Heather oil field

Last updated
Heather oil field
North Sea relief location map.jpg
Red pog.svg
Location of Heather oil field
CountryUnited Kingdom
Regionnorthern North Sea
Location/block2/5
Offshore/onshoreOffshore
Coordinates 60°57′13″N00°56′23″E / 60.95361°N 0.93972°E / 60.95361; 0.93972
OperatorsUnionoil, Unocal, DNO, Lundin, Enquest
OwnerSee text
Field history
Discovery1973
Start of production1978
Peak of production1982
Production
Recoverable oil (million tonnes)14.1
Producing formationsJurassic sandstone

The Heather oil field is a significant crude oil producing field in the UK sector of the northern North Sea, 458 km north-north-east of Aberdeen. Production of oil started in 1978 and ceased in 2019. The Heather Alpha installation is currently (2021) undergoing decommissioning.

Contents

The field

The Heather oil field is located in Block 2/5 of the UK North Sea. It is named after the plant that grows extensively on Scottish moors. [1] The Heather field was discovered in December 1973 and comprises a middle Jurassic sandstone at a depth of 9,800 to 11,750 feet (2,9873 to 3,581 m). [2] The reservoir and its fluids had the following characteristics: [2]

Heather reservoir fluids
ParameterValue
Porosity1.7-19.3 %
Water saturation21.4-56.3 %
API gravity 35°API
Gas Oil Ratio 650 standard cubic feet/barrel
Sulfur content0.7 %
Recoverable reserves90-120 million barrels, 14.1 million tonnes

Owners and operators

The initial owners of the field were a consortium comprising Unionoil Company of Great Britain (31.25%), Texaco North Sea UK Ltd (31.25%), Tenneco Great Britain Ltd (31.25%), and DNO (UK) Ltd. (6.25%). The field was operated by Unionoil Company of Great Britain. [2] In 1994 the owners were BG Great Britain Limited (31.25%), Texaco Exploration Ltd (31.25%), Unocal Britain Ltd (31.25%), and DNO (Heather Oilfield) Ltd (6.25%). The operator was Unocal. [1] In 1999 DNO became the operator, then Lundin from 2008, and finally Enquest. [3]

Development

The field was developed by a single integrated drilling, production and accommodation platform: Heather Alpha (Heather A). The principal design data of the Heather A platform is given in the following table. [2]

Heather A platform design
InstallationHeather A
Coordinates60°57’13”N 00°56’23”E
Water depth, metres143
Fabrication substructureMcDermott, Ardersier
Topsides designMcDermott
Topside weight, tonnes22,000
FunctionDrilling, production, accommodation
Accommodation (crew)180
TypeSteel jacket
Legs8
Piles24
Well slots40
Throughput oil, barrels per day (bpd)60,000
Water injection, bpd100,000
Platform installedJune 1977
Production startOctober 1978
Oil production toNinian Central
Gas production toUsed onboard for gas lift and fuel gas

Processing

The wellhead fluids flowed via the production manifold to the 3-phase Production Separator which operated at 65 psi (448 kPa). [4] From the Separator oil was routed to another 3-phase Production Separator operating at a lower pressure of 35 psi (241 kPa). Oil then flowed to the crude booster pumps, through oil metering then by 32 km 16-inch pipeline to Ninian Central and thence to Sullom Voe. Produced water from the separators was treated by hydrocylones and a compact flotation unit (CFU) to remove oil prior to overboard discharge. Vapour from the Production Separators was compressed, dried by TEG (triethylene glycol) and further compressed to 325 psi (2,241 kPa) for use as fuel gas and up to 1,480 psi (10,204 kPa) for gas lift. [4] In 1985 a connection was made to the Western leg gas pipeline, a 6-inch pipeline imported gas into Heather to augment gas supplies. [1] Import gas flowed to an Import Gas Knockout Drum, through metering and to an Import Gas Heater. [4]

The oil production profile for Heather A (in 1000s barrels per year) in the early operating period is shown in the graph: [2]

The fluid handling capability of the Heather facilities in its latter years was as follows: [5]

Heather A processing capability
FacilityCapacity
Crude oil30,000 bbls/day
Gas compression54 MMSCFD (million standard cubic feet per day)
Dehydration54 MMSCFD
Gas lift54 MMSCFD
Produced water50,000 bbl/day
Water injection70,000 bbl/day

