH). Television, radio, magazines and newspapers are all operated by both state-owned and for-profit corporations which depend on advertising, subscription, and other sales-related revenues. The Constitution of Bosnia and Herzegovina guarantees freedom of speech, although political and business pressures - coupled with administrative fragmentation - still hinder the independence of journalists and media outlets.
Telecommunications in Bosnia and Herzegovina include radio, television, fixed and mobile telephones, and the Internet.
The Grabovica Hydro Power Plant is one of Bosnia and Herzegovina's largest hydro power plant having an installed electric capacity of 117 MW. It was commissioned is 1982, and is operated by JP Elektroprivreda BiH.
The Rama Dam is a concrete-face rock-fill dam on the Rama river, a tributary of the Neretva river, about 4 km (2.5 mi) southwest of the town of Prozor in the Herzegovina-Neretva Canton of Bosnia and Herzegovina.
The Buk Bijela Hydro Power Plant is proposed hydroelectric power plant (HPP) on the Drina river in Bosnia and Herzegovina.
Tuzla Thermal Power Plant is a coal-fired thermal power plant in Tuzla, Bosnia and Herzegovina. It is the largest power plant in Bosnia and Herzegovina. It is operated by Elektroprivreda Bosne i Hercegovine (EBiH).
Kakanj Thermal Power Plant is one of Bosnia and Herzegovina's largest coal-fired power plant having an installed electric capacity of 450 MW and producing around 2.3 billion Kwh of electricity per year. The power plant is operated by Elektroprivreda Bosne i Hercegovine. The chimney of Kakanj Power Plant is 300 metres tall and is one of the tallest man-made objects built in former Yugoslavia.
Elektroprivreda Crne Gore AD is an integrated electricity company located in Niksić, Montenegro. The company is listed at Montenegro Stock Exchange with majority of shares owned by the government. Rest of the shares are traded at the Montenegro Stock Exchange.
The relations between Bosnia and Herzegovina and Croatia were established on 7 July 1992, following both countries' declarations of independence from Yugoslavia during its breakup and Yugoslav Wars.
The Jablanica Dam is an arch-gravity dam on the Neretva River about 4 km (2.5 mi) northwest of Jablanica in the Herzegovina-Neretva Canton of Bosnia and Herzegovina. The dam was constructed between 1947 and 1955 with the primary purpose of hydroelectric power production. The power station was commissioned in two stages, from 1955 until 1958. The first generator was commissioned in February 1955. An upgrade in 2008 increased the installed capacity of the power station from 150 MW to 180 MW. The dam's power station is located about 4.4 km (2.7 mi) to the southeast near Jablanica and discharges back into the Neretva River. It contains six 30 MW Francis turbine-generators for an installed capacity of 180 MW. The difference in elevation between the reservoir and power station afford a hydraulic head of 111 m (364 ft). The dam is 85 m (279 ft) tall and creates Jablanica lake. The dam and power station are owned and operated by Elektroprivreda Bosne i Hercegovine.
The Croatian Peasant Party of Bosnia and Herzegovina is a Croatian political party in Bosnia and Herzegovina.
Federal News Agency or FENA is the government-owned national news agency of the Federation of Bosnia and Herzegovina.
Aluminij Industries is an aluminium producing company and a subsidiary of M.T. Abraham Group based in Mostar, Bosnia and Herzegovina. Since 2020 it is leasing the production assets of Aluminij, an aluminium producer established in 1975 and for a long time one of the largest producers and exporters in Bosnia and Herzegovina. Since 2022, Aluminij Industries is the largest exporter in Bosnia and Herzegovina and the second largest importer.