Flyaway cost

Last updated

Flyaway cost is one measure of the cost of an aircraft. It values the aircraft at its marginal cost, including only the cost of production and production tools essential for building a single unit. [1] It excludes sunk costs such as research and development, supplementary costs such as support equipment, and future costs such as spares and maintenance. [2]

There are other possible measures of aircraft cost:

The flyaway cost can be meaningfully compared to another cost metric, the procurement cost. The procurement cost (often referred to for military aircraft as the weapons system cost) is the total price of the aircraft. A good way of looking at the difference is the flyaway cost is the cost of making the aircraft, but the procurement cost is the cost of buying the aircraft. Procurement costs may include ancillary equipment costs, one time non-recurring contract costs, and airframe, engine and avionics support costs. For example, the flyaway cost for the Boeing F/A-18E/F Super Hornet up to 2009 (for the 449 units built) was US$ 57.5 million per unit, but the procurement cost was 39.8% higher, at US$ 80.4 million per unit. [4] The production cost of technologically complicated aircraft will always be higher during the low rate initial production (LRIP) period, and costs per units invariably drop as an aircraft is put into full production. The Government Accountability Office has found that the United States Department of Defense rarely achieves these cost savings because few programs move from LRIP to full-scale production. [5]

Related Research Articles

Northrop Grumman RQ-4 Global Hawk Unmanned surveillance aircraft

The Northrop Grumman RQ-4 Global Hawk is a high-altitude, remotely-piloted, surveillance aircraft. It was initially designed by Ryan Aeronautical, and known as Tier II+ during development. The Global Hawk performs duties similar to that of the Lockheed U-2. The RQ-4 provides a broad overview and systematic surveillance using high-resolution synthetic aperture radar (SAR) and long-range electro-optical/infrared (EO/IR) sensors with long loiter times over target areas. It can survey as much as 40,000 square miles (100,000 km2) of terrain a day, an area the size of South Korea or Iceland.

Landing Craft Air Cushion Hovercraft employed as a landing craft

The Landing Craft Air Cushion (LCAC) is a class of air-cushion vehicle (hovercraft) used as landing craft by the United States Navy's Assault Craft Units and the Japan Maritime Self-Defense Force (JMSDF). They transport weapons systems, equipment, cargo and personnel of the assault elements of the Marine Air/Ground Task Force both from ship to shore and across the beach. It is to be replaced by the SSC.

The military budget is a large portion of the discretionary United States federal budget allocated to the Department of Defense, or more broadly, the portion of the budget that goes to any military-related expenditures. The military budget pays the salaries, training, and health care of uniformed and civilian personnel, maintains arms, equipment and facilities, funds operations, and develops and buys new items. The budget funds five branches of the U.S. military: the Army, Marine Corps, Navy, Air Force and Space Force.

Low rate initial production (LRIP) is a term commonly used in military weapon projects/programs to designate the phase of initial, small-quantity production. The prospective first buyer and operator gets to thoroughly test the weapons system over some protracted amount of time—in order to gain a reasonable degree of confidence as to whether the system actually performs to the agreed-upon requirements before contracts for mass production are signed. At the same time, manufacturers can use the LRIP as a production test-phase where they develop the assembly line models that would eventually be used in mass production. Therefore, the LRIP is commonly the first step in transitioning from highly customized, hand-built prototypes to the final mass-produced end product. In practice, either the production capability or the weapons system itself can be unready during the LRIP phase. This can mean that systems produced during LRIP are built significantly differently both in terms of technique and cost owing to the immaturity of the production line or changes in the weapons system's design, necessitating a large degree of hand-assembly and trial-and-error typically associated with the prototyping stage. Furthermore, the cost of each LRIP system can be much greater than the final mass production unit cost, since the LRIP cost can include both the R&D and setup cost for production, although the goal is that this additional cost is spread out over future production carried out by the assembly capacity developed during LRIP.

Mark 54 Lightweight Torpedo American torpedo

The Mark 54 Lightweight Torpedo is a standard 12.75 inch (324 mm) anti-submarine warfare (ASW) torpedo used by the United States Navy.

CG(X) ship project

The CG(X) program, also known as the Next Generation Cruiser program, was a United States Navy research program to develop a replacement vessel for its 22 Ticonderoga-class cruisers. Original plans were for 18–19 ships, based on the 14,500 ton Zumwalt-class destroyer with additional ballistic missile defense and area air defense for a carrier group. These vessels were to enter service beginning in 2017. The program was ended in 2010 with the intention of instead achieving the desired result with a successor to the Flight III Arleigh Burke–class destroyers.

Defense industry of Japan an industry for military of Japan

The Japanese defense industry is the major supplier of the nation's own Self-Defense Forces. Production costs are high, due to several factors: the successful Japanese economy of the postwar period allowed for generous defense spending; few products are exported, keeping production numbers low; research and development is done independently where possible, securing national self-sustainability; public investment in Japan tends to be uneconomic, aimed largely at gaining local voter support.

The military budget of Japan is the portion of the overall budget of Japan that is allocated for the funding of the Japanese Self-Defence Forces. This military budget finances employee salaries and training costs, the maintenance of equipment and facilities, support of new or ongoing operations, and development and procurement of new weapons, equipment, and vehicles.

