The Launch Processing System (LPS) is an automated, computer-controlled system at the Kennedy Space Center (KSC) which oversees and coordinates the processing and checkout of systems and components for the Space Shuttle launch vehicle and its payloads. [1] The LPS automatically performs tests on much of the vehicle components as they are being readied for launch, and alerts operators if any anomalies are detected. [2] The LPS also manages the launch countdown events, culminating in a successful launch.
Early in the design of the Space Shuttle program, the expected launch rate was 12 flights per year. [3] The LPS was designed to oversee and manage the parallel processing of multiple orbiters and their subsystems in order to meet this launch schedule. [1] The LPS tracks and manages all components of the Space Shuttle launch vehicle from the time the individual components arrive at KSC, through checkout, integration, testing, installation, and finally culminating in a launch.
Any time a component is functioning, sensors within the component relay data on its performance back to the LPS, which checks these results against the expected normal conditions. If the result is unsatisfactory, the LPS then alerts an operator and provides data as to the nature of the component's performance, so that any fault may be isolated and resolved. [2]
Because the LPS monitors thousands of individual parameters on the Shuttle and support equipment, the number of personnel required in the firing room is less than half of the 450 engineers required for an Apollo program launch. [1]
The LPS is composed of three major subsystems: the Checkout, Control and Monitor Subsystem (CCMS), the Central Data Subsystem (CDS), and the Record and Playback Subsystem (RPS). [1]
The Checkout, Control and Monitor Subsystem (CCMS) controls the actual processing and launch of the Space Shuttle. [4] This subsystem consists of the staffed consoles in the firing room, as well as minicomputers, and data transmission and recording systems, which monitor the pre-launch performance of all electrical and mechanical systems on board the Shuttle vehicle. The various systems being monitored are managed from operator-controlled consoles, which are clustered together based on the type of systems. [1] The LPS master console in the firing room links the CCMS with the other subsystems of the LPS.
The Central Data Subsystem (CDS) consists of a cluster of high-end minicomputers which store vital data such as vehicle test and performance data, test procedures, historical data, etc. [4] There are two primary interfaces into the CDS. The first is a real-time interface with the CCMS. The second is a video simulation interface which allows testing of firing room systems without the need to have a vehicle present. [1]
The CDS originally consisted of two mainframe computers. It was upgraded in 1999 to its current clustered state, and was renamed the Shuttle Data Center (SDC) [1]
The CDS/SDC is located on the second floor of the Launch Control Center.
The Record and Playback Subsystem (RPS), as the name implies, records unprocessed data from various sources during testing and countdown. This can be played back at a later time for analysis. The RPS consists of tape recorders, telemetry equipment, and computers to perform analysis and data reduction. [4]
The John F. Kennedy Space Center, located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968, KSC has been NASA's primary launch center of human spaceflight, research, and technology. Launch operations for the Apollo, Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC. Located on the east coast of Florida, KSC is adjacent to Cape Canaveral Space Force Station (CCSFS). The management of the two entities work very closely together, share resources and operate facilities on each other's property.
The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development.
A spacecraft is a vehicle that is designed to fly in outer space and operate there. Spacecraft are used for a variety of purposes, including communications, Earth observation, meteorology, navigation, space colonization, planetary exploration, and transportation of humans and cargo. All spacecraft except single-stage-to-orbit vehicles cannot get into space on their own, and require a launch vehicle.
STS-93 in 1999 marked the 95th launch of the Space Shuttle, the 26th launch of Columbia, and the 21st night launch of a Space Shuttle. Eileen Collins became the first female shuttle Commander on this flight. Its primary payload was the Chandra X-ray Observatory. It would also be Columbia's last mission until March 2002. During the interim, Columbia would be out of service for upgrading and would only fly again on STS-109. The launch was originally scheduled for 20 July, but it was aborted at T−7 seconds. The successful launch of the flight occurred three days later. The payload was also the heaviest ever carried by the Space Shuttle system, at over 22.7 tonnes.
STS-88 was the first Space Shuttle mission to the International Space Station (ISS). It was flown by Space Shuttle Endeavour, and took the first American module, the Unity node, to the station.
The European Robotic Arm (ERA) is a robotic arm that is attached to the Russian Orbital Segment (ROS) of the International Space Station. Launched to the ISS in July 2021; it is the first robotic arm that is able to work on the Russian Segment of the station. The arm supplements the two Russian Strela cargo cranes that were originally installed on the Pirs module, but were later moved to the docking compartment Poisk and Zarya module.
Launch Complex 39 (LC-39) is a rocket launch site at the John F. Kennedy Space Center on Merritt Island in Florida, United States. The site and its collection of facilities were originally built as the Apollo program's "Moonport" and later modified for the Space Shuttle program.
