Neyveli Uttar pradesh Power Limited-Ghatampur Thermal Power Project is a coal-based thermal power plant located in Ghatampur in Kanpur district, Uttar Pradesh, India. The power plant is owned by the Neyveli Uttar Pradesh Power Limited a joint venture between Neyveli Lignite Corporation (51%) and Uttar Pradesh Rajya Vidyut Utpadan Nigam (49%). [1]
COMMISSIONING OF UNITS:
Unit-1: 72Hrs continuous full load (660MW) Trial operation of is completed on 03-12-2024. Commercial operation commences on 12-12-2024.
Unit-2: First synchronization with 765kV grid on 21-07-2025. 72Hrs continuous full load (660MW) Trial operation is completed on 23-11-2025. Commercial operation commences on 09-12-2025.
The planned capacity of the power plant is 1980 MW. The power plant is secured with coal supply. [6]
| Unit Number | Capacity (MW) | Date of Commercial operation |
|---|---|---|
| 1 | 660 | 12 Dec 2024 |
| 2 | 660 | 09 Dec 2025 |
| 3 | 660 | Expected Mar 2026 Now |
The plant has a power purchase agreement (PPA) with Uttar Pradesh Power Corporation (UP Power Corporation) and Assam: