Overview
StatusUnder construction
Owner Indian Railways
Locale Odisha
Termini
Service
Type1,676 mm (5 ft 6 in)
Operator(s) East Coast Railway zone
Technical
Line length255 KM completed. Completed sections = Bolangir to Adhonigarh 140 KM and Daspalla to Khurda Road 115 KM
Track length306.25 km (190 mi) [1]
Number of tracks1
Track gauge 1,676 mm (5 ft 6 in)
Electrification work is under progress
Operating speed130 km/h (81 mph)
Route map

Contents

km
BSicon dCONTgq.svg
BSicon STR+r.svg
BSicon BHF.svg
0
Balangir
BSicon xABZgl.svg
BSicon dCONTfq.svg
BSicon exHST.svg
16
Bichhupali
BSicon exHST.svg
26
Jhartarbha
BSicon exHST.svg
49
Sonepur
BSicon exHST.svg
64
Jharsamunda
BSicon exHST.svg
81
Boudh
BSicon exHST.svg
110
Champapur
BSicon exHST.svg
112
Puranakatak
BSicon exHST.svg
130
Charichhack
BSicon exHST.svg
140
Adhonigarh
BSicon exHST.svg
149
Banigoccha
BSicon exHST.svg
165
Buguda
BSicon exHST.svg
191
Dasapalla
BSicon exHST.svg
208
Nuagaon
BSicon KHSTxa.svg
218
Mahipur
BSicon HST.svg
230
Nayagarh Town
BSicon HST.svg
242
Bolagarh Road
BSicon HST.svg
249
Bolagarh Town PH
BSicon HST.svg
260
Rajasunakhala
BSicon HST.svg
278
Begunia
BSicon HST.svg
291
Khurda Town
BSicon d-CONT2.svg
BSicon STR+c3.svg
BSicon dSTRc1.svg
BSicon dCONTgq.svg
BSicon STR+4.svg
BSicon ABZg+r.svg
BSicon BHF.svg
306
Khurda Road Junction
BSicon CONT2+g.svg
km

The Khurda Road-Bolangir line is a rail line between Khurda Road Junction and Balangir which is under construction.

History

It was surveyed in 1945 but the project was sanctioned in 1994–95. The state government has signed Memorandum of Understanding with Indian Railways to undertake some parts of the project on cost sharing basis.

The project which was initially estimated to be ₹1,000 crore (US$160 million) is now estimated to be nearly ₹2,000 crore (US$310 million) after almost 20 years of delay due to low budgetary provisions and issues of land acquisition.

This rail line will link cities of Nayagarh, Phulbani, Boudh and Sonepur with Bhubaneswar and Bolangir. Smaller towns like Tarbha, Daspalla, Banigochha and Mahipur will also be linked by this rail line. Work at Bolangir side of this project is completed till Adhonigarh.

The Khurda Road–Bolangir rail line will connect Khurda Road to Balangir in a shorter way through Daspalla. [2]

A new 306.25 km-long railway line from Balangir to Khurda Road junction was sanctioned in 1994 and its foundation stone was laid in June 2001 but there has been very little progress in construction of this railway line. Out of 306.25 km length, 26 km is in Balangir district. Even all the land required for the railway line had not been acquired until the end of 2011.

In 2015–16 Rail Budget, the rail line got a green signal from Minister of Railways Suresh Prabhu as Rs 4682 crore was allotted for Odisha. As construction will be done in three phases, first between Khurda Road to Begunia a 36 km stretch then 76 km from Begunia to Daspalla and 194.25 km from Daspalla to Balangir via Phulbani & Bhainsapali under the review of Chief Minister of Odisha Naveen Patnaik. [3] [4] [5] [6]

In July 2016, Railway minister Suresh Prabhu inaugurated the Khordha RoadBegunia 36 km stretch and tracks are being laid from Begunia to Nayagarh which was completed by June 2017 and whole project to be completed in 2021. Presently five trains run regularly between Khurda Road (KUR) and Nayagarh Town (NYGT) station.

On 15 January 2019 the prime minister of India, Sri Narendra Modi inaugurated the first train from Balangir to Bicchupalli Station on Bolangir–Khurda Road route.

This will connect Nayagarh, Phulbani, Boudh, Sonepur and Balangir which are economically backward districts in the state. [7]

Current status

The 41.5 km railway line between Khurda Road and Rajsunakhala has already been commissioned and two pairs of trains are running along the stretch.

On 20 March 2017, Mr Suresh Prabhu flag off the extension of Khurda Road-Rajsunakhala passenger train up to newly built Bolagarh Road station.

Nayagarh was put on the railway map of the country on 19 June 2017 when railway minister Suresh Prabhu formally dedicated the new line from Bolagarh Road to Nayagarh as part of the ongoing Khurda Road-Balangir project. Mr Suresh Prabhu commissioned the 12.8 km line formally by video link from New Delhi.

On 30 October 2018, a trial run on the newly laid railway track between Bolangir and Bhainsapalli(renamed as Bhichhupalli) on Khurda–Bolangir route was conducted.