The Rocco A. Petrone Launch Control Center is a four-story building at NASA's Kennedy Space Center on Merritt Island, Florida, used to manage launches of launch vehicles from Kennedy Space Center Launch Complex 39. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking, and instrumentation equipment; and firing rooms.
Flight controllers are personnel who aid space flight by working in such Mission Control Centers as NASA's Mission Control Center or ESA's European Space Operations Centre. Flight controllers work at computer consoles and use telemetry to monitor various technical aspects of a space mission in real-time. Each controller is an expert in a specific area and constantly communicates with additional experts in the "back room". The flight director, who leads the flight controllers, monitors the activities of a team of flight controllers, and has overall responsibility for success and safety.
The Neil Armstrong Operations and Checkout Building (O&C) is a historic building on Merritt Island, Florida, United States. The five-story structure is in the Industrial Area of NASA's Kennedy Space Center. Its has twin-block facilities that include the crew quarter dormitories for astronauts, suit-up preparations prior to their flights, and the other is a large spacecraft workshop used for manufacturing and checking activities on crewed spacecraft. On January 21, 2000, it was added to the U.S. National Register of Historic Places.
The Space Station Processing Facility (SSPF) is a three-story industrial building at Kennedy Space Center for the manufacture and processing of flight hardware, modules, structural components and solar arrays of the International Space Station, and future space stations and commercial spacecraft. It was built in 1992 at the space complex's industrial area, just east of the Operations and Checkout Building.
Ares I-X was the first-stage prototype and design concept demonstrator of Ares I, a launch system for human spaceflight developed by the National Aeronautics and Space Administration (NASA). Ares I-X was successfully launched on October 28, 2009. The project cost was $445 million.
NASA's Christopher C. Kraft Jr. Mission Control Center, also known by its radio callsign, Houston, is the facility at the Lyndon B. Johnson Space Center in Houston, Texas, that manages flight control for the United States human space program, currently involving astronauts aboard the International Space Station (ISS). The center is in Building 30 at the Johnson Space Center and is named after Christopher C. Kraft Jr., a NASA engineer and manager who was instrumental in establishing the agency's Mission Control operation, and was the first Flight Director.
A launch status check, also known as a "go/no go poll" and several other terms, occurs at the beginning of an American spaceflight mission in which flight controllers monitoring various systems are queried for operation and readiness status before a launch can proceed. For Space Shuttle missions, in the firing room at the Launch Control Center, the NASA Test Director (NTD) performed this check via a voice communications link with other NASA personnel. The NTD was the leader of the shuttle test team responsible for directing and integrating all flight crew, orbiter, external tank/solid rocket booster and ground support testing in the shuttle launch countdown. The NTD was also responsible for the safety of all personnel inside the pad after external tank loading, including the flight crew, about 10 go/no go reports. He reported to the Launch Director, who has another about 5 go/no go reports. The Launch director declares if a mission is go for launch.
The Merritt Island Spaceflight Tracking and Data Network station, known in NASA parlance as MILA, was a radio communications and spacecraft tracking complex located on 61 acres (0.25 km2) at the Kennedy Space Center (KSC) in Florida. The name MILA was an acronym for the "Merritt Island Launch Annex" to Cape Canaveral Air Force Station, which was how the site was referred to when spacecraft launches were primarily originating from the adjacent military installation. MILA's arrays of antennas provided various communications and data services between spacecraft and NASA centers, as well as tracked and ranged moving spacecraft. In its final years, it served as the primary voice and data link during the first 7½ minutes of Space Shuttle launches, and the final 13 minutes of shuttle landings at KSC. Though it occupied land at KSC, MILA was operated and managed by the Goddard Space Flight Center.
Paul Charles Donnelly was an American guided missile pioneer and a senior NASA manager during the Apollo Moon landing program at the Kennedy Space Center (KSC). Responsible for the checkout of all Apollo launch vehicles and spacecraft, he was also involved in every U.S. manned launch from Alan Shepard's Mercury suborbital flight in 1961 through the tenth Space Shuttle mission (STS-41B) in 1984.
The Spacecraft Assembly and Checkout Building was built in 1959 for a Department of Defense missile program. The facility was acquired in 1960 by NASA and modified for unmanned missions.
NASA's Exploration Ground Systems (EGS) Program is one of three programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft during assembly, transport and launch. EGS is preparing the infrastructure to support NASA's Space Launch System (SLS) rocket and its payloads, such as the Orion spacecraft for Artemis I. Artemis I is the first to launch in a series of increasingly complex missions that will enable human exploration to the Moon and Mars.
The project to create the International Space Station required the utilization and/or construction of new and existing manufacturing facilities around the world, mostly in the United States and Europe. The agencies overseeing the manufacturing involved NASA, Roscosmos, the European Space Agency, JAXA, and the Canadian Space Agency. Hundreds of contractors working for the five space agencies were assigned the task of fabricating the modules, trusses, experiments and other hardware elements for the station.