Military budget of China

The military budget of China is the portion of the overall budget of China that is allocated for the funding of the military of China. This military budget finances employee salaries and training costs, the maintenance of equipment and facilities, support of new or ongoing operations, and development and procurement of new weapons, equipment, and vehicles. Every March, as part of its annual state budget, China releases a single overall figure for national military expenditures.

United States federal budget Budget of the U.S. federal government

The United States federal budget comprises the spending and revenues of the U.S. federal government. The budget is the financial representation of the priorities of the government, reflecting historical debates and competing economic philosophies. The government primarily spends on healthcare, retirement, and defense programs. The non-partisan Congressional Budget Office provides extensive analysis of the budget and its economic effects. It has reported that large budget deficits over the next 30 years are projected to drive federal debt held by the public to unprecedented levels—from 98 percent of gross domestic product (GDP) in 2020 to 195 percent by 2050.

A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values.

The following is a partial accounting of financial costs of the 2003 Iraq War by the United States and the United Kingdom, the two largest non-Iraqi participants of the multinational force in Iraq.

Joint Light Tactical Vehicle Type of Light tactical vehicle

The Joint Light Tactical Vehicle (JLTV) is a United States military program to part-replace the Humvee with a family of more survivable vehicles with greater payload. Early studies for the JLTV program were approved in 2006.

The Long Range Land Attack Projectile (LRLAP) is a cancelled precision guided 155 mm naval artillery shell for the U.S. Navy's Advanced Gun System (AGS). LRLAP was developed and produced by Lockheed Martin Missiles and Fire Control, the prime contractor being BAE Systems.

Lockheed Martin F-35 Lightning II procurement

Lockheed Martin F-35 Lightning II procurement is the planned selection and purchase of the Lockheed Martin F-35 Lightning II, also known as the Joint Strike Fighter (JSF) by various countries.

The United States federal budget consists of mandatory expenditures, discretionary spending for defense, Cabinet departments and agencies, and interest payments on debt. This is currently over half of U.S. government spending, the remainder coming from state and local governments.

Lockheed Martin F-35 Lightning II Canadian procurement

The Lockheed Martin F-35 Lightning II Canadian procurement was a defence procurement project of the Canadian government to purchase Lockheed Martin F-35 Lightning II Joint Strike Fighters for the Royal Canadian Air Force (RCAF), a process started in 1997. The F-35 procurement has been a source of considerable controversy in public policy circles in Canada since the federal government announced its intention to purchase the aircraft in 2010. In April 2012, with the release of a highly critical Auditor General of Canada report on the failures of the government's F-35 program, the procurement was labelled a national "scandal" and "fiasco" by the media. In a December 2014 analysis of the government's handling of the procurement Ottawa Citizen writer Michael Den Tandt cited the Harper government's "ineptitude, piled upon ineptitude, and bureaucracy, and inertia, driving a lack of progress".

Long Range Strike Bomber program US Air Force program in support of Northrop Grumman B-21 Raider development

The Long Range Strike Bomber program (LRS-B) is a development and acquisition program to develop a long-range strategic bomber for the United States Air Force, intended to be a heavy-payload stealth aircraft capable of delivering thermonuclear weapons. Initial capability is planned for the mid-2020s. A request for proposal to develop the aircraft was issued in July 2014. The Air Force plans to procure at least 100 of the LRS-B aircraft at a cost of an estimated $550 million each, with potentially as many as 200 units being considered to enter service eventually. A development contract was awarded to Northrop Grumman for its B-21 Raider in October 2015. Due to the sensitive nature much about the project is highly classified and little information is available to the public. As of late 2019, it was known that construction of the aircraft has commenced.

Armored Multi-Purpose Vehicle

The Armored Multi-Purpose Vehicle (AMPV) is a U.S. Army program to replace the M113 armored personnel carrier and family of vehicles. A contract for the Engineering, Manufacturing, and Development (EMD) phase was awarded to BAE Systems in December 2014. As of 2015 the program was scheduled to deliver 2,897 vehicles at a total cost of $10.723 billion, or $3.7 million per vehicle. The first AMPV prototype was rolled out on 15 December 2016, and the first production vehicles began rolling out in September 2020.

Lockheed Martin F-35 Lightning II development

Lockheed Martin F-35 Lightning II development started in 1995 with the origins of the Joint Strike Fighter program and is expected to culminate in the completion of operational testing and start of full-rate production in 2021. The X-35 first flew on 24 October 2000 and the F-35A on 15 December 2006.

References

  1. "FY 2009 Budget Estimates." Archived October 3, 2008, at the Wayback Machine United States Air Force via saffm.hq.af.mil, February 2008, p. 81.
  2. "Unmanned Aerial Vehicles: Progress Toward Meeting High Altitude Endurance Aircraft Price Goals".
  3. "Archived copy" (PDF). Archived from the original (PDF) on 2007-07-26. Retrieved 2010-12-20.CS1 maint: archived copy as title (link)
  4. "Department Of The Navy Fiscal Year (FY) 2012 Budget Estimates, Aircraft Procurement, Vol. I, BA 1-4." Archived 2012-02-03 at the Wayback Machine Department of the Navy, February 2011, see p. 33.
  5. Defense Aircraft Investments: Major Program Commitments Based on Optimistic Budget Projections (testimony), FAS, March 5, 1997, GAO/T-NSIAD-97-103.