Enbridge Centre | |
---|---|
Alternative names | Kelley Ramsey Tower |
General information | |
Status | Completed |
Type | Office |
Address | 10175 - 101 Street NW, Edmonton, Alberta, Canada |
Coordinates | 53°32′33″N113°29′36″W / 53.5424°N 113.4933°W |
Construction started | 2013 |
Completed | 2016 |
Owner | John Day Developments; Pangman Development Corporation |
Height | 110.6 m (363 ft) |
Technical details | |
Floor count | 26 |
Floor area | 51,190 m2 (551,000 sq ft) |
Lifts/elevators | 15 |
Design and construction | |
Architecture firm | DIALOG |
Structural engineer | DIALOG |
Main contractor | Ledcor Construction Limited |
Other information | |
Parking | 372 stalls |
Website | |
www | |
References | |
[1] |
Enbridge Centre is a 28-storey office tower in Edmonton, Alberta. The facade of the building uses the bricks from the historic Kelly Ramsey Building, which previously occupied the site. [2] It is located on 101 St. NW, and is connected to the Pedway network.
The Kelly Ramsey Building was an historic building located in Downtown Edmonton at 10040 101A Avenue on Rice Howard Way.
{{cite web}}
: CS1 maint: unfit URL (link)