On 15 January 2019 the prime minister of India, Sri Narendra Modi inaugurated the first train from Balangir to Bicchupalli station on Bolangir–Khurda Road route.

The East Coast Railway (ECoR) on Saturday (20 July 2019) conducted trial run of an engine on newly built track from Nayagarh Town to Mahipur (12 km) in the ongoing Khurda Road–Balangir (289-km) railway line project. ECoR has already completed and commissioned about 80 km of rail line, including 65.455 km from Khurda Road to Nayagarh Town and 14.580 km from Balangir to Bichhupalli of the 25-year-old project. With the newly built 12 km rail line from Nayagarh Town to Mahipur, altogether 92 km rail line of Khurda Road–Balangir ongoing project has been completed.

Union Minister Dharmendra Pradhan on Thursday (26 December 2019) inaugurated the railway line between Nayagarh Town and Mahipur railway station as part of the ongoing Khurda Road–Bolangir rail project.

Commissioner of Railway Safety (CRS), South Eastern Circle, Kolkata inspected the 13.050 km long rail line between Mahipur and Nuagaon Station of the ongoing Khurda Road-Balangir Rail Line project on 23rd March 2022.

On 30 June 2022, Railway minister Mr Ashwini Vaishnaw opened the 13-km Mahipur-Nuagaon railway section of the Khurda Road-Balangir line.

The newly-laid Broad Gauge Rail Line of 10.65 km between Bichhupali and Jhartarbha of Khurda Road-Balangir Rail Line project has been completed the East Coast Railway (ECoR) informed on 10 Nov 2022. commissioned and inauguration by Sri Narendra Modi on 18th May 2023. [8] There was a trial run conducted between the two station on 26 July 2023.

On December 19, 2023, the Khurda-Balangir Rail Line Project witnessed a significant advancement with a trial run between stations in Subarnapur district. This trial run encompassed the stretch from Khambeswaripali to Sonepur, marking a crucial phase of the project after the completion of 49 KM from Balangir side up to Sonepur railway station.

On January 3, 2024, the General Manager of the East Coast Railway (ECoR), Manoj Sharma, announced that the ECoR plans to extend the line by 73 km from Sonepur to Purunakatak in Boudh district by the end of 2024. Additionally, in a strategic move, the ECoR has revised the project deadline to December 2026. [9]

On January 6, 2024, Railway Minister Ashwini Vaishnaw inaugurated the Daspalla station in Odisha's Nayagarh district and the Nuagaon Road-Daspalla line. [10]

On February 3, 2024, Prime Minister Narendra Modi inaugurated the Puri-Sonepur-Puri Weekly Express at an event in Sambalpur district. This new weekly train service, set to commence on February 8, marks the inclusion of Sonepur district in the railway network map. The train from Puri to Sonepur will operate every Thursday, and the return journey from Sonepur to Puri will be available every Friday [11] . [12]

Related Research Articles

<span class="mw-page-title-main">East Coast Railway zone</span> Railway zone in India

The East Coast Railway is one of the 19 railway zones of Indian Railways. It came into existence on 1 April 2003. The headquarters of the zone are at Bhubaneswar, Odisha

<span class="mw-page-title-main">Khordha district</span> District of Odisha in India

Khordha district is an administrative division of the state of Odisha, India. It was formed on April 1, 1993, by the division of former Puri District into Puri, Khordha and Nayagarh districts. In the year 2000 the district name was changed to Khordha. The district headquarters is Khordha Town. The capital city of Bhubaneswar is located in this district. Khordha is the most urbanized of all the districts of Odisha.

<span class="mw-page-title-main">Balangir</span> City in Odisha, India

Balangir also known as Bolangir, is a city and municipality, the headquarters of Balangir district in the state of Odisha, India. Balangir has one of the best cultural heritage in India. It is also known as one of the finest places for tourists in Odisha. Balangir municipality is divided into twenty-one wards. It is spread over an area of 12,200 acres (4,900 ha).

<span class="mw-page-title-main">Nayagarh</span> Town in Odisha, India

Nayagarh is both a town and the municipality headquarters of the Nayagarh district in the Indian state of Odisha.

<span class="mw-page-title-main">Jatani</span> Town in Odisha, India

Jatani is a town and a major sub-urban area of Bhubaneswar, the state capital of Odisha. It is also a municipality in Khordha district in the Indian state of Odisha. Jatani, also known as Khurda Road Junction in Indian Railways parlance, acts as an important railway junction between the main railroads running between Kolkata and Chennai, with diversions to the Hindu pilgrimage city of Puri, and to Balangir, passing through the districts of Nayagada, Daspalla, Phulbani, Boudh and Sonepur the vast tribal hinterland of Odisha. It has emerged as a commercial hub with a number of educational and other institutions. It is home to Premier Public Institutes like NISER and IIT-Bhubaneswar and ICAR- International Centre for Foot and Mouth Disease (ICFMD). Jatni is famous for its celebration of the festival of Ganesh Chaturthi.

Nuagan is a town in Nayagarh district of Odisha state of India.

