Neyveli Uttar pradesh Power Limited-Ghatampur Thermal Power Project is a coal-based thermal power plant located in Ghatampur in Kanpur district, Uttar Pradesh, India. The power plant is owned by the Neyveli Uttar Pradesh Power Limited a joint venture between Neyveli Lignite Corporation (51%) and Uttar Pradesh Rajya Vidyut Utpadan Nigam (49%). [1]

Contents

Status update


COMMISSIONING OF UNITS:

Unit-1: 72Hrs continuous full load (660MW) Trial operation of is completed on 03-12-2024. Commercial operation commences on 12-12-2024.

Unit-2: First synchronization with 765kV grid on 21-07-2025. 72Hrs continuous full load (660MW) Trial operation is completed on 23-11-2025. Commercial operation commences on 09-12-2025.

Capacity

The planned capacity of the power plant is 1980 MW. The power plant is secured with coal supply. [6]

Unit NumberCapacity (MW)Date of Commercial operation
166012 Dec 2024
266009 Dec 2025
3660Expected Mar 2026 Now

The plant has a power purchase agreement (PPA) with Uttar Pradesh Power Corporation (UP Power Corporation) and Assam:

References

  1. ↑ "Neyveli Lignite Corporation Limited". Archived from the original on 25 June 2014. Retrieved 5 August 2014.
  2. ↑ "Business News Today: Read Latest Business news, India Business News Live, Share Market & Economy News". The Economic Times.
  3. 1 2 Reporter, B. S. (30 May 2015). "NLC gets nod to start two investment projects of Rs 5,328 cr" – via Business Standard.
  4. ↑ "Centre to consider 1,980 MW Ghatampur project in Kanpur soon" – via The Economic Times.
  5. ↑ "NLC begins construction work for 1980-MW project in UP, Energy News, ET EnergyWorld". Archived from the original on 8 March 2017. Retrieved 7 March 2017.
  6. ↑ "States of India". Centre for Monitoring Indian Economy .