For but not with

Last updated

In military usage, fit to receive or fitting "for but not with" describes a weapon or system which is called for in a design but not installed or is only partially installed during construction, with the installation completed later as needed. This can be done to reduce the vessel's build cost by not purchasing the system at the time of construction, as a method of future-proofing a design, or for security purposes. [1] The term is usually used in regard to ships but sometimes extends to military vehicles, aircraft and other hardware. [1]

Provision is made physically with power supply and data wiring to a hardpoint or through software for the installation of a weapon or system which is marked for purchase at a later date, with installation during the vehicle's modernisation or refit. [1] Part of the justification for this design concept is the implicit assumption that in the event of the system being required (such as a war), there should be enough warning time to purchase the system, install it in the vehicle, and train operators in its use. [2]

Fitting for but not with can range anywhere between leaving sufficient space for any future upgrades, to installing a weapon system during construction but not purchasing ammunition until it is needed. [1] [3]

See also

Related Research Articles

<span class="mw-page-title-main">Military</span> Organization primarily tasked with preparing for and conducting war

A military, also known collectively as armed forces, is a heavily armed, highly organized force primarily intended for warfare. It is typically authorized and maintained by a sovereign state, with its members identifiable by their distinct military uniform. It may consist of one or more military branches such as an army, navy, air force, space force, marines, or coast guard. The main task of the military is usually defined as defence of the state and its interests against external armed threats.

<i>Daring</i>-class destroyer (1949) 1952 class of destroyers of the Royal and Royal Australian navies

The Daring class was a class of eleven destroyers built for the Royal Navy (RN) and Royal Australian Navy (RAN). Constructed after World War II, and entering service during the 1950s, eight ships were constructed for the RN, and three ships for the RAN. Two of the RN destroyers were subsequently sold to and served in the Peruvian Navy (MGP). A further eight ships were planned for the RN but were cancelled before construction commenced, while a fourth RAN vessel was begun but was cancelled before launch and broken up on the slipway.

<i>Anzac</i>-class frigate Australian military ship class

The Anzac class is a ship class of ten frigates; eight operated by the Royal Australian Navy (RAN) and two operated by the Royal New Zealand Navy (RNZN). During the 1980s, the RAN began plans to replace the River-class destroyer escorts with a mid-capability patrol frigate and settled on the idea of modifying a proven German design for Australian conditions. Around the same time, the RNZN was seeking to replace their Leander-class frigates while maintaining blue-water capabilities. A souring of relations between New Zealand and the United States of America in relation to New Zealand's nuclear-free zone and the ANZUS security treaty prompted New Zealand to seek improved ties with other nations, particularly Australia. As both nations were seeking warships of similar capabilities, the decision was made in 1987 to collaborate on their acquisition. The project name is taken from the Australian and New Zealand Army Corps of the First World War.

The Protecteur class of naval auxiliaries for the Royal Canadian Navy (RCN) began as the Joint Support Ship Project, a Government of Canada procurement project for the RCN that is part of the National Shipbuilding Procurement Strategy. It will see the RCN acquire two multi-role vessels to replace the earlier Protecteur-class auxiliary oiler replenishment vessels that were operated by the RCN.

A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.

The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities.

<i>Canberra</i>-class landing helicopter dock Australian naval amphibious ship class

The Canberra class is a ship class of two landing helicopter dock (LHD) ships built for the Royal Australian Navy (RAN). Planning to upgrade the navy's amphibious fleet began in 2000, based on Australian experiences leading the International Force for East Timor peacekeeping operation. With a new climate for growing Australian Navy spending, a desire existed for forward defence capability for landing and supporting troops on Asian territory, that had never existed in Australian history, even with the old Majestic-class light fleet carriers, HMAS Melbourne and HMAS Sydney in the 1970s. In 2004, French company Direction des Constructions Navales (DCN) and Spanish company Navantia were invited to tender proposals, with DCN offering the Mistral-class amphibious assault ship and Navantia proposing the "Buque de Proyección Estratégica" design. The Spanish design was selected in 2007, with Navantia responsible for construction of the ships from the keel to the flight deck, and BAE Systems Australia handling the fabrication of the combat and communications systems. Finally, Siemens (Germany) supplied and fitted the azimuth thrusters.

<i>Perth</i>-class destroyer

The Perth-class destroyers were three modified Charles F. Adams-class guided missile destroyers operated by the Royal Australian Navy (RAN). Ordered from Defoe Shipbuilding Company during 1962 and 1963, HMA Ships Perth, Hobart, and Brisbane were the first guided missiled-armed warships, and the first naval ships of United States design, to enter service with the RAN. All three ships operated during the Vietnam War, while Brisbane also participated in the Gulf War. The class was decommissioned between 1999 and 2001, with all three vessels later sunk as dive wrecks.