<span class="mw-page-title-main">Dashapalla</span> Town in Odisha, India

Dashapalla, also known as Daspalla, is an archaeologically important site situated in Nayagarh district, Odisha, India.

<span class="mw-page-title-main">Jharsuguda–Vizianagaram line</span> Railway line in India

The Jharsuguda–Vizianagaram line is a railway line in eastern India. It connects Jharsuguda,516 km (321 mi) from Howrah on the Howrah–Nagpur–Mumbai line, and Titlagarh, which in turn is connected with Vizianagaram, 820 km (510 mi) from Howrah on the Howrah–Chennai main line, and Raipur Junction, 830 km (516 mi) from Howrah on the Howrah–Nagpur–Mumbai line. There are several branch lines, like the 176 km (109 mi) line connecting Rayagada with Koraput on the Kothavalasa–Kirandul line. The line traverses Western Odisha and connects the Howrah–Nagpur–Mumbai line with the Howrah–Chennai main line. It covers small portions of Chhattisgarh and Andhra Pradesh.

<span class="mw-page-title-main">Kharagpur–Puri line</span> Railway route of India

The Kharagpur–Puri Line is a railway line connecting Kharagpur in the Indian state of West Bengal and Puri in Odisha. The total line can be divided into sections. The Kharagpur–Khurda Road portion of this line, which is a part of the Howrah–Chennai main line and Khurda Road - Puri portion.

New Jagannath Sadak - The road to Jagannath Dham, Puri :

Balangir Junction railway station is a railway station which serves Balangir district in the Indian state of Odisha.

<span class="mw-page-title-main">Odisha State Open University</span> Public open university in Odisha, India

Odisha State Open University (OSOU) is a distance learning state university located in Sambalpur, Odisha, India. The university is established by an Act of the Odisha State Legislature in 2015. The university has jurisdiction over the entire State of Odisha.

The Khurda Road–Nayagarh Town Passenger is a Passenger train belonging to East Coast Railway zone that runs between Khurda Road Junction railway station and Nayagarh Town, in the Eastern Indian state Odisha.

Nayagarh Town Railway Station is the main railway station in Nayagarh District, Odisha. Its code is NYGT. It serves Nayagarh City. The station consists of two platforms.

Rajsunakhala(ରାଜସୁନାଖଳା) is a census town in Nayagarh district of Indian state Odisha. It was declared a census town in the 2011 census. It is 60 km away from Bhubaneswar, the capital of Odisha. This is the gateway of Nayagarh district for Khurda road - Bolangir railway line. This serves as a major trading point in the region.

<span class="mw-page-title-main">Charhi railway station</span> Railway station in Jharkhand

Charhi Railway Station is a station on the Koderma–Hazaribagh–Barkakana line in Churchu, Hazaribagh district, Jharkhand serving Charhi and nearby areas.

Naraj Marthapur railway station is a railway station on the East Coast Railway network in the state of Odisha, India. It serves Naraj Marthapur village. Its code is NQR. It has three platforms. Passenger, MEMU, Express and Superfast trains halt at Naraj Marthapur railway station.

Sagadapata railway station is a railway station on the East Coast Railway network in the state of Odisha, India. It serves Sagadapata village. Its code is SGDP. It has two platforms. Passenger, MEMU, Express trains halt at Sagadapata railway station.

Bir Purushottampur railway station is a railway station on Kharagpur–Puri line in East Coast Railway zone under Khurda Road railway division of Indian Railways. The station is situated at Satasankha, Bir Purushottampur in Puri district of the Indian state of Odisha.

Malatipatpur railway station is a railway station on Kharagpur–Puri line in East Coast Railway zone under Khurda Road railway division of Indian Railways. The station is situated beside Puri-Balanga Road at Malatipatapur in Puri district of the Indian state of Odisha.

References

  1. "Length of the track" . Retrieved 6 September 2014.
  2. "Odisha to provide free land, bear 50% cost of Khurda–Bolangir railway project". The Hindu. 25 January 2014. Retrieved 26 October 2018.
  3. Bijoy, Sujit (17 September 2015). "Khurda Road-Balangir rail line work from Dec". The Times of India. Retrieved 26 October 2018.
  4. Odisha CM plea to Prabhu for MoUs on new rail lines
  5. Naveen Patnaik Reviews Khurda-Balangir Rail Project
  6. Odisha, Rlys in pact for Khurda Road–Bolangir rail link
  7. Train services to be extended to Bolagarh by June end
  8. "Bichhupali-Jhartarbha Rail Line of Khurda Road-Balangir Rail Line Project Completed: ECoR". 12 November 2022.
  9. "Railways targets to complete Sonepur-Purunakatak section in 2024". The Times of India. 3 January 2024. ISSN   0971-8257 . Retrieved 19 January 2024.
  10. "Odisha's development is PM's commitment: Vaishnaw after inaugurating station, rail line". 6 January 2024.
  11. Bureau, O. B. (3 February 2024). "Sonepur On Rail Network Map As PM Modi Flags Off First Train To This Odisha District". odishabytes. Retrieved 4 February 2024.
  12. "PM flags off Puri-Sonepur Express in Odisha". 3 February 2024.