Broom oil field

Fluids from the Broom oil field in Block 2/4a were routed into Heather for treatment and export to Ninian Central. [6] The Broom field is located 7 km from Heather. The field development comprised four gas-lifted production wells and two water injection wells. Lift gas and injection water were supplied from Heather A. Production from Broom started in 2004. [6]

Decommissioning

Following a fire on Heather A in October 2019 and the shutdown of the platform [7] Enquest decided to decommission the platform. [8] This was principally due to the low oil price environment during the coronavirus pandemic. [8] The topsides will be removed for onshore recycling and disposal. [9] The removal of the jacket will be the subject off a further plan. [9]

Related Research Articles

<span class="mw-page-title-main">Brent oilfield</span> Former oilfield in the North Sea

The Brent field was an oil and gas field located in the East Shetland Basin of the North Sea, 186 kilometres (116 mi) north-east of Lerwick in the Shetland Islands, Scotland, at a water depth of 140 metres (460 ft). The field operated by Shell UK Limited was discovered in 1971 and was once one of the most productive parts of the UK's offshore assets but has reached the stage where production is no longer economically viable. Decommissioning of the Brent field is complete with the exception of Brent C, which is producing from another field. The discovery well 211/26-1 was drilled in 1971 by the semi-submersible drilling rig "Staflo". This was a major surprise at the time as the nearest land in Scotland and Norway is composed of granite and other non reservoir metamorphic rocks.

The Dunlin oilfield is situated 195 km northeast of Lerwick, Shetland, Scotland, in block number 211/23a and 211/24a. It was originally operated by Shell but was sold in 2008 and is now operated by Fairfield Energy and partners MCX.

The Eider Oilfield is situated 184 kilometres (114 mi) north east of Lerwick, Shetland Islands, Scotland, in block numbers 211/16a and 211/21a. It is operated by Abu Dhabi National Energy Company (TAQA). It was discovered in May 1976 in a water depth of 157.5 metres (517 ft). Estimated recovery is 85 million barrels (13,500,000 m3) of oil.

Platform Name - Tern Alpha.

The Ninian Central Platform is an oil platform in the North Sea. When constructed in Loch Kishorn, Scotland in 1978 the 600,000 tonne platform was the world's largest man-made movable object before being towed to its current position and sunk to the sea floor.

The Clair oilfield is an offshore oil field in Scottish territorial waters 75 kilometres (47 mi) west of Shetland in water depths of up to 140 metres (460 ft). The field is the largest oilfield on the UK Continental Shelf with an estimated 8 billion barrels of oil-in-place, according to the BP Plc’s website. It extends over an area of some 220 square kilometres (85 sq mi), covering five licence blocks.

An oil production plant is a facility which processes production fluids from oil wells in order to separate out key components and prepare them for export. Typical oil well production fluids are a mixture of oil, gas and produced water. An oil production plant is distinct from an oil depot, which does not have processing facilities.

The Hutton oil field, located on the UK continental shelf, was the location for the first ever production Tension Leg Platform (TLP).

<span class="mw-page-title-main">Tyra Field</span>

Tyra Field is the largest gas condensate field in the Danish Sector of the North Sea. It was discovered in 1968 and production started in 1984. The field is owned by Dansk Undergrunds Consortium, a partnership between Total, Noreco and Nordsofonden, and operated by Total. The reservoir depth is about 2,000 metres (6,600 ft) and it covers area of 90 kilometres (56 mi) in the water depth of 37–40 metres (121–131 ft).

The Thistle oil field is a large oil field in the northern sector of the North Sea. The oil field, discovered in September 1972 by Signal Oil and Gas Company, is produced over the Thistle Alpha platform, located 125 nautical miles northeast of Sumburgh, Shetland Islands and 275 nautical miles Northeast of Aberdeen, Scotland.

<span class="mw-page-title-main">Buzzard oil field</span>

The Buzzard Oil Field is an oil field located in the North Sea Blocks 19/10, 19/5a, 20/6 and 20/1s. It was discovered in 2001 by PanCanadian, and developed initially by PanCanadian's successor EnCana and then by Nexen. The oil field was initially operated and owned by Nexen which is now a subsidiary of China's CNOOC.