<span class="mw-page-title-main">Amphibious warfare ships of Australia</span>

The Royal Australian Navy and Australian Army have operated 24 amphibious warfare ships. These ships have been used to transport Army units and supplies during exercises and operational deployments.

<span class="mw-page-title-main">A Cooperative Strategy for 21st Century Seapower</span>

A Cooperative Strategy for 21st Century Seapower is the United States' maritime strategy. It was originally presented by the U.S. Chief of Naval Operations and the Commandants of the U.S. Marine Corps and U.S. Coast Guard at the International Seapower Symposium at the U.S. Naval War College in Newport, Rhode Island on October 17, 2007. The new maritime strategy explains the comprehensive role of the sea services in an era marked by globalization and uncertainty.

Tenix Defence was Australia's largest defence contractor with core capabilities in Aerospace, Land, Marine and Electronic Systems applications. BAE Systems announced its intention to acquire the company from Tenix in January 2008 and the acquisition was completed in June 2008 for A$775 million. BAE Systems Australia thus became Australia's largest defence contractor.

<span class="mw-page-title-main">Mexeflote</span> Landing raft

The Mexeflote is a landing raft used by the United Kingdom's Royal Logistic Corps and the Royal Australian Navy to move goods and vehicles between ship and shore. It was first used by British military in the 1960s. It was used during the Falklands conflict, and has been used in humanitarian aid missions. The system is very similar to the Rhino ferry.

Norman Friedman is an American internationally known author and analyst, strategist, and historian. He has written over 30 books and numerous articles on naval and other military matters, has worked for the U.S. Navy and Marine Corps, and has appeared on television programs including PBS, the Discovery Channel, C-SPAN, and National Geographic.

HMAS <i>Adelaide</i> (L01) Landing helicopter dock (ship) of the Royal Australian Navy (launched 2012)

HMAS Adelaide (L01) is the second of two Canberra-class landing helicopter dock (LHD) ships of the Royal Australian Navy (RAN) and is the largest naval vessel ever built for Australia. Construction of the ship started at Navantia's Spanish shipyard with steel-cutting in February 2010. The ship was laid down in February 2011, and launched on 4 July 2012. Delivery to Australia for fitting out at BAE Systems Australia's facilities in Victoria was scheduled for 2013, but did not occur until early 2014. Despite construction delays and predictions, the ship was commissioned in December 2015.

Vice Admiral Peter David Jones, is a retired senior officer in the Royal Australian Navy (RAN), who served as the Chief Capability Development Group (CCDG) from 2011 until his retirement in October 2014. He was succeeded as CCDG by Lieutenant General John Caligari.

ABFC <i>Ocean Shield</i>

Australian Border Force Cutter (ABFC) Ocean Shield is an offshore patrol vessel operated by the Australian Border Force. The ship was originally ordered in 2010 by DOF Subsea as an offshore support vessel, and was laid down by STX OSV as MSV Skandi Bergen in 2011. In 2012, the Australian Department of Defence was seeking a short-term replacement for the decommissioned Kanimbla-class amphibious landing ships, and negotiated to purchase the under-construction Skandi Bergen from DOF Subsea. The ship was completed, and entered Royal Australian Navy (RAN) service in mid-2012 as the civilian-crewed Australian Defence Vessel (ADV) Ocean Shield.

TCG <i>Anadolu</i> Turkish Navy ship

Anadolu (L-400) is an amphibious assault ship of the Turkish Navy that can be configured as a V/STOL aircraft carrier. It is named after the peninsula of Anatolia which forms the majority of the land mass of Turkey. The construction works began on 30 April 2016 at the shipyard of Sedef Shipbuilding Inc. in Istanbul, with the keel being laid on 7 February 2018, and is expected to be commissioned in 2022. The vessel is intended to meet the various needs and requirements of the Turkish Armed Forces, such as sustaining long-endurance, long-distance military combat or humanitarian relief operations; while acting as a command center and flagship for the Turkish Navy.

HMBS Lawrence Major is a support vessel operated by the Royal Bahamas Defence Force. She was built in the Netherlands by The Damen Group, to an adaptation to its Damen Stan Lander 5612 design.

F110-class frigate

The F110 class, also known as the Bonifaz class, are a multi-purpose, anti-submarine class of Aegis combat system-fitted heavy frigates under construction for the Spanish Navy. The project is being co-developed by the Spanish Ministry of Defence and the state-owned company Navantia. The construction of the first unit started in April 2022 and are scheduled to be delivered starting in about 2025.

References

Notes
  1. 1 2 3 4 Friedman, Seapower as strategy, p. 236
  2. Leschen, The nature of future conflict and its impact on Australia’s defence policy and force structure, pp. 57-8
  3. MacDonald, Navy logistic support resources developments and disaster relief, p. 33
Bibliography