The Enel Corugea Wind Farm is a wind power project in Tulcea County, Romania. It will have 35 Vestas V90 wind turbines with a nominal output of 2 MW which will deliver up to 70 MW of power. Construction started in May 2011. [1]

Related Research Articles

The Babadag Wind Farm is a wind farm in Babadag, Tulcea County, Romania. The wind farm is owned and operated by Eviva Nalbant, a subsidiary of Portuguese multinational company Martifer. The project was developed as a joint implementation project. The wind park was financed with €23 million loan from Banca Comercială Română.

Wind power in Romania

Wind power in Romania has total cumulative installed capacity of 3,028 MW as of the end of 2016, up from the 14 MW installed capacity in 2009.

The Eolica Baia Wind Farm is a proposed wind power project in Baia, Tulcea County, Romania. The project consists of four individual wind farms connected together. It will have 63 individual wind turbines with a nominal output of around 2 MW. The wind farm will deliver up to 126 MW of power, enough to supply over 75,600 homes with a capital investment required of approximately US$150 million.

The Eolica Beidaud Wind Farm is a proposed wind power project in Beidaud, Tulcea County, Romania. It will consist of four individual wind farms connected together. It will have 64 individual wind turbines with a nominal output of around 2 MW which will deliver up to 128 MW of power, enough to power over 75,800 homes, with a capital investment required of approximately US$150 million.

The Eolica Casimcea Wind Farm is a proposed wind power project in Casimcea, Tulcea County, Romania. It will consist of six individual wind farms connected together. It will have 122 individual wind turbines with a nominal output of around 2 MW which will deliver up to 244 MW of power, enough to power over 150,000 homes, with a capital investment required of approximately US$300 million.

The Eolica Sarichioi Wind Farm is a proposed wind power project in Sarichioi, Tulcea County, Romania. It will consist of eight individual wind farms connected together. It will have 51 individual wind turbines with a nominal output of around 2 MW which will deliver up to 102 MW of power, enough to power over 66,700 homes, with a capital investment required of approximately US$110 million.

The Enel Agighiol Wind Farm is wind farm located in Tulcea County, Romania. It has 17 individual wind turbines with a nominal output of around 2 MW each and delivers up to 34 MW of power, enough to power over 35,000 homes, which required a capital investment of approximately US$50 million.

The Verbund Casimcea Wind Farm is an operational wind power project located in Tulcea County, Romania. It consists of 88 individual wind turbines with a nominal output 2.5 MW each which will deliver up to 540 GWh of power, enough to power over 350,000 homes, with a capital investment required of approximately €380 million.

The Baia Wind Farm is an under construction wind power project in Baia, Tulcea County, Romania. It will have 14 individual wind turbines with a nominal output of around 2.5 MW which will deliver up to 35 MW of power, enough to power over 21,000 homes, with a capital investment required of approximately US$84 million.

The Alum Tulcea Power Station will be a large electricity producer in Romania, having 5 natural gas-fired groups of 50 MW each totalling an installed capacity of 250 MW and an electricity generation capacity of around 0.6 TWh/year.

The Activ Business Casimcea Wind Farm is a proposed wind power project in Casimcea, Tulcea County, Romania. It will have 13 individual wind turbines with a nominal output of around 3.46 MW which will deliver up to 45 MW of power, enough to power over 28,450 homes, with a capital investment required of approximately US$80 million.

The Green Energy Wind Farm is a proposed wind power project in Tulcea County, Romania. It will have 200 individual wind turbines with a nominal output of around 1 MW which will deliver up to 200 MW of power, enough to power over 79,200 homes, with a capital investment required of approximately US$450 million.

The Valea Nucarilor Wind Farm is a wind power project in Valea Nucarilor, Tulcea County, Romania. It has 80 individual wind turbines with a nominal output of around 0.75 MW which will deliver up to 70 MW of power, enough to power over 36,000 homes, with a capital investment required of approximately US$75 million.

The Văcăreni Wind Farm is a proposed wind power project in Văcăreni, Tulcea County, Romania. It will have 48 individual wind turbines with a nominal output of around 5 MW each which will deliver up to 240 MW of power, enough to power over 144,000 homes, with a capital investment required of approximately US$480 million.

Enel Green Power

Enel Green Power S.p.A. is an Italian multinational renewable energy corporation, headquartered in Rome. The company was formed as a subsidiary of the power generation firm Enel in December 2008. It is present with assets in operation or under construction in 21 countries and carries out development activities in a further 6 countries on five continents generating energy from hydropower, wind, solar and geothermal sources. As of 2021, it manages a capacity of 50 GW and has over 1200 plants worldwide. From 4 November 2010 to 31 March 2016, the company was listed on the FTSE MIB index of the Milan Stock Exchange, as well as on the Madrid Stock Exchange and the Barcelona, Bilbao, and Valencia regional Stock Exchanges.

The EDP Sarichioi Wind Farm is a proposed wind power project in Sarichioi, Tulcea County, Romania. It will have 11 individual Vestas V90 wind turbines with a nominal output of around 3 MW which will deliver up to 33 MW of power, enough to power over 21,500 homes, with a capital investment required of approximately US$50 million.

The Wind Farm Casimcea is an under construction wind power project in Tulcea County, Romania. It will consist of an individual wind farm with 77 individual wind turbines with a nominal output of around 2,3-3 MW which will deliver up to 688 000 000 kWh of power, enough to power over 445,000 homes, with a capital investment required of approximately €300 million.

The Portoscuso Wind Farm is a proposed wind power project in Portoscuso, Sardinia, Italy. It will have 39 individual wind turbines with a nominal output of around 2.3 MW each which will deliver up to 90 MW of power, enough to power over 70,000 homes, with a capital investment required of approximately €100 million. The wind farm will have an electricity production of 185 GWh per year that will save the emission of 130,000 tonnes of carbon dioxide.

The Sălbatica I Wind Farm is wind farm located in Tulcea County, Romania. It has 35 individual wind turbines with a nominal output of around 2 MW each and delivers up to 70 MW of power, enough to power over 66,000 homes, which required a capital investment of approximately US$100 million.

References

  1. "Enel construieste un parc eolian de 70 MW in judetul Tulcea" (in Romanian). Energie Live. 2011-05-03. Archived from the original on 2012-03-23. Retrieved 2012-12-16.