Gannet is an oil and gas field located in the United Kingdom's continental shelf in the North Sea. It is 180 km (110 mi) east of Aberdeen, and the water depth at the Gannet offshore installation is 95 m (312 ft). The field is located in Blocks 22/21, 22/25, 22/26 and 21/30. It is half-owned by Royal Dutch Shell (50%) and partly by ExxonMobil (50%) and has been operated by Shell UK Ltd since ‘first oil’ in November 1993. The Gannet A installation is the host platform for subsea tiebacks designated Gannet B to G. Like most Shell fields in the central and northern North Sea the field is named after a sea bird the gannet.

The Claymore oil field is located in Block 14/19 on the United Kingdom's Continental Shelf. It is 161 km (100 mi) northeast of Aberdeen in the Central North Sea. The field is named after a double-edged broadsword used by Highland Scots. Recoverable oil reserves were estimated to be 511 million barrels from an initial oil in place of 1452.9 million barrels. The field was developed through a large steel jacket platform standing in 110 m of water. A separate accommodation platform was installed in 1995. Fluid production was supported by gas lift and significant water injection. The production platform also supports production from the Scapa field, the Golden Eagle field and the Tartan field. Oil is exported to the Flotta terminal.

The Beryl oil field is a major crude oil production field in the UK sector of the northern North Sea, 335 km north east of Aberdeen. Production of oil started in 1976 and the field is still producing oil and gas (2021).

The Tartan oil field is a significant crude oil producing field in the UK sector of the North Sea, 187 km north-east of Aberdeen. Production of oil started in 1981 and ceased in 2020, the Tartan Alpha installation is currently (2021) undergoing decommissioning.

The Clyde oil field is a crude oil producing field in the UK sector of the North Sea, 290 km east-south-east of Aberdeen. Production of oil started in 1987 and the field is still operational (2021).

The Balmoral oil field is a depleted crude oil field in the UK sector of the central North Sea, 225 km north-east of Aberdeen. Oil was produced from the field reservoir by the Balmoral Floating Production Vessel (FPV) between 1986 and 2020. The Balmoral FPV also processed oil from six minor oil fields in the area. Oil production from the field has ceased.

<span class="mw-page-title-main">Ravenspurn gas fields</span>

The Ravenspurn gas fields are two adjacent natural gas fields located in the UK sector of the southern North Sea about 65 km east of Flambrough Head, Yorkshire.

The K13 gas fields were major natural gas producing fields in the Netherlands sector of the North Sea, about 130 km west of Den Helder. The fields started producing gas in 1975 but are no longer operational except for one installation used as a riser platform.

The Lincolnshire Offshore Gas Gathering System (LOGGS) was a major natural gas collection, processing and transportation complex in the UK sector of the southern North Sea. It comprised five bridge-linked platforms about 118 km east of the Lincolnshire coast, which operated from 1988 to 2018. 

References

  1. 1 2 3 Department of Trade and Industry (1994). The Energy Report. London: HMSO. pp. 56 and map 6. ISBN   0115153802.
  2. 1 2 3 4 5 Oilfield Publications Limited (1985). The North Sea Platform Guide. Ledbury: Oilfield Publications Limited. pp. 284–89.
  3. A Barrel Full (2015). "Heather oil and gas field". abarrelfull. Retrieved 17 October 2021.
  4. 1 2 3 Heather A Process Flow Diagrams, Lundin, undated
  5. Enquest (March 2019). "Heather Platform High Level Capacity Information" (PDF). enquest.com. Retrieved 17 October 2021.
  6. 1 2 "Ithaca Energy Non Operated Assets The Broom Field". www.ithacaenergy.com. Retrieved 17 October 2021.
  7. "Enquests Thistle and Heather platforms still shut production to resume in 2020". Offshore Energy. October 2019. Retrieved 17 October 2021.
  8. 1 2 "Enquest files decom plans for Heather topsides". offshore-energy.biz. 12 April 2021. Retrieved 17 October 2021.
  9. 1 2 "Heather Alpha Platform Topsides decommissioning Programme" (PDF). www.enquest.com. Retrieved 17 October